Brazos Wind Farm
968 Main Street, Fluvanna, TX 79517Plant Summary Information
Brazos Wind Farm is ranked #201 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Brazos Wind Farm generated 71.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Brazos Wind Farm |
---|---|
Utility Name | Shell Wind Energy Inc. |
Location | Scurry County, TX |
Initial Operation Date | December 2003 |
Last Update | Dec 2023 |
Annual Generation | 82.9 GWh |
Annual Consumption | 291.3 k MMBtu |
Ranked #3,388 out of 11,835 Power Plants Nationwide | |
Ranked #894 out of 1,343 Wind Power Plants Nationwide | |
Ranked #468 out of 749 Texas Power Plants | |
Ranked #201 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Brazos Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brazos Wind Farm.
Monthly Net Generation for Brazos Wind Farm
Brazos Wind Farm Details
Summary Information | |
---|---|
Plant Name | Brazos Wind Farm (56111) |
Plant Address | 968 Main Street, Fluvanna, TX 79517 |
Utility | Shell Wind Energy Inc. (17058) |
Latitude, Longitude | 32.94793, -101.14778 |
Generation Dates on File | Dec 2003 to Dec 2023 |
Initial Operation Date | December 2003 |
Annual Generation | 82.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating December 2003
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Jointly Owned |
Nameplate Capacity | 182.4 MW |
Summer Capacity | 182.4 MW |
Winter Capacity | 182.4 MW |
Minimum Load | 10.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 38 |
Turbine Details | |
Number Of Turbines | 38 |
---|---|
Predominant Turbine Manufacturer | Nordex |
Predominant Turbine Model Number | N155/4800 |
Design Wind Speed | 17.4 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 354 |
Brazos Wind Farm Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Shell Wind Energy Inc. | 150-C N. Dairy Ashford Rd, Houston, TX 77002 | 50.00% |
InfraRed Energy Transition Fund LP | 730 3rd Avenue, New York, NY 10017 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#884 | Casselman Wind Power Project | Garrett, PA | 85.8 GWh |
#885 | Busch Ranch Wind Energy Farm | Walsenburg, CO | 85.2 GWh |
#886 | Ainsworth Wind | Ainsworth, NE | 84.7 GWh |
#887 | Buffalo Ridge I LLC | Elkton, SD | 84.7 GWh |
#888 | Bluegrass Ridge | King City, MO | 84.1 GWh |
#889 | Whirlwind Energy Center | Floydada, TX | 83.9 GWh |
#890 | Greenfield Wind - MT | Fairfield, MT | 83.7 GWh |
#891 | Auwahi Wind Energy Hybrid | Kula, HI | 83.6 GWh |
#892 | Mojave 3/4/5 | Mojave, CA | 83.2 GWh |
#893 | G McNeilus Wind Farm Dodge Center | Dodge Center, MN | 83.1 GWh |
#895 | Saddleback Ridge Wind Farm | Carthage, ME | 82.5 GWh |
#896 | Diamond Willow Wind Facility | Baker, MT | 82.1 GWh |
#897 | Bull Hill Wind Project | Eastbrook, ME | 81.6 GWh |
#898 | Patton Wind Farm | Patton, PA | 81.2 GWh |
#899 | Conception | Stanberry, MO | 79.9 GWh |
#900 | Rolling Thunder Wind Farm Hybrid | Miller, SD | 79.7 GWh |
#901 | Dutch Hill Wind Project | Cohocton, NY | 79.5 GWh |
#902 | Rock Aetna Power Partners | Woodstock, MN | 79.3 GWh |
#903 | Ridgewind | Woodstock, MN | 78.9 GWh |
#904 | Fair Wind | Oakland, MD | 78.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brazos Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amadeus Wind Farm | Rotan, TX | 790.7 GWh | 33.9 mi |
Bull Creek Wind | O'Donnell, TX | 269.0 GWh | 25 mi |
Canyon Wind Project, LLC | Scurry, TX | 695.6 GWh | 23.3 mi |
Coyote Wind LLC | Snyder, TX | 625.5 GWh | 17.7 mi |
Dermott Wind | Snyder, TX | 904.5 GWh | 11.6 mi |
EG178 Facility | Snyder, TX | 686.9 GWh | 17.8 mi |
ENGIE Long Draw Solar LLC | Gail, TX | 526.1 GWh | 31 mi |
Fluvanna | Fluvanna, TX | 528.5 GWh | 1.1 mi |
Gopher Creek Wind Farm | Fluvanna, TX | 618.0 GWh | 6.2 mi |
Juno Solar Project | Lamesa, TX | 795.1 GWh | 18.6 mi |
Lumina II Solar Project | Snyder, TX | 489.6 GWh | 23.7 mi |
Lumina Solar Project | Snyder, TX | 510.3 GWh | 10.1 mi |
Post Wind Farm LP | Fluvanna, TX | 311.7 GWh | 4.4 mi |
Scurry County Wind II | Snyder, TX | 201.1 GWh | 26 mi |
Scurry County Wind LP | Snyder, TX | 233.6 GWh | 18 mi |
Stephens Ranch Wind Energy LLC | O'Donnell, TX | 1.1 TWh | 29 mi |
Tahoka Wind | Tahoka, TX | 1.1 TWh | 33.8 mi |
Texas Solar Nova 1 | Spur, TX | 640.0 GWh | 27.5 mi |
Texas Solar Nova 2 | Spur, TX | 328.9 GWh | 27.5 mi |
WAL1272 | Snyder, TX | 287.0 MWh | 22.2 mi |