Broshco Fabricated Products is ranked #38 out of 54 natural gas power plants in Ohio in terms of total annual net electricity generation.
Broshco Fabricated Products is comprised of 4 generators and generated 2.0 MWh during the 3-month period between October 2024 to January 2025.
Plant Name | Broshco Fabricated Products |
---|---|
Utility Name | Broshco Fabricated Products |
Location | Richland County, OH |
Initial Operation Date | September 2001 |
Last Update | Jan 2025 |
Annual Generation | 2.2 GWh |
Annual Consumption | 24.2 k MMBtu |
Ranked #9,780 out of 11,979 Power Plants Nationwide | |
Ranked #1,822 out of 2,255 Natural Gas Power Plants Nationwide | |
Ranked #125 out of 189 Ohio Power Plants | |
Ranked #38 out of 54 Ohio Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Broshco Fabricated Products
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Broshco Fabricated Products.
Monthly Net Generation for Broshco Fabricated Products
Broshco Fabricated Products Details
Summary Information | |
---|---|
Plant Name | Broshco Fabricated Products (59373) |
Plant Address | 1595 W. Longview Ave., Mansfield, OH 44906 |
Utility | Broshco Fabricated Products (59147) |
Latitude, Longitude | 40.77611, -82.56861 |
Generation Dates on File | Jan 2013 to Jan 2025 |
Initial Operation Date | September 2001 |
Annual Generation | 2.2 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Fabricated Metal Product Manufacturing (332) |
Sector | Industrial CHP (7) |
Water Source | Mansfield City |
Ash Impoundment | No |
Transmission / Distribution Owner | Ohio Edison Co (13998) OH |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | COLUMBIA GAS DIST CO |
Natural Gas Storage | No |
Generator 1 Details Operating September 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating September 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating September 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2001 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating July 2005
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2005 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Broshco Fabricated Products Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1812 | Higginsville | Higginsville, MO | 2.7 GWh |
#1813 | Jefferson Torresdale Hospital | Philadelphia, PA | 2.5 GWh |
#1814 | Kennett | Kennett, MO | 2.5 GWh |
#1815 | Mosinee Mill | Mosinee, WI | 122.9 GWh |
#1816 | Russell Energy Center | Russell, KS | 2.4 GWh |
#1817 | Custer Energy Center | Manitowoc, WI | 2.4 GWh |
#1818 | Tulare BioMAT Fuel Cell | Tulare, CA | 12.5 GWh |
#1819 | Western Sugar Coop- Ft Morgan | Fort Morgan, CO | 2.3 GWh |
#1820 | Carthage Energy LLC | Carthage, NY | 2.3 GWh |
#1821 | Eastern Correctional Institute | Westover, MD | 2.2 GWh |
#1823 | AltaGas Ripon Energy Inc. | Ripon, CA | 2.2 GWh |
#1824 | Lewis & Clark | Richland, MT | 2.2 GWh |
#1825 | Sterling Power Plant | Sherrill, NY | 2.1 GWh |
#1826 | OTHERTexasA&M | Bryan, TX | 2.1 GWh |
#1827 | Beluga | Beluga, AK | 2.1 GWh |
#1828 | Mickleton Station | Mickleton, NJ | 2.1 GWh |
#1829 | Forked River | Forked River, NJ | 2.1 GWh |
#1830 | Sidney MT Plant | Sidney, MT | 4.4 GWh |
#1831 | Bowling Green Generating Station | Bowling Green, OH | 2.1 GWh |
#1832 | Laguna Water Reclamation Facility | Santa Rosa, CA | 14.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Broshco Fabricated Products.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Clyde Peaking Engine | Clyde, OH | 540.0 MWh | 41.3 mi |
Galion | Galion, OH | 167.0 MWh | 12.2 mi |
Galion Generating Station | Galion, OH | 2.0 GWh | 12.2 mi |
Harpster Wind | Harpster, OH | 2.1 GWh | 34.8 mi |
Loraine County Project | Oberlin, OH | 101.3 GWh | 41.5 mi |
Monroeville RTO BTM | Monroeville, OH | 83.0 MWh | 33.2 mi |
Monroeville Solar | Monroeville, OH | 4.0 GWh | 32.2 mi |
Oberlin (OH) | Oberlin, OH | 292.0 MWh | 39.5 mi |
Oberlin Spear Point Solar One | Oberlin, OH | 2.1 GWh | 40.5 mi |
POET Biorefining - Marion, LLC | Marion, OH | 29.7 GWh | 32.6 mi |
Progress Drive Generation Station | Shelby, OH | 38.0 MWh | 19.2 mi |
Prospect Municipal | Prospect, OH | 100.0 MWh | 39.9 mi |
Renewable Energy Services of Ohio | Milan, OH | 11.1 GWh | 38.7 mi |
Seville | Seville, OH | 153.0 MWh | 40.5 mi |
Shelby North | Shelby, OH | 23.0 MWh | 9.7 mi |
Shelby Solar Array | Shelby, OH | 1.9 GWh | 9.9 mi |
Shelby South | Shelby, OH | 37.0 MWh | 10.2 mi |
Wellington | Wellington, OH | 32.0 MWh | 32.1 mi |
Whirlpool Corporation - Marion Wind Farm | Marion, OH | 8.9 GWh | 34.4 mi |
Wyandot Solar Farm | Upper Sandusky, OH | 12.0 GWh | 39.8 mi |