Buffalo Gap 2 Wind Farm
10718 FM 89, Merkel, TX 79536Plant Summary Information
Buffalo Gap 2 Wind Farm is ranked #138 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Buffalo Gap 2 Wind Farm generated 98.5 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Buffalo Gap 2 Wind Farm |
---|---|
Utility Name | AES Distributed Energy |
Location | Nolan County, TX |
Initial Operation Date | July 2007 |
Last Update | Jan 2025 |
Annual Generation | 393.2 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,560 out of 11,979 Power Plants Nationwide | |
Ranked #452 out of 1,359 Wind Power Plants Nationwide | |
Ranked #299 out of 774 Texas Power Plants | |
Ranked #138 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
AES Wind Generation Inc (2013 to 2021) AES Distributed Energy (2022 to 2023) |
Map of Buffalo Gap 2 Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Buffalo Gap 2 Wind Farm.
Monthly Net Generation for Buffalo Gap 2 Wind Farm
Buffalo Gap 2 Wind Farm Details
Summary Information | |
---|---|
Plant Name | Buffalo Gap 2 Wind Farm (56484) |
Plant Address | 10718 FM 89, Merkel, TX 79536 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 32.31822, -100.17699 |
Generation Dates on File | Jul 2007 to Jan 2025 |
Initial Operation Date | July 2007 |
Annual Generation | 393.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 34.00 kV |
Energy Storage | No |
Generator 1 Details Operating July 2007
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 232.5 MW |
Summer Capacity | 232.5 MW |
Winter Capacity | 232.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 155 |
Turbine Details | |
Number Of Turbines | 155 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 S |
Design Wind Speed | 17 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 201 |
Buffalo Gap 2 Wind Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#442 | Hopkins Ridge Wind | Dayton, WA | 398.1 GWh |
#443 | Willow Creek Wind Power LLC | Newell, SD | 397.0 GWh |
#444 | Midway Wind, LLC | Taft, TX | 395.9 GWh |
#445 | Delta Wind Farm (MS) | Dundee, MS | 395.8 GWh |
#446 | McAdoo Wind Energy LLC | McAdoo, TX | 395.1 GWh |
#447 | Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh |
#448 | White Oak Energy LLC | Carlock, IL | 394.3 GWh |
#449 | Clearwater Wind II | Miles City, MT | 394.3 GWh |
#450 | Drift Sand Wind Project LLC | Rush Springs, OK | 394.2 GWh |
#451 | Prairie Rose Wind Farm | Hardwick, MN | 394.1 GWh |
#453 | Peyton Creek Wind Farm LLC | Bay City, TX | 391.4 GWh |
#454 | Panther Creek Wind Farm II | Big Spring, TX | 391.1 GWh |
#455 | Elbow Creek Wind Project LLC | Forsan, TX | 390.7 GWh |
#456 | Post Rock Wind Power Project, LLC | Ellsworth, KS | 390.7 GWh |
#457 | Northern Wind | Lake Wilson, MN | 387.9 GWh |
#458 | Glacier Hills | Cambria, WI | 387.5 GWh |
#459 | North Sky River Energy LLC | Weldon, CA | 386.6 GWh |
#460 | Voyager Wind I | Mojave, CA | 383.2 GWh |
#461 | Magic Valley Wind Farm I LLC | San Perlita, TX | 383.2 GWh |
#462 | Cedar Creek Wind, LLC | Shelley, ID | 383.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Buffalo Gap 2 Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh | 5 mi |
Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh | 6.8 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh | 9.1 mi |
Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh | 28 mi |
HEB00070 | Abilene, TX | 385.0 MWh | 25.7 mi |
Holstein 1 Solar Farm | Wingate, TX | 381.4 GWh | 14.8 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 10 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 427.2 GWh | 26.5 mi |
Maryneal Windpower | Maryneal, TX | 568.0 GWh | 20.1 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 9.4 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 362.3 GWh | 30.4 mi |
South Trent Wind Farm | Sweetwater, TX | 264.8 GWh | 6.8 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 137.6 GWh | 9.9 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 429.5 GWh | 11.5 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 14.4 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 627.6 GWh | 20.6 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 18.8 mi |
Trent Wind Farm | Trent, TX | 535.5 GWh | 8.5 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh | 9.9 mi |
WAL536 | Abilene, TX | 362.0 MWh | 30.1 mi |