Brookville Smart Bus Depot Microgrid
8710 Brookville Rd, Silver Spring, MD 20910Plant Summary Information
Brookville Smart Bus Depot Microgrid is ranked #100 out of 140 solar farms in Maryland in terms of total annual net electricity generation.
Brookville Smart Bus Depot Microgrid generated 375.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Brookville Smart Bus Depot Microgrid |
---|---|
Utility Name | AlphaStruxure Service Co LP |
Location | Montgomery County, MD |
Initial Operation Date | October 2022 |
Last Update | Dec 2023 |
Annual Generation | 2.2 GWh |
Annual Consumption | 9.4 k MMBtu |
Ranked #9,693 out of 11,852 Power Plants Nationwide | |
Ranked #4,515 out of 5,655 Solar Power Plants Nationwide | |
Ranked #133 out of 179 Maryland Power Plants | |
Ranked #100 out of 140 Maryland Solar Power Plants | |
Fuel Types | Solar : 95.1% Natural Gas : 4.9% |
Map of Brookville Smart Bus Depot Microgrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brookville Smart Bus Depot Microgrid.
Monthly Net Generation for Brookville Smart Bus Depot Microgrid
Brookville Smart Bus Depot Microgrid Details
Summary Information | |
---|---|
Plant Name | Brookville Smart Bus Depot Microgrid (65945) |
Plant Address | 8710 Brookville Rd, Silver Spring, MD 20910 |
Utility | AlphaStruxure Service Co LP (65118) |
Latitude, Longitude | 38.99903, -77.058 |
Generation Dates on File | Oct 2022 to Dec 2023 |
Initial Operation Date | October 2022 |
Annual Generation | 2.2 GWh |
Fuel Types | Solar : 95.1% Natural Gas : 4.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Transit and Ground Passenger Transportation (485) |
Sector | Commercial Non-CHP (4) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Potomac Electric Power Co (15270) MD |
Grid Voltage | 13.80 kV |
Energy Storage | Yes |
Natural Gas Information | |
Local Distribution Company (LDC) | WASHINGTON GAS LIGHT COMPANY |
Natural Gas Storage | No |
Generator PV Details Operating October 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.7 MW |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2022 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 303 |
Tilt Angle | 3 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2 MW |
Virtual Net Metering Agreement | No |
Generator BESS Details Operating November 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2022 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 4.3 |
---|---|
Maximum Charge Rate | 1.5 MW |
Maximum Discharge Rate | 1.5 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1.5 |
Storage Enclosure Type | CS |
Load Following | P |
System Peak Shaving | Yes |
Load Management | Yes |
Backup Power | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 65945 |
Direct Support Gen Id | PV |
Support T D Asset | Yes |
Generator GENS Details Operating March 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2023 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN2 Details Standby September 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN3 Details Standby September 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Brookville Smart Bus Depot Microgrid Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
AlphaStruxure Montgomery County LLC | 201 Washington St, Floor 27, Boston, MA 2111 | Generator BESS | 100.00% |
AlphaStruxure Montgomery County LLC | 201 Washington St, Floor 27, Boston, MA 2111 | Generator GEN2 | 100.00% |
AlphaStruxure Montgomery County LLC | 201 Washington St, Floor 27, Boston, MA 2111 | Generator GEN3 | 100.00% |
AlphaStruxure Montgomery County LLC | 201 Washington St, Floor 27, Boston, MA 2111 | Generator GENS | 100.00% |
AlphaStruxure Montgomery County LLC | 201 Washington St, Floor 27, Boston, MA 2111 | Generator PV | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4505 | 435A Bergen Avenue | Kearney, NJ | 2.1 GWh |
#4506 | Oberlin Spear Point Solar One | Oberlin, OH | 2.1 GWh |
#4507 | Primrose Solar, LLC | Mankato, MN | 2.1 GWh |
#4508 | Holtsville Solar Project | Holtsville, NY | 2.1 GWh |
#4509 | COU Solar I, LLC | Lisbon, NY | 2.1 GWh |
#4510 | USS Big Lake 1 Solar CSG | Big Lake, MN | 2.1 GWh |
#4511 | Solar Star Palo Alto I, LLC | Palo Alto, CA | 2.1 GWh |
#4512 | WHA Southbridge Solar Park CSG | Wilmington, DE | 2.1 GWh |
#4513 | Nunn | Apple Valley, CA | 2.1 GWh |
#4514 | Victor Mesa Linda B2 | Victorville, CA | 2.1 GWh |
#4516 | ELP - Kipp | Hudson, NY | 2.1 GWh |
#4517 | USS Buckaroo Solar LLC CSG | Glydon, MN | 2.1 GWh |
#4518 | USS Verbena Solar LLC | Stewart, MN | 2.1 GWh |
#4519 | Novel Winegar Partnership Solar CSG | Waseca, MN | 2.1 GWh |
#4520 | Mt. Hope DPC Solar | Mt. Hope, WI | 2.1 GWh |
#4521 | Forrest City- Eldridge Road | Forrest City, AR | 2.1 GWh |
#4522 | IGS CC, LLC | Washington, DC | 2.1 GWh |
#4523 | Emerald Marshfields, LLC | Marshfield, MA | 2.1 GWh |
#4524 | Salt Point Solar (Hybrid) | Poughkeepsie, NY | 2.1 GWh |
#4525 | 12 Applegate Solar LLC | Robbinsville, NJ | 2.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brookville Smart Bus Depot Microgrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AOC, Capitol Power Plant | Washington, DC | 49.4 GWh | 8.5 mi |
Central Utility Plant at White Oak | Silver Spring, MD | 83.0 GWh | 4.9 mi |
FedEx Field Solar Facility | Landover, MD | 3.5 GWh | 12.2 mi |
GWCC PV Solar Farm | Beltsville, MD | 2.4 GWh | 8.1 mi |
IGS CC, LLC | Washington, DC | 2.1 GWh | 6.5 mi |
IKEA College Park 411 | College Park, MD | 2.3 GWh | 7.2 mi |
JBAB - Washington DC | Washington, DC | 8.5 GWh | 10.4 mi |
MO32 (CSG) | Spencerville, MD | 3.7 GWh | 9.8 mi |
Nationals | Washington, DC | 1.7 GWh | 9.1 mi |
NIH Cogeneration Facility | Bethesda, MD | 164.0 GWh | 1.9 mi |
NIST Solar | Gaithersburg, MD | 6.8 GWh | 12.2 mi |
Ridgecrest | Washington, DC | 2.2 GWh | 11.4 mi |
Ross Hall Central Utility Plant | Washington, DC | 9.0 GWh | 6.8 mi |
Sheriff Road | Hyattsville, MD | 1.9 GWh | 10.7 mi |
Sol Phoenix | Capitol Heights, MD | 4.0 GWh | 11.8 mi |
UMCP CHP Plant | College Park, MD | 75.5 GWh | 6.6 mi |
US GSA Heating and Transmission | Washington, DC | 34.2 GWh | 8 mi |
WMATA - Anacostia CSG | Washington, DC | 242.0 MWh | 9.9 mi |
WMATA - Naylor Rd. Metro | Temple Hills, MD | 29.0 MWh | 11.6 mi |
WMATA - S. Ave. Carport (East) (CSG) | Hillcrest Heights, MD | 956.0 MWh | 11.8 mi |