Broadway 2 - UC Riverside
4015 Canyon Crest Dr., Riverside, CA 92507Plant Summary Information
Broadway 2 - UC Riverside is ranked #658 out of 849 solar farms in California in terms of total annual net electricity generation.
Broadway 2 - UC Riverside generated 246.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Broadway 2 - UC Riverside |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Riverside County, CA |
| Initial Operation Date | September 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 2.3 GWh |
| Annual Consumption | 8.5 k MMBtu |
| Ranked #10,137 out of 12,529 Power Plants Nationwide | |
| Ranked #4,951 out of 6,390 Solar Power Plants Nationwide | |
| Ranked #1,375 out of 1,600 California Power Plants | |
| Ranked #658 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2024) |
Map of Broadway 2 - UC Riverside
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Broadway 2 - UC Riverside.
Monthly Net Generation for Broadway 2 - UC Riverside
Broadway 2 - UC Riverside Details
| Summary Information | |
|---|---|
| Plant Name | Broadway 2 - UC Riverside (64579) |
| Plant Address | 4015 Canyon Crest Dr., Riverside, CA 92507 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 33.97034, -117.33101 |
| Generation Dates on File | Jan 2020 to Dec 2024 |
| Initial Operation Date | September 2014 |
| Annual Generation | 2.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 14-783 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating September 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 3.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Broadway 2 - UC Riverside Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Solar Star California XXIX LLC | 750 Park of Commerce Blvd, Boca Raton, FL 33487 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4941 | Jersey Gardens Phase 1 | Elizabeth, NJ | 2.3 GWh |
| #4942 | IKEA Jacksonville Rooftop PV System | Jacksonville, FL | 2.3 GWh |
| #4943 | Frederick County - Landfill | Frederick, MD | 2.3 GWh |
| #4944 | Davis Solar | Goshen, NY | 2.2 GWh |
| #4945 | Seaboard Sheffield, LLC | Sheffield, MA | 2.3 GWh |
| #4946 | 7448 Candlewood Road | Hanover, MD | 2.3 GWh |
| #4947 | Greensburg Solar | Greensburg, KS | 2.3 GWh |
| #4948 | Franklin Solar, LLC | Louisburg, NC | 2.3 GWh |
| #4949 | Route 57 Solar | Agawam, MA | 2.3 GWh |
| #4950 | Southbridge Solar | Southbridge, MA | 2.3 GWh |
| #4952 | USS Cosmo Solar LLC (CSG) | Danube, MN | 2.2 GWh |
| #4953 | McCormick & Co. Inc. at Belcamp | Belcamp, MD | 2.2 GWh |
| #4954 | 601 Doremus CDG | Newark, NJ | 2.2 GWh |
| #4955 | Case Vander Eyk, Jr Dairy Solar | Pixley, CA | 2.2 GWh |
| #4956 | Petit Jean | Clinton, AR | 2.2 GWh |
| #4957 | USS Rosebud Solar LLC | Morgan, MN | 2.2 GWh |
| #4958 | Emerald Marshfields, LLC | Marshfield, MA | 2.2 GWh |
| #4959 | Ledgeview | Fond du Lac, WI | 2.2 GWh |
| #4960 | Coventry Photovoltaic, LLC | Coventry, VT | 2.2 GWh |
| #4961 | Solar BESS Hybrid | Marietta, GA | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Broadway 2 - UC Riverside.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agua Mansa Power Plant | Colton, CA | 8.8 GWh | 5.2 mi |
| Century Generating Facility | Colton, CA | 952.0 MWh | 6.4 mi |
| Chambers 4 - San Bernardino SNA7 | San Bernardino, CA | 595.0 MWh | 8.1 mi |
| Colton Solar One, LLC | San Bernardino, CA | 3.0 GWh | 8.5 mi |
| Colton Solar Two, LLC | Colton, CA | 1.1 GWh | 5.3 mi |
| Drews Generating Facility | Colton, CA | 1.0 GWh | 6.4 mi |
| ESCA-LL-COLTON, LLC | Colton, CA | 4.0 GWh | 5.1 mi |
| IGS SBD1 | Bloomington, CA | 5.0 GWh | 5.6 mi |
| IGS SBD2 | San Bernardino, CA | 4.8 GWh | 7.7 mi |
| Loma Linda University Cogen | Loma Linda, CA | 65.0 GWh | 7.3 mi |
| Park Meridian #1 | Riverside, CA | 2.5 GWh | 5.8 mi |
| Redlands Community Hospital | Redlands, CA | 9.0 GWh | 8.5 mi |
| Riverside Energy Resource Center | Riverside, CA | 71.9 GWh | 7 mi |
| Riverside RWQCP Fuel Cell | Riverside, CA | 8.5 GWh | 7.2 mi |
| SB Water Reclamation Fuel Cell | San Bernardino, CA | 9.4 GWh | 7.7 mi |
| Springs Generating Station | Riverside, CA | 825.0 MWh | 3.5 mi |
| SSI West Riverside Landfill LLC | Riverside, CA | 4.3 GWh | 2.6 mi |
| SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 900.0 MWh | 9.2 mi |
| Tequesquite Landfill Solar PV Project | Riverside, CA | 12.7 GWh | 3.1 mi |
| UC Riverside Lots 30 & 32 | Riverside, CA | 7.0 GWh | 0 mi |