Brame Energy Center
275 Rodemacher Rd, Lena, LA 71447Plant Summary Information
Brame Energy Center is ranked #13 out of 77 power plants in Louisiana in terms of total annual net electricity generation.
Brame Energy Center is comprised of 3 generators and generated 863.9 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Brame Energy Center |
---|---|
Utility Name | Cleco Power LLC |
Location | Rapides Parish, LA |
Initial Operation Date | June 1975 |
Last Update | Sep 2024 |
Annual Generation | 3.0 TWh |
Annual Consumption | 40.7 M MMBtu |
Ranked #387 out of 11,852 Power Plants Nationwide | |
Ranked #60 out of 132 Subbituminous Coal Power Plants Nationwide | |
Ranked #13 out of 77 Louisiana Power Plants | |
Ranked #1 out of 3 Louisiana Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 54.9% Natural Gas : 41.2% Petroleum Coke : 2.9% Bituminous Coal : 1.0% |
Map of Brame Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brame Energy Center.
Monthly Net Generation for Brame Energy Center
Brame Energy Center Details
Summary Information | |
---|---|
Plant Name | Brame Energy Center (6190) |
Plant Address | 275 Rodemacher Rd, Lena, LA 71447 |
Utility | Cleco Power LLC (3265) |
Latitude, Longitude | 31.395, -92.71667 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | June 1975 |
Annual Generation | 3.0 TWh |
Fuel Types | Subbituminous Coal : 54.9% Natural Gas : 41.2% Petroleum Coke : 2.9% Bituminous Coal : 1.0% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Rodemacher Lake |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | Cleco Power LLC (3265) LA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name | TRUNKLINE GAS COMPANY |
Pipeline Notes | Per our Supervisor of NG procurement, "none of these are LDC's. They are interstate and/or intrastate pipelines." |
Natural Gas Storage | No |
Generator 1 Details Operating June 1975
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CLEC.NPS1 |
Nameplate Capacity | 445.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 416.8 MW |
Winter Capacity | 422 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating August 1982
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | CLEC.RPS2 |
Nameplate Capacity | 558 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 496 MW |
Winter Capacity | 493 MW |
Minimum Load | 180 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1982 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating February 2010
Technology | Petroleum Coke |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CLECO.MPS3 |
Nameplate Capacity | 703.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 637.2 MW |
Winter Capacity | 628 MW |
Minimum Load | 400 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2010 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Petroleum Coke / Bituminous Coal / Natural Gas / Subbituminous Coal / Lignite Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Fluidized Bed Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | PC / SUB / LIG / BIT / WDS |
---|
Brame Energy Center Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Cleco Power LLC | 2030 Donahue Ferry Road, P.O. Box 5000, Pineville, LA 71361 | Generator 2 | 30.00% |
Louisiana Energy & Power Authority | 210 Venture Way, Lafayette, LA 70507 | Generator 2 | 20.00% |
Lafayette Utilities System | P O Box 4017-C, Lafayette, LA 70502 | Generator 2 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#50 | Hawthorn | Kansas City, MO | 3.0 TWh |
#51 | Harrington | Amarillo, TX | 2.3 TWh |
#52 | Kincaid Generation LLC | Kincaid, IL | 2.2 TWh |
#53 | Kingston | Kingston, TN | 3.3 TWh |
#54 | Flint Creek | Gentry, AR | 2.1 TWh |
#55 | Powerton | Pekin, IL | 2.0 TWh |
#56 | Edgewater | Sheboygan, WI | 2.0 TWh |
#57 | John Twitty Energy Center | Springfield, MO | 2.1 TWh |
#58 | Wyodak | Gillette, WY | 1.9 TWh |
#59 | Naughton | Kemmerer, WY | 3.0 TWh |
#61 | Cholla | Joseph City, AZ | 1.6 TWh |
#62 | Tolk | Muleshoe, TX | 1.9 TWh |
#63 | Big Cajun 2 | New Roads, LA | 2.4 TWh |
#64 | Big Stone | Big Stone City, SD | 1.6 TWh |
#65 | Sikeston Power Station | Sikeston, MO | 1.5 TWh |
#66 | Sooner | Red Rock, OK | 1.5 TWh |
#67 | Ottumwa | Ottumwa, IA | 1.5 TWh |
#68 | Victor J Daniel Jr | Escatawpa, MS | 8.2 TWh |
#69 | R S Nelson | Westlake, LA | 1.4 TWh |
#70 | Northeastern | Oologah, OK | 3.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brame Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Acadia Energy Center | Eunice, LA | 5.5 TWh | 69.2 mi |
ADA Carbon Solutions Red River | Coushatta, LA | 100.5 GWh | 57.8 mi |
Agrilectric Power Partners Ltd | Lake Charles, LA | 84.7 GWh | 86 mi |
Bayou Cove Peaking Power | Jennings, LA | 106.1 GWh | 77.2 mi |
Coughlin Power Station | St Landry, LA | 4.5 TWh | 46.6 mi |
D G Hunter | Alexandria, LA | 117.8 GWh | 15.9 mi |
DeRidder Mill | DeRidder, LA | 389.0 GWh | 53.7 mi |
Elizabeth Solar Plant | Pitkin, LA | 54.8 GWh | 42.5 mi |
International Paper Red River Mill | Campti, LA | 370.6 GWh | 44.3 mi |
Lake Charles Power | West Lake, LA | 5.9 TWh | 84.8 mi |
Louisiana Tech University Power Plant | Ruston, LA | 46.6 GWh | 78.2 mi |
Mansfield Mill | Mansfield, LA | 812.2 GWh | 72.2 mi |
Plant 31 Paper Mill | West Monroe, LA | 490.9 GWh | 82.4 mi |
PPG Plant C Caustic | Lake Charles, LA | 6.0 GWh | 87.7 mi |
PPG Riverside | Lake Charles, LA | 98.5 GWh | 87.7 mi |
R S Nelson | Westlake, LA | 1.4 TWh | 84 mi |
Sam Rayburn Dam | Jasper, TX | 106.5 GWh | 85.3 mi |
Sidney A Murray Jr Hydroelectric | Vidalia, LA | 707.5 GWh | 68.2 mi |
Toledo Bend | Burkville, TX | 231.5 GWh | 52.4 mi |
Westrock Hodge (LA) | Hodge, LA | 412.2 GWh | 60.8 mi |