Bull Creek Wind
1016d County Road, O'Donnell, TX 79351Plant Summary Information
Bull Creek Wind is ranked #167 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Bull Creek Wind generated 61.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Bull Creek Wind |
---|---|
Utility Name | Bull Creek Wind LLC |
Location | Borden County, TX |
Initial Operation Date | December 2008 |
Last Update | Dec 2023 |
Annual Generation | 269.0 GWh |
Annual Consumption | 988.0 k MMBtu |
Ranked #1,954 out of 11,835 Power Plants Nationwide | |
Ranked #588 out of 1,343 Wind Power Plants Nationwide | |
Ranked #358 out of 749 Texas Power Plants | |
Ranked #167 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Bull Creek Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bull Creek Wind.
Monthly Net Generation for Bull Creek Wind
Bull Creek Wind Details
Summary Information | |
---|---|
Plant Name | Bull Creek Wind (56956) |
Plant Address | 1016d County Road, O'Donnell, TX 79351 |
Utility | Bull Creek Wind LLC (56222) |
Latitude, Longitude | 32.92901, -101.57862 |
Generation Dates on File | Jan 2009 to Dec 2023 |
Initial Operation Date | December 2008 |
Annual Generation | 269.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 09-14-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 001 Details Operating December 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 180 MW |
Summer Capacity | 180 MW |
Winter Capacity | 180 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
---|---|
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 180 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned New Nameplate Capacity | 179 MW |
Planned Repower | July 2025 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 180 |
---|---|
Predominant Turbine Manufacturer | Mitsubishi |
Predominant Turbine Model Number | MWT-62/1.0 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 226 |
Bull Creek Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#578 | Saratoga Wind Farm | Lime Springs, IA | 275.0 GWh |
#579 | Beethoven Wind | Tripp, SD | 274.5 GWh |
#580 | Clearwater Wind II | Miles City, MT | 274.4 GWh |
#581 | Top of the World Windpower Project | Glenrock, WY | 272.5 GWh |
#582 | Sendero | Hebbronville, TX | 272.5 GWh |
#583 | Smoky Hills Wind Project Phase I | Lincoln, KS | 272.0 GWh |
#584 | Blue Canyon Windpower V LLC | Carnegie, OK | 272.0 GWh |
#585 | Prairie Breeze II | Elgin, NE | 270.4 GWh |
#586 | Broken Bow Wind II, LLC | Broken Bow, NE | 270.1 GWh |
#587 | Eight Point Wind | Rexville, NY | 269.9 GWh |
#589 | Stillwater Wind, LLC | Reed Point, MT | 268.8 GWh |
#590 | Sunray Wind I | Sunray, TX | 268.2 GWh |
#591 | New Harvest Wind Project LLC | Schleswig, IA | 268.1 GWh |
#592 | Meadow Creek Project Company | Idaho Falls, ID | 266.2 GWh |
#593 | South Trent Wind Farm | Sweetwater, TX | 264.8 GWh |
#594 | TransAlta Wyoming Wind | Evanston, WY | 264.6 GWh |
#595 | Pacific Wind LLC | Rosamond, CA | 264.0 GWh |
#596 | Stanton Wind Energy LLC | Lenorah, TX | 263.7 GWh |
#597 | Juniper Canyon I Wind Project | Bickleton, WA | 263.0 GWh |
#598 | White Rock West Wind Project | Anadarko, OK | 262.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bull Creek Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brazos Wind Farm | Fluvanna, TX | 82.9 GWh | 25 mi |
Canyon Wind Project, LLC | Scurry, TX | 695.6 GWh | 39 mi |
Coyote Wind LLC | Snyder, TX | 625.5 GWh | 41.7 mi |
Dermott Wind | Snyder, TX | 904.5 GWh | 35.3 mi |
EG178 Facility | Snyder, TX | 686.9 GWh | 38.3 mi |
ENGIE Long Draw Solar LLC | Gail, TX | 526.1 GWh | 13.2 mi |
Fluvanna | Fluvanna, TX | 528.5 GWh | 25.2 mi |
Gopher Creek Wind Farm | Fluvanna, TX | 618.0 GWh | 21.8 mi |
Jones | Lubbock, TX | 2.1 TWh | 42.1 mi |
Juno Solar Project | Lamesa, TX | 795.1 GWh | 15.3 mi |
Lamesa II | Lamesa, TX | 121.7 GWh | 23.2 mi |
Lamesa Solar | Lamesa, TX | 192.0 GWh | 25 mi |
Lumina Solar Project | Snyder, TX | 510.3 GWh | 34.6 mi |
Mesquite Creek Wind | Lamesa, TX | 361.1 GWh | 18.4 mi |
Post Wind Farm LP | Fluvanna, TX | 311.7 GWh | 20.8 mi |
Sage Draw Wind | Wilson, TX | 1.1 TWh | 26.3 mi |
Scurry County Wind LP | Snyder, TX | 233.6 GWh | 36.8 mi |
Stephens Ranch Wind Energy LLC | O'Donnell, TX | 1.1 TWh | 4 mi |
Tahoka Wind | Tahoka, TX | 1.1 TWh | 16.4 mi |
WAL1272 | Snyder, TX | 287.0 MWh | 41.7 mi |