Brown County LFGTE Power Station
9427 Beyers Road, Georgetown, OH 45121Plant Summary Information
Brown County LFGTE Power Station is ranked #4 out of 7 landfill gas power plants in Ohio in terms of total annual net electricity generation.
Brown County LFGTE Power Station is comprised of 3 generators and generated 6.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Brown County LFGTE Power Station |
---|---|
Utility Name | EDL Inc |
Location | Brown County, OH |
Initial Operation Date | June 2017 |
Last Update | Dec 2023 |
Annual Generation | 27.0 GWh |
Annual Consumption | 307.9 k MMBtu |
Ranked #4,681 out of 11,852 Power Plants Nationwide | |
Ranked #105 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #68 out of 183 Ohio Power Plants | |
Ranked #4 out of 7 Ohio Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operator |
Energy Developments Inc (2016 to 2017) EDL Inc (2018 to 2023) |
Map of Brown County LFGTE Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brown County LFGTE Power Station.
Monthly Net Generation for Brown County LFGTE Power Station
Brown County LFGTE Power Station Details
Summary Information | |
---|---|
Plant Name | Brown County LFGTE Power Station (61145) |
Plant Address | 9427 Beyers Road, Georgetown, OH 45121 |
Utility | EDL Inc (55858) |
Latitude, Longitude | 38.895, -83.903 |
Generation Dates on File | Jun 2017 to Dec 2023 |
Initial Operation Date | June 2017 |
Annual Generation | 27.0 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 16-1285-000 |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 16-1285-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Ohio Inc (3542) OH |
Grid Voltage | 35.00 kV |
Energy Storage | No |
Generator GM01 Details Operating June 2017
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator GM02 Details Operating June 2017
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator GM03 Details Operating June 2017
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Brown County LFGTE Power Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#95 | Lincoln Landfill | Lincoln, CA | 28.8 GWh |
#96 | Ameresco Keller Canyon | Bay Point, CA | 28.7 GWh |
#97 | Model City Energy Facility | Youngstown, NY | 28.6 GWh |
#98 | Riverview Energy Systems | Riverview, MI | 28.3 GWh |
#99 | Bavarian LFGTE | Walton, KY | 27.9 GWh |
#100 | Sarasota County LFGTE Facility | Nokomis, FL | 27.8 GWh |
#101 | Ameresco Dallas LLC | Dallas, TX | 27.8 GWh |
#102 | Riverbend Landfill | McMinnville, OR | 27.7 GWh |
#103 | Richmond Energy | Henrico, VA | 27.3 GWh |
#104 | Lennon Generating | Lennon, MI | 27.3 GWh |
#106 | Liberty I & II LFGTE | Monticello, IN | 26.7 GWh |
#107 | Two Pine Landfill Gas Recovery | North Little Rock, AR | 26.5 GWh |
#108 | MM Lopez Energy | Lake View Terrace, CA | 26.4 GWh |
#109 | New Bern | New Bern, NC | 28.1 GWh |
#110 | Oneida Herkimer | Boonville, NY | 26.3 GWh |
#111 | Nanticoke LFG | Binghamton, NY | 26.1 GWh |
#112 | Greene Valley Gas Recovery | Naperville, IL | 26.1 GWh |
#113 | Apple Campus 2 Fuel Cell | Cupertino, CA | 25.9 GWh |
#114 | Salem Energy Systems LLC | Winston-Salem, NC | 25.9 GWh |
#115 | Mountain View | Greencastle, PA | 27.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brown County LFGTE Power Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aero Solar Facility | Burlington, KY | 2.6 GWh | 41.7 mi |
Bavarian LFGTE | Walton, KY | 27.9 GWh | 40.5 mi |
Central Utility Plant Cincinnati | Cincinnati, OH | 238.9 GWh | 36.5 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 39.5 mi |
East Campus Utility Plant | Cincinnati, OH | 212.7 MWh | 36.4 mi |
H L Spurlock | Maysville, KY | 7.8 TWh | 14.2 mi |
Hamilton Peaking | Hamilton, OH | 1.5 GWh | 45.7 mi |
Hecate Energy Highland LLC | Buford, OH | 260.6 GWh | 14 mi |
Hillcrest Solar | Mt. Orab, OH | 377.4 GWh | 12.6 mi |
L'Oreal Solar - Florence | Florence, KY | 1.4 GWh | 38.4 mi |
Meldahl Hydroelectric Project | Foster, KY | 539.3 GWh | 16.2 mi |
Middletown Energy Center | Middletown, OH | 3.5 TWh | 46 mi |
Nestlewood Solar | Hamersville, OH | 116.0 GWh | 6.5 mi |
New Market Solar | Sardinia, OH | 66.3 GWh | 13.5 mi |
Parking Lot Array | Cincinnati, OH | 1.4 GWh | 36.8 mi |
Pendleton County LFGTE | Butler, KY | 23.1 GWh | 29.3 mi |
Procter & Gamble Cincinnati Plant | Cincinnati, OH | 9.4 GWh | 37.6 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 37.2 mi |
Walton 2 Solar Facility | Walton, KY | 3.1 GWh | 37.2 mi |
Willowbrook Solar I, LLC | Morystown, OH | 28.8 GWh | 13.8 mi |