Broadridge Solar, LLC
11324 NC Hwy 72 East, Lumberton, NC 28358Plant Summary Information
Broadridge Solar, LLC is ranked #149 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Broadridge Solar, LLC generated 2.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Broadridge Solar, LLC |
---|---|
Utility Name | Altus Power America Management, LLC |
Location | Robeson County, NC |
Initial Operation Date | December 2017 |
Last Update | Dec 2023 |
Annual Generation | 9.9 GWh |
Annual Consumption | 35.2 k MMBtu |
Ranked #5,931 out of 11,835 Power Plants Nationwide | |
Ranked #1,540 out of 5,643 Solar Power Plants Nationwide | |
Ranked #222 out of 862 North Carolina Power Plants | |
Ranked #149 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Soltage LLC (2016 to 2019) Broadridge Solar, LLC (2020 to 2022) Altus Power America Management, LLC (2023 to 2023) |
Map of Broadridge Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Broadridge Solar, LLC.
Monthly Net Generation for Broadridge Solar, LLC
Broadridge Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Broadridge Solar, LLC (61218) |
Plant Address | 11324 NC Hwy 72 East, Lumberton, NC 28358 |
Utility | Altus Power America Management, LLC (60281) |
Latitude, Longitude | 34.52294, -78.95721 |
Generation Dates on File | Dec 2017 to Dec 2023 |
Initial Operation Date | December 2017 |
Annual Generation | 9.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-365-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator BROAD Details Operating December 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 7.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Broadridge Solar, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1530 | Redbrook Community Solar 1 | Plympton, MA | 9.9 GWh |
#1531 | Athens MN CONX | Athens, MN | 9.9 GWh |
#1532 | West Faribault Solar | Faribault, MN | 9.9 GWh |
#1533 | Branch Solar Farm | Branch, AR | 9.9 GWh |
#1534 | Camden Dam Solar, LLC | Camden, NC | 9.9 GWh |
#1535 | Sugar Run Solar | Sunbury, NC | 9.9 GWh |
#1536 | Tate Solar | Castalia, NC | 9.9 GWh |
#1537 | Eros Solar, LLC | Mt Olive, NC | 9.9 GWh |
#1538 | Hemlock Solar | Garysburg, NC | 9.9 GWh |
#1539 | Sneads Grove | Laurinburg, NC | 9.9 GWh |
#1541 | Railroad Solar Center, LLC | Ontario, OR | 9.8 GWh |
#1542 | Wakefield Solar | Nebulon, NC | 9.8 GWh |
#1543 | Hanover Solar, LLC | Maysville, NC | 9.8 GWh |
#1544 | Palmer Solar Center | Troy, VA | 9.8 GWh |
#1545 | NorWest Energy 4, LLC | Bonanza, OR | 9.8 GWh |
#1546 | Stone Solar | Lumberton, NC | 9.8 GWh |
#1547 | White Rock Road LLC | Westerly, RI | 9.8 GWh |
#1548 | Cookstown | Goldsboro, NC | 9.8 GWh |
#1549 | Phelps 158 Solar Farm | Conway, NC | 9.8 GWh |
#1550 | Holland Solar Farm | Holland Township, NJ | 9.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Broadridge Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Baltimore Church Solar, LLC | Fairmont, NC | 5.4 GWh | 11.8 mi |
Barker Solar, LLC | Lumberton, NC | 9.0 GWh | 8 mi |
Bladenboro Farm | Bladenboro, NC | 9.1 GWh | 8.2 mi |
Bladenboro Solar 2 | Bladenboro, NC | 8.8 GWh | 9.1 mi |
Bladenboro Solar, LLC | Bladenboro, NC | 8.9 GWh | 8.1 mi |
Bo Biggs Solar | Lumberton, NC | 8.8 GWh | 4.1 mi |
Fairmont-FLS 100 | Fairmont, NC | 6.4 GWh | 9.8 mi |
Floyd Solar, LLC | Fairmont, NC | 9.5 GWh | 10.2 mi |
FLS Solar 170, LLC | Lumberton, NC | 3.4 GWh | 5.4 mi |
FLS Solar 200, LLC | Lumberton, NC | 6.4 GWh | 4.2 mi |
Innovative Solar 31 | Bladenboro, NC | 63.7 GWh | 11.5 mi |
Jersey Holdings | Lumberton, NC | 9.6 GWh | 5.4 mi |
Panda Solar NC 1, LLC | Fairmont, NC | 1.8 GWh | 9.6 mi |
Panda Solar NC 2, LLC | Fairmont, NC | 3.3 GWh | 9.3 mi |
Panda Solar NC 3, LLC | Lumberton, NC | 4.0 GWh | 10.7 mi |
Progress Solar II, LLC | Fairmont, NC | 5.4 GWh | 8.6 mi |
Stone Solar | Lumberton, NC | 9.8 GWh | 5.9 mi |
Turkey Branch Solar LLC | Fairmont, NC | 8.1 GWh | 8.4 mi |
W H Weatherspoon | Lumberton, NC | 104.0 MWh | 4.6 mi |
Walters Solar (FLS 260) | Orrum, NC | 9.2 GWh | 5.5 mi |