Burlington Solar 1
85 Prospect Street, Burlington, CT 6013Plant Summary Information
Burlington Solar 1 is ranked #23 out of 59 solar farms in Connecticut in terms of total annual net electricity generation.
Burlington Solar 1 generated 876.4 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Burlington Solar 1 |
---|---|
Utility Name | DG Connecticut III, LLC |
Location | Northwest Hills Planning Region, CT |
Initial Operation Date | February 2022 |
Last Update | Dec 2022 |
Annual Generation | 3.2 GWh |
Annual Consumption | 11.0 k MMBtu |
Ranked #8,615 out of 11,249 Power Plants Nationwide | |
Ranked #3,563 out of 5,158 Solar Power Plants Nationwide | |
Ranked #92 out of 147 Connecticut Power Plants | |
Ranked #23 out of 59 Connecticut Solar Power Plants | |
Fuel Types | Solar |
Map of Burlington Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Burlington Solar 1.
Monthly Net Generation for Burlington Solar 1
Burlington Solar 1 Details
Summary Information | |
---|---|
Plant Name | Burlington Solar 1 (65784) |
Plant Address | 85 Prospect Street Burlington, CT 6013 |
Utility | DG Connecticut III, LLC (64426) |
Latitude, Longitude | 41.72795, -72.93262 |
Generation Dates on File | Feb 2022 to Dec 2022 |
Initial Operation Date | February 2022 |
Annual Generation | 3.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-113-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator BS1 Details Operating February 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Summer Capacity | 3.5 MW |
Winter Capacity | 3.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 4.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Burlington Solar 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3553 | Boas Rd #4 Community Solar Farm | Mooers, NY | 3.2 GWh |
#3554 | Rappahannock Solar, LLC | White Stone, VA | 3.2 GWh |
#3555 | TIA Solar | Tampa, FL | 3.2 GWh |
#3556 | Reisender Solar | Ellenville, NY | 3.2 GWh |
#3557 | Coyote Ridge Community Solar | Fort Collins, CO | 3.2 GWh |
#3558 | Penny Hill Solar | Greenville, NC | 3.2 GWh |
#3559 | Pima Community College NW | Tucson, AZ | 3.2 GWh |
#3560 | Weston Landfill Solar | Weston, MA | 3.2 GWh |
#3561 | Silvi Gibraltar Rock | Belle Mead, NJ | 3.2 GWh |
#3562 | East Chicago | East Chicago, IN | 3.2 GWh |
#3564 | Palmer Solar LLC | Palmer, MA | 3.2 GWh |
#3565 | Enerparc CA1 LLC | Hollister, CA | 3.2 GWh |
#3566 | Los Angeles Harbor College | Wilmington, CA | 3.2 GWh |
#3567 | Pierce College | Wilmington, CA | 3.2 GWh |
#3568 | EMWD - San Jacinto RWRF NEM | San Jacinto, CA | 3.2 GWh |
#3569 | Cornell Geneva Solar Farm | Seneca, NY | 3.2 GWh |
#3570 | Big Tree Community Solar Farm | Wales, NY | 3.2 GWh |
#3571 | Salt Point Solar (Hybrid) | Poughkeepsie, NY | 3.2 GWh |
#3572 | Cycz Solar Project CSG Hybrid | Spencer, MA | 3.2 GWh |
#3573 | Dubois Solar (Hybrid) | Pine Bush, NY | 3.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Burlington Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bristol Solar One, LLC | Bristol, CT | 5.7 GWh | 3.5 mi |
Canis Minor Solar Farm | Barkhamsted, CT | 1.9 GWh | 11.7 mi |
CCSU Co-Gen-STBY Gen | New Britain, CT | 131.4 MWh | 8.8 mi |
CCSU Fuel Cell Project | New Britain, CT | 9.4 GWh | 9.2 mi |
Corbin Russwin Phase 3 Berlin | Berlin, CT | 1.9 GWh | 11.5 mi |
Covanta Bristol Energy | Bristol, CT | 113.4 GWh | 5.5 mi |
FDX010.0 FedEx Fuel Cell | Middletown, CT | 7.4 GWh | 14.6 mi |
Franklin Drive | Torrington, CT | 331.4 MWh | 10.7 mi |
Hartford Hospital Cogeneration | Hartford, CT | 53.0 GWh | 13.6 mi |
Hartford Landfill Solar EGF | Hartford, CT | 1.6 GWh | 15.2 mi |
HSCo CHP | Hartford, CT | 28.8 GWh | 13.8 mi |
Niagara Bottling - Bloomfield | Bloomfield, CT | 50.0 MWh | 14.2 mi |
Pepperidge Farm Bloomfield | Bloomfield, CT | 14.4 GWh | 14.7 mi |
Pratt & Whitney | East Hartford, CT | 139.5 GWh | 15.3 mi |
South Meadow | Hartford, CT | 1.5 GWh | 14.5 mi |
Torrington Solar One, LLC | Torrington, CT | 3.8 GWh | 10.3 mi |
Torrington Terminal | Torrington, CT | 191.2 MWh | 10.3 mi |
Trinity College Fuel Cell | Hartford, CT | 10.1 GWh | 12.6 mi |
Waterbury Generation | Waterbury, CT | 43.7 GWh | 13.9 mi |
Watertown Solar One, LLC | Watertown, CT | 3.5 GWh | 13.4 mi |