Brazoria County Solar Project (Danciger)

2338 CR 772, Damon, TX 77430

Plant Summary Information

Brazoria County Solar Project (Danciger) is ranked #41 out of 178 solar farms in Texas in terms of total annual net electricity generation.

Brazoria County Solar Project (Danciger) generated 86.1 GWh during the 3-month period between September 2024 to December 2024.

Plant NameBrazoria County Solar Project (Danciger)
Utility NameBrazoria County Solar Project
LocationBrazoria County, TX
Initial Operation DateJuly 2022
Last Update Dec 2024
Annual Generation 387.4 GWh
Annual Consumption 1.4 M MMBtu
Ranked #1,567 out of 11,949 Power Plants Nationwide
Ranked #116 out of 5,739 Solar Power Plants Nationwide
Ranked #305 out of 769 Texas Power Plants
Ranked #41 out of 178 Texas Solar Power Plants
Fuel Types Solar

Map of Brazoria County Solar Project (Danciger)

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brazoria County Solar Project (Danciger).

Create Your Account Today

Monthly Net Generation for Brazoria County Solar Project (Danciger)

60k60k50k50k40k40k30k30k20k20k10k10k00Oct '22Oct '22Dec '22Dec '22Feb '23Feb '23Apr '23Apr '23Jun '23Jun '23Aug '23Aug '23Oct '23Oct '23Dec '23Dec '23Feb '24Feb '24Apr '24Apr '24Jun '24Jun '24Aug '24Aug '24Oct '24Oct '24Dec '24Dec '24
Download SVG
Download PNG
Download CSV

Brazoria County Solar Project (Danciger) Details

Summary Information
Plant NameBrazoria County Solar Project (Danciger) (66046)
Plant Address2338 CR 772, Damon, TX 77430
UtilityBrazoria County Solar Project (65221)
Latitude, Longitude29.1779, -95.7612
Generation Dates on FileOct 2022 to Dec 2024
Initial Operation DateJuly 2022
Annual Generation 387.4 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number22-86-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerCenterPoint Energy (8901) TX
Grid Voltage 138.00 kV
Energy StorageNo

Generator BRZ01 Details Operating July 2022

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
RTO ISO LMP Node DesignationDAG_ALL
RTO ISO Location Designation For Reporting Wholesale Sales DataDAG_ALL
Nameplate Capacity200 MW
Summer Capacity200 MW
Winter Capacity200 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
DC Net Capacity262.5 MW
Thin Film CDTEYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Brazoria County Solar Project (Danciger) Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#106Samson Solar EnergyCunningham, TX400.2 GWh
#107Sky Ranch SolarBelen, NM388.9 GWh
#108Castle Gap Solar HybridMcCarney, TX396.1 GWh
#109Shakes SolarCarrizo Springs, TX393.6 GWh
#110Yellow Pine SolarEnterprise, NV381.0 GWh
#111RE GarlandRosamond, CA383.7 GWh
#112North Rosamond Solar LLCRosamond, CA392.7 GWh
#113Riverstart Solar Park LLCModoc, IN388.6 GWh
#114Imperial Solar Energy Center WestSeeley, CA388.3 GWh
#115Buena Vista Energy CenterChaparral, NM384.6 GWh
#117ChestnutLemoore, CA384.5 GWh
#118Hillcrest SolarMt. Orab, OH384.3 GWh
#119Mustang TwoLemoore, CA384.1 GWh
#120Sun Streams 3Arlington, AZ547.4 GWh
#121Holstein 1 Solar FarmWingate, TX382.1 GWh
#122Solar Gen 2 Solar FacilityCalipatria, CA376.5 GWh
#123Buckthorn WestexFt. Stockton, TX376.1 GWh
#124Maverick Solar, LLCDesert Center, CA375.4 GWh
#125Madison Fields Solar Project, LLCIrwin, OH370.6 GWh
#126Indiana Crossroads Solar ParkReynolds, IN367.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Brazoria County Solar Project (Danciger).

Plant NamePlant LocationAnnual GenerationDistance
Braes Bayou PlantRichmond, TX386.9 GWh22.6 mi
Brazoria WestDamon, TX411.9 GWh6 mi
Brotman Power StationRosharon, TX453.8 GWh23.5 mi
Cascade Solar (TX)Wharton, TX21.3 GWh15.9 mi
Colorado Bend Energy CenterWharton, TX2.4 TWh20 mi
Colorado Bend IIWharton, TX7.0 TWh19.9 mi
Cutlass Solar 1 LLCRichmond, TX213.8 GWh16.1 mi
Fighting Jays Solar ProjectNeedville, TX283.8 GWh12.5 mi
HEB00292Bay City, TX290.0 MWh18 mi
Jack Fusco Energy CenterThompsons, TX3.4 TWh22 mi
Mark One Power StationAngleton, TX329.3 GWh20.2 mi
Newgulf CogenNewGulf, TX32.9 GWh10.2 mi
Old 300 Solar Center, LLCNeedville, TX196.7 GWh11.4 mi
Petra Nova Carbon Capture CogenThompsons, TX109.0 GWh21.9 mi
Red Tailed Hawk Solar LLCPierce, TX221.5 GWh23 mi
Rowland Solar IIRichmond, TX208.3 GWh14.7 mi
Second Division SolarWest Columbia, TX14.0 GWh1.3 mi
Sweeny Cogen FacilityOld Ocean, TX2.9 TWh7.3 mi
W A ParishThompsons, TX12.2 TWh22.5 mi
WagyuDamon, TX208.3 GWh7.6 mi