4463 Grace Chapel Road, Granite Falls, NC 28630Plant Summary Information
Brighter Future Solar is ranked #84 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Brighter Future Solar generated 4.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Brighter Future Solar |
---|---|
Utility Name | Brighter Future Solar LLC |
Location | Caldwell County, NC |
Initial Operation Date | January 2022 |
Last Update | Dec 2023 |
Annual Generation | 21.2 GWh |
Annual Consumption | 75.9 k MMBtu |
Ranked #4,990 out of 11,835 Power Plants Nationwide | |
Ranked #1,152 out of 5,643 Solar Power Plants Nationwide | |
Ranked #147 out of 862 North Carolina Power Plants | |
Ranked #84 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Brighter Future Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brighter Future Solar.
Monthly Net Generation for Brighter Future Solar
Brighter Future Solar Details
Summary Information | |
---|---|
Plant Name | Brighter Future Solar (64910) |
Plant Address | 4463 Grace Chapel Road, Granite Falls, NC 28630 |
Utility | Brighter Future Solar LLC (64390) |
Latitude, Longitude | 35.81609, -81.37166 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | January 2022 |
Annual Generation | 21.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 21-1071-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Blue Ridge Elec Member Corp - (NC) (1889) NC |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator BFSNC Details Operating January 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 11 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 11 MW |
Winter Capacity | 11 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2022 |
---|---|
Planned Retirement | January 2052 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 230 |
Tilt Angle | 20 |
DC Net Capacity | 15.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Brighter Future Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1142 | RE Columbia 3 LLC | Mojave, CA | 21.9 GWh |
#1143 | Elbe Solar Center | Madras, OR | 21.8 GWh |
#1144 | Wallingford Solar | Wallingford, CT | 21.7 GWh |
#1145 | Nellis Air Force Base Solar Array | Las Vegas, NV | 21.7 GWh |
#1146 | DG AMP Solar Piqua Manier | Piqua, OH | 21.6 GWh |
#1147 | Bear Creek Solar Center | Bend, OR | 21.5 GWh |
#1148 | Yemassee Solar | Yemassee, SC | 21.4 GWh |
#1149 | OR Solar 2, LLC | Eagle Point, OR | 21.3 GWh |
#1150 | Cascade Solar (TX) | Wharton, TX | 21.3 GWh |
#1151 | Springerville | Springerville, AZ | 6.4 TWh |
#1153 | Champion Solar | Pelion, SC | 21.2 GWh |
#1154 | Cottonwood Solar, LLC (City of Corcoran) | Corcoran, CA | 21.1 GWh |
#1155 | Midway Green Solar | Union, SC | 21.1 GWh |
#1156 | Albany Solar | Albany, MN | 21.0 GWh |
#1157 | Camp Lejeune Solar and Energy Storage | Camp Lejeune, NC | 21.0 GWh |
#1158 | Waseca Solar | Waseca, MN | 20.9 GWh |
#1159 | KIUC Kapaia PV and BA Storage Project Hybrid | Lihue, HI | 18.9 GWh |
#1160 | Cherry Blossom Solar LLC | Hemingway, SC | 20.9 GWh |
#1161 | Leon Solar | Greenville, TX | 20.8 GWh |
#1162 | Vale Air Solar Center, LLC | Vale, OR | 20.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brighter Future Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angel Solar | Newton, NC | 8.7 GWh | 14.6 mi |
Apple Data Center - PV2 | Conover, NC | 37.8 GWh | 10.6 mi |
Apple Data Center PV3 | Conover, NC | 30.3 GWh | 14.3 mi |
Arndt Farm | Claremont, NC | 9.0 GWh | 11.3 mi |
Bernhardt Furniture Solar Farm | Lenoir, NC | 1.7 GWh | 9.8 mi |
Blackburn Landfill Co-Generation | Newton, NC | 5.6 GWh | 15 mi |
Cline Solar Farm, LLC | Hildebran, NC | 8.1 GWh | 7.1 mi |
Dragstrip Farm | Hickory, NC | 9.0 GWh | 4.7 mi |
Drexel Operations Center | Drexel, NC | 5.0 MWh | 14 mi |
Flash Solar | Conover, NC | 8.7 GWh | 8.9 mi |
Innovative Solar 26, LLC | Hildebran, NC | 3.1 GWh | 7.7 mi |
Old Catawba PV 1 | Claremont, NC | 5.8 GWh | 15.1 mi |
Oxford Dam | Conover, NC | 87.3 GWh | 10.1 mi |
Rhodhiss | Rhodhiss, NC | 58.6 GWh | 4.7 mi |
Sigmon Catawba Farm | Newton, NC | 8.7 GWh | 15.8 mi |
Sonne Two | Newton, NC | 9.0 GWh | 15.3 mi |
Stikeleather Farm | Hiddenite, NC | 9.5 GWh | 16 mi |
Taylorsville Solar LLC | Taylorsville, NC | 1.3 GWh | 13.9 mi |
Two Lines Farm | Hickory, NC | 8.8 GWh | 13.2 mi |
Ventura Solar, LLC | Taylorsville, NC | 9.5 GWh | 11.7 mi |