Butler Solar Project 103

765 West Fall Line Freeway, Butler, GA 31006

Plant Summary Information

Butler Solar Project 103 is ranked #48 out of 238 power plants in Georgia in terms of total annual net electricity generation.

Butler Solar Project 103 generated 67.7 GWh during the 3-month period between May 2024 to August 2024.

Plant NameButler Solar Project 103
Utility NameSouthern Power Co
LocationTaylor County, GA
Initial Operation DateDecember 2016
Last Update Aug 2024
Annual Generation 213.9 GWh
Annual Consumption 808.7 k MMBtu
Ranked #2,230 out of 11,835 Power Plants Nationwide
Ranked #245 out of 5,643 Solar Power Plants Nationwide
Ranked #48 out of 238 Georgia Power Plants
Ranked #13 out of 138 Georgia Solar Power Plants
Fuel Types Solar

Map of Butler Solar Project 103

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Butler Solar Project 103.

Create Your Account Today

Monthly Net Generation for Butler Solar Project 103

Butler Solar Project 103 Details

Summary Information
Plant NameButler Solar Project 103 (59896)
Plant Address765 West Fall Line Freeway, Butler, GA 31006
UtilitySouthern Power Co (17650)
Latitude, Longitude32.56194, -84.27583
Generation Dates on FileDec 2016 to Aug 2024
Initial Operation DateDecember 2016
Annual Generation 213.9 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF15-840-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthoritySouthern Company Services, Inc. - Trans (SOCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerGeorgia Power Co (7140) GA
Grid Voltage 230.00 kV
Energy StorageNo

Generator 1 Details Operating December 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity104 MW
Summer Capacity100 MW
Winter Capacity100 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle90
DC Net Capacity141.5 MW
Thin Film CDTEYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Butler Solar Project 103 Plant Owners

Owner NameAddressOwnership
SP Butler Solar, LLC30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#235CA Flats Solar 130, LLCShandon, CA230.4 GWh
#236Dressor Plains Solar, LLCHerrick, IL230.4 GWh
#237Enterprise Solar, LLCNewcastle, UT230.1 GWh
#238Lockhart Solar PV, LLCHinkley, CA219.8 GWh
#239Ivanpah 1Nipton, CA230.3 GWh
#240Wapello Solar LLCWapello, IA219.2 GWh
#241Black Bear Solar 1Montgomery, AL218.6 GWh
#242Albemarle Beach SolarRoper, NC217.5 GWh
#243Copper Mountain Solar 4, LLCBoulder City, NV214.2 GWh
#244Iron Springs Solar, LLCCedar City, UT214.0 GWh
#246Quinto Solar PV ProjectGustine, CA213.5 GWh
#247Escalante Solar II, LLCMilford, UT212.9 GWh
#248Assembly Solar II LLCLennon, MI212.7 GWh
#249Escalante Solar I, LLCMilford, UT212.6 GWh
#250Granite Mountain Solar East, LLCCedar City, UT211.2 GWh
#251Chicot SolarLake Village, AR210.7 GWh
#252Escalante Solar III, LLCMilford, UT209.7 GWh
#253Cutlass Solar 1 LLCRichmond, TX209.1 GWh
#254River Ferry Solar 1West Union, IL208.6 GWh
#255Searcy Solar HybridSearcy, AR208.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Butler Solar Project 103.

Plant NamePlant LocationAnnual GenerationDistance
Bibb JonesMacon, GA2.0 GWh33.7 mi
Butler Solar Farm 20Butler, GA39.5 GWh2.5 mi
Camp Solar PlantWoodbury, GA3.2 GWh31.9 mi
CPV Stagecoach SolarAndersonville, GA71.5 GWh27.9 mi
Edward L. Addison Generating PlantThomaston, GA200.2 GWh24.2 mi
Flint River OperationsOglethorpe, GA448.4 GWh24.5 mi
Fort Valley State University SolarFort Valley, GA20.6 GWh23.2 mi
Freeman AvenueAndersonville, GA2.7 GWh27.3 mi
Harris ShilohShiloh, GA4.3 GWh29.4 mi
Meriwether JacksonMachester, GA5.9 GWh30.6 mi
Muscogee Public WorksColumbus, GA2.9 GWh34.4 mi
Pawpaw Solar PlantButler, GA60.9 GWh1.3 mi
Piedmont Green PowerBarnesville, GA391.0 GWh34.5 mi
SR PerryPerry, GA153.1 GWh32 mi
Talbot County EnergyBox Springs, GA521.8 GWh24.3 mi
TaylorMauk, GA31.7 GWh10 mi
Taylor County SolarButler, GA206.7 GWh1.9 mi
Upson County GA S1 LLCThomaston, GA5.1 GWh25.4 mi
Upson Rocky Creek Solar PlantThomaston, GA1.1 GWh25.1 mi
White Pine Solar, LLCButler, GA188.2 GWh4 mi