Busch Ranch II Wind Farm
TBD, Walsenburg, CO 81089Plant Summary Information
Busch Ranch II Wind Farm is ranked #26 out of 34 wind farms in Colorado in terms of total annual net electricity generation.
Busch Ranch II Wind Farm generated 42.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Busch Ranch II Wind Farm |
---|---|
Utility Name | Black Hills Electric Generation LLC |
Location | Huerfano County, CO |
Initial Operation Date | November 2019 |
Last Update | Aug 2024 |
Annual Generation | 179.7 GWh |
Annual Consumption | 665.8 k MMBtu |
Ranked #2,433 out of 11,835 Power Plants Nationwide | |
Ranked #740 out of 1,343 Wind Power Plants Nationwide | |
Ranked #52 out of 267 Colorado Power Plants | |
Ranked #26 out of 34 Colorado Wind Power Plants | |
Fuel Types | Wind |
Map of Busch Ranch II Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Busch Ranch II Wind Farm.
Monthly Net Generation for Busch Ranch II Wind Farm
Busch Ranch II Wind Farm Details
Summary Information | |
---|---|
Plant Name | Busch Ranch II Wind Farm (62445) |
Plant Address | TBD, Walsenburg, CO 81089 |
Utility | Black Hills Electric Generation LLC (61973) |
Latitude, Longitude | 37.76642, -104.42945 |
Generation Dates on File | Oct 2019 to Aug 2024 |
Initial Operation Date | November 2019 |
Annual Generation | 179.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Black Hills/Colorado Elec.Util (56146) CO |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator WT Details Operating November 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 59.4 MW |
Summer Capacity | 59.4 MW |
Winter Capacity | 59.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 27 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 27 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V120-2.2 |
Design Wind Speed | 17 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 263 |
Busch Ranch II Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#730 | Cohocton Wind Project | Cohocton, NY | 185.4 GWh |
#731 | High Sheldon Wind Farm | Strykersville, NY | 184.0 GWh |
#732 | Pinnacle Wind Force LLC | Keyser, WV | 184.0 GWh |
#733 | Peak View Wind Farm | Walsenburg, CO | 183.4 GWh |
#734 | Beebe 1A | Ithaca, MI | 182.9 GWh |
#735 | Los Vientos Wind 1B | Sebastian, TX | 182.1 GWh |
#736 | Bison I Wind Energy Center | New Salem, ND | 181.7 GWh |
#737 | Majestic II Wind | Panhandle, TX | 180.7 GWh |
#738 | Harvest 2 | Elkton, MI | 180.2 GWh |
#739 | FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh |
#741 | Strauss Wind Farm | Lompoc, CA | 179.6 GWh |
#742 | Green Pastures Wind II | Seymour, TX | 178.7 GWh |
#743 | Arlington Wind Power Project | Arlington, OR | 177.8 GWh |
#744 | Painted Hills Wind Park | Whitewater, CA | 177.6 GWh |
#745 | Cerro Gordo Wind Farm | Union, IA | 176.4 GWh |
#746 | San Juan Mesa Wind Project LLC | Elida, NM | 176.3 GWh |
#747 | Granite Reliable Power | Dummer, NH | 176.0 GWh |
#748 | Wethersfield | Gainsville, NY | 176.0 GWh |
#749 | Woodward Mountain I | Girvin, TX | 175.7 GWh |
#750 | Flat Ridge Wind Energy LLC | Isabel, KS | 175.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Busch Ranch II Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bighorn Solar 1 | Pueblo, CO | 600.1 GWh | 31.8 mi |
Busch Ranch Wind Energy Farm | Walsenburg, CO | 85.2 GWh | 4.2 mi |
CEC Solar #1117, LLC | Pueblo, CO | 7.2 GWh | 36.2 mi |
Comanche (CO) | Pueblo, CO | 5.7 TWh | 31.5 mi |
Comanche Solar | Pueblo, CO | 251.5 GWh | 31.2 mi |
CSU Pueblo | Pueblo, CO | 1.1 GWh | 38.2 mi |
CSWIND America Inc. | Pueblo, CO | 5.9 GWh | 29.7 mi |
Fountain Valley Power Facility | Fountain, CO | 70.3 GWh | 56.4 mi |
Huerfano River Wind | Walsenburg, CO | 12.4 GWh | 22 mi |
James W. Broderick Hydropower Plant | Pueblo, CO | 20.8 GWh | 38.2 mi |
Neptune Energy Center Hybrid | Boone, CO | 707.3 GWh | 39 mi |
NSE Camber BH CSG 2, LLC | Ordway, CO | 3.7 GWh | 48.1 mi |
Peak View Wind Farm | Walsenburg, CO | 183.4 GWh | 5.7 mi |
Pueblo Airport Generating Station | Pueblo, CO | 1.6 TWh | 38.7 mi |
San Isabel Solar, LLC | Trinidad, CO | 75.4 GWh | 35.4 mi |
Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 475.5 GWh | 29 mi |
Thunder Wolf Energy Center Hybrid | Avondale, CO | 567.6 GWh | 29.3 mi |
Trinidad (CO) | Trinidad, CO | 26.0 MWh | 40.7 mi |
USS Giveback Solar LLC (CSG) | Pueblo, CO | 60.0 MWh | 27.8 mi |
Vestas Towers America, Inc. | Pueblo, CO | 2.4 GWh | 29.9 mi |