Bronco Plains Wind, LLC
4902 County Road 6, Flagler, CO 80815Plant Summary Information
Bronco Plains Wind, LLC is ranked #13 out of 267 power plants in Colorado in terms of total annual net electricity generation.
Bronco Plains Wind, LLC generated 246.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Bronco Plains Wind, LLC |
---|---|
Utility Name | Bronco Plains Wind, LLC |
Location | Kit Carson County, CO |
Initial Operation Date | September 2020 |
Last Update | Sep 2024 |
Annual Generation | 1.0 TWh |
Annual Consumption | 3.8 M MMBtu |
Ranked #721 out of 11,852 Power Plants Nationwide | |
Ranked #57 out of 1,345 Wind Power Plants Nationwide | |
Ranked #13 out of 267 Colorado Power Plants | |
Ranked #3 out of 34 Colorado Wind Power Plants | |
Fuel Types | Wind |
Map of Bronco Plains Wind, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bronco Plains Wind, LLC.
Monthly Net Generation for Bronco Plains Wind, LLC
Bronco Plains Wind, LLC Details
Summary Information | |
---|---|
Plant Name | Bronco Plains Wind, LLC (63803) |
Plant Address | 4902 County Road 6, Flagler, CO 80815 |
Utility | Bronco Plains Wind, LLC (63487) |
Latitude, Longitude | 39.08885, -103.02507 |
Generation Dates on File | Apr 2020 to Sep 2024 |
Initial Operation Date | September 2020 |
Annual Generation | 1.0 TWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator WBOPL Details Operating September 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 300 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 299 MW |
Winter Capacity | 299 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 108 |
Turbine Details | |
Number Of Turbines | 108 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.85-100 |
Design Wind Speed | 19.5 MPH |
Wind Quality Class | 4 - Very Low Wind |
Turbine Hub Height Feet | 292 |
Bronco Plains Wind, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#47 | Upland Prairie | Spencer, IA | 1.1 TWh |
#48 | TG East | Truscott, TX | 1.1 TWh |
#49 | Solomon Forks Wind Project, LLC | Colby, KS | 1.1 TWh |
#50 | Rock Creek Wind Project | Tarkio, MO | 1.1 TWh |
#51 | Radfords Run Wind Farm | Maroa, IL | 1.1 TWh |
#52 | Milligan 1 Wind Farm | Western, NE | 1.1 TWh |
#53 | Palo Duro Wind | Perryton, TX | 1.1 TWh |
#54 | El Cabo Wind | Encino, NM | 1.0 TWh |
#55 | Roosevelt County | Portales, NM | 1.0 TWh |
#56 | Deuel Harvest Wind Energy LLC | Clear Lake, SD | 1.0 TWh |
#58 | South Plains II | Lockney, TX | 1.0 TWh |
#59 | Lincoln Land Wind | TBD, IL | 1.0 TWh |
#60 | Aurora Wind Project | Tioga, ND | 1.0 TWh |
#61 | Clines Corners Wind Farm LLC | Encino, NM | 1.0 TWh |
#62 | Thunder Ranch Wind Project | Marland, OK | 995.5 GWh |
#63 | Triple H Wind Project | Highmore, SD | 988.3 GWh |
#64 | Hubbard Wind | Mt Calm, TX | 983.2 GWh |
#65 | Diamond Vista Wind Project, LLC | Tampa, KS | 982.0 GWh |
#66 | Nobles 2 Wind Project | Wilmont, MN | 980.2 GWh |
#67 | Mohave County Wind Farm | Willow Beach, AZ | 978.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bronco Plains Wind, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bronco Plains Wind II, LLC | Kit Carson, CO | 572.6 GWh | 7.2 mi |
Burlington (CO) | Burlington, CO | 9.7 GWh | 45.7 mi |
Carousel Wind Farm LLC | Burlington, CO | 583.9 GWh | 48.7 mi |
Cedar Point Wind | Limon, CO | 663.8 GWh | 41.8 mi |
Cheyenne Ridge Wind Farm | Cheyenne Wells, CO | 1.9 TWh | 43.9 mi |
Crossing Trails Wind Power Project LLC. | Seibert, CO | 416.3 GWh | 11.3 mi |
Golden West Power Partners LLC | Calhan, CO | 810.9 GWh | 64.6 mi |
Grazing Yak Solar | Calhan, CO | 85.6 GWh | 66.3 mi |
Hunter Solar, LLC (CO) | Bennett, CO | 178.8 GWh | 85.4 mi |
Kit Carson Windpower | Burlington, CO | 156.9 GWh | 39.9 mi |
Lamar Plant | Lamar, CO | 11.6 GWh | 77.5 mi |
Limon Generating Station | Limon, CO | 153.7 GWh | 37.1 mi |
Limon III Wind LLC | Limon, CO | 788.5 GWh | 30.2 mi |
Limon Wind I | Limon, CO | 582.1 GWh | 35.6 mi |
Limon Wind II | Limon, CO | 508.5 GWh | 34.5 mi |
Manchief Electric Generating Station | Brush, CO | 221.9 GWh | 85.5 mi |
NSE Camber BH CSG 2, LLC | Ordway, CO | 3.7 GWh | 72.2 mi |
Rush Creek Wind | Matheson, CO | 2.2 TWh | 44.3 mi |
Sharon Spring | Sharon Springs, KS | 19.6 MWh | 69.8 mi |
Titan Solar | Deer Trail, CO | 100.2 GWh | 67 mi |