Brazoria County Solar Project (Danciger)
2338 CR 772, Damon, TX 77430Plant Summary Information
Brazoria County Solar Project (Danciger) is ranked #37 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Brazoria County Solar Project (Danciger) generated 134.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Brazoria County Solar Project (Danciger) |
---|---|
Utility Name | Brazoria County Solar Project |
Location | Brazoria County, TX |
Initial Operation Date | July 2022 |
Last Update | Aug 2024 |
Annual Generation | 385.6 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,546 out of 11,835 Power Plants Nationwide | |
Ranked #104 out of 5,643 Solar Power Plants Nationwide | |
Ranked #297 out of 749 Texas Power Plants | |
Ranked #37 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Brazoria County Solar Project (Danciger)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brazoria County Solar Project (Danciger).
Monthly Net Generation for Brazoria County Solar Project (Danciger)
Brazoria County Solar Project (Danciger) Details
Summary Information | |
---|---|
Plant Name | Brazoria County Solar Project (Danciger) (66046) |
Plant Address | 2338 CR 772, Damon, TX 77430 |
Utility | Brazoria County Solar Project (65221) |
Latitude, Longitude | 29.1779, -95.7612 |
Generation Dates on File | Oct 2022 to Aug 2024 |
Initial Operation Date | July 2022 |
Annual Generation | 385.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 22-86-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator BRZ01 Details Operating July 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | DAG_ALL |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DAG_ALL |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 262.5 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Brazoria County Solar Project (Danciger) Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#94 | RE Garland | Rosamond, CA | 383.7 GWh |
#95 | Yellow Pine Solar | Enterprise, NV | 377.8 GWh |
#96 | Buena Vista Energy Center | Chaparral, NM | 386.6 GWh |
#97 | Holstein 1 Solar Farm | Wingate, TX | 389.6 GWh |
#98 | Arica Solar | Desert Center, CA | 387.7 GWh |
#99 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#100 | Samson Solar Energy | Cunningham, TX | 388.3 GWh |
#101 | North Rosamond Solar LLC | Rosamond, CA | 387.0 GWh |
#102 | Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh |
#103 | Riverstart Solar Park LLC | Modoc, IN | 386.0 GWh |
#105 | Mustang Two | Lemoore, CA | 385.4 GWh |
#106 | Fox Squirrel Solar | Mt Sterling, OH | 384.4 GWh |
#107 | Hillcrest Solar | Mt. Orab, OH | 380.0 GWh |
#108 | Buckthorn Westex | Ft. Stockton, TX | 377.4 GWh |
#109 | Solar Gen 2 Solar Facility | Calipatria, CA | 376.5 GWh |
#110 | Maverick Solar, LLC | Desert Center, CA | 375.5 GWh |
#111 | Wright Solar Park | Los Banos, CA | 370.5 GWh |
#112 | RE Roserock | Fort Stockton, TX | 368.6 GWh |
#113 | Prairie Wolf Solar LLC | Ashmore Township, IL | 368.1 GWh |
#114 | Indiana Crossroads Solar Park | Reynolds, IN | 365.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brazoria County Solar Project (Danciger).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BASF Freeport Works | Feeeport, TX | 588.6 GWh | 25.3 mi |
Braes Bayou Plant | Richmond, TX | 352.1 GWh | 22.6 mi |
Brazoria West | Damon, TX | 408.5 GWh | 6 mi |
Brotman Power Station | Rosharon, TX | 380.8 GWh | 23.5 mi |
Cascade Solar (TX) | Wharton, TX | 21.3 GWh | 15.9 mi |
Colorado Bend Energy Center | Wharton, TX | 2.6 TWh | 20 mi |
Colorado Bend II | Wharton, TX | 7.2 TWh | 19.9 mi |
Cutlass Solar 1 LLC | Richmond, TX | 209.1 GWh | 16.1 mi |
Fighting Jays Solar Project | Needville, TX | 349.0 GWh | 12.5 mi |
Freeport Energy | Freeport, TX | 2.1 TWh | 24.9 mi |
HEB00292 | Bay City, TX | 290.0 MWh | 18 mi |
Jack Fusco Energy Center | Thompsons, TX | 3.2 TWh | 22 mi |
Mark One Power Station | Angleton, TX | 222.8 GWh | 20.2 mi |
Newgulf Cogen | NewGulf, TX | 32.9 GWh | 10.2 mi |
Petra Nova Carbon Capture Cogen | Thompsons, TX | 109.0 GWh | 21.9 mi |
Peyton Creek Wind Farm LLC | Bay City, TX | 392.5 GWh | 23.9 mi |
Rowland Solar II | Richmond, TX | 81.8 GWh | 14.7 mi |
Sweeny Cogen Facility | Old Ocean, TX | 2.5 TWh | 7.3 mi |
W A Parish | Thompsons, TX | 11.6 TWh | 22.5 mi |
Wagyu | Damon, TX | 202.2 GWh | 7.6 mi |