Brainerd Public Utilities
1501 Mill Ave NE, Brainerd, MN 56401Plant Summary Information
Brainerd Public Utilities is ranked #13 out of 26 hydroelectric power plants in Minnesota in terms of total annual net electricity generation.
Brainerd Public Utilities is comprised of 5 generators and generated 2.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Brainerd Public Utilities |
---|---|
Utility Name | Brainerd Public Utilities |
Location | Crow Wing County, MN |
Initial Operation Date | January 1917 |
Last Update | Dec 2023 |
Annual Generation | 10.9 GWh |
Annual Consumption | 41.6 k MMBtu |
Ranked #5,771 out of 11,835 Power Plants Nationwide | |
Ranked #939 out of 1,371 Water Power Plants Nationwide | |
Ranked #136 out of 736 Minnesota Power Plants | |
Ranked #13 out of 26 Minnesota Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Wausau Paper Mills LLC (2013 to 2013) Brainerd Public Utilities (2014 to 2023) |
Map of Brainerd Public Utilities
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brainerd Public Utilities.
Monthly Net Generation for Brainerd Public Utilities
Brainerd Public Utilities Details
Summary Information | |
---|---|
Plant Name | Brainerd Public Utilities (50636) |
Plant Address | 1501 Mill Ave NE, Brainerd, MN 56401 |
Utility | Brainerd Public Utilities (2138) |
Latitude, Longitude | 46.3758, -94.1817 |
Generation Dates on File | Jan 2002 to Dec 2023 |
Initial Operation Date | January 1917 |
Annual Generation | 10.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 85-708-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Mississippi River |
Ash Impoundment | No |
Transmission / Distribution Owner | Brainerd Public Utilities (2138) MN |
Grid Voltage | 34.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CENTERPOINT ENERGY |
Generator 1 Details Operating January 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 2 Details Operating January 1917
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1917 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 4 Details Out of Service January 1936
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | January 1936 |
Planned Retirement | December 2025 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 3 Details OA July 1936
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | July 1936 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 5 Details Operating January 1940
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1940 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Brainerd Public Utilities Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#929 | Dorena Hydro-Electric Facility | Cottage Grove, OR | 11.1 GWh |
#930 | Carver Falls | Hampton, NY | 11.1 GWh |
#931 | Washoe | Verdi, NV | 11.1 GWh |
#932 | Elkhart | Elkhart, IN | 11.1 GWh |
#933 | Lake Mendocino | Ukiah, CA | 11.1 GWh |
#934 | Ashokan | Kingston, NY | 11.0 GWh |
#935 | Slate Creek | Lakehead, CA | 11.0 GWh |
#936 | Flint Creek Hydroelectric LLC | Philipsburg, MT | 11.0 GWh |
#937 | Juniper Ridge Hydroelectric Project | Bend, OR | 10.9 GWh |
#938 | Phoenix Hydro Project | Phoenix, NY | 10.9 GWh |
#940 | Gross Hydro Plant | Boulder, CO | 10.8 GWh |
#941 | New Hogan Power Plant | Valley Springs, CA | 10.8 GWh |
#942 | Shavano Falls Hydro | Montrose, CO | 10.8 GWh |
#943 | Turner Shoals | Mill Springs, NC | 10.8 GWh |
#944 | Quail Creek Hydro Plant #1 | Hurricane, UT | 10.8 GWh |
#945 | Indian Orchard | Indian Orchard, MA | 10.6 GWh |
#946 | Boulder Canyon Hydro | Boulder, CO | 10.6 GWh |
#947 | Big Creek Water Works | Hyampom, CA | 10.6 GWh |
#948 | Whitman | Ketchikan, AK | 10.6 GWh |
#949 | Mill Creek 3 | Mill Creek, CA | 10.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brainerd Public Utilities.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
B.R. Sartell CSG | Sartell, MN | 3.2 GWh | 49.2 mi |
B.R. Sauk Rapids CSG | Sauk Rapids, MN | 7.5 GWh | 52.2 mi |
Blanchard | Royalton, MN | 60.7 GWh | 36.5 mi |
Brainerd Airport | Brainerd, MN | 10.4 GWh | 2.2 mi |
Caelum Community Solar | Foley, MN | 2.9 GWh | 50.7 mi |
Camp Ripley Solar | Little Falls, MN | 15.8 GWh | 21.1 mi |
Little Falls (MN) | Little Falls, MN | 27.4 GWh | 29.1 mi |
Novel Novak Solar LLC CSG | Foley, MN | 1.5 GWh | 50.9 mi |
Novel Pederson Solar CSG | Sauk Rapids, MN | 1.7 GWh | 52.2 mi |
Pillager | Pillager, MN | 5.7 GWh | 15 mi |
Stevens Community Solar LLC | Foley, MN | 2.2 GWh | 50.7 mi |
Studenski Community Solar LLC CSG | Sauk Rapids, MN | 1.8 GWh | 51.9 mi |
Svihel Community Solar LLC CSG | Foley, MN | 2.0 GWh | 49.8 mi |
Sylvan | Pillager, MN | 8.0 GWh | 10.5 mi |
Sylvan Solar | Pillager, MN | 12.4 GWh | 10.5 mi |
USS Brockway Solar CSG | Sartell, MN | 2.0 GWh | 47.9 mi |
USS Foley Solar LLC | Foley, MN | 2.2 GWh | 49.6 mi |
USS JJ Solar CSG | Sauk Rapids, MN | 2.1 GWh | 51.5 mi |
USS Mayhew Solar LLC CSG | Sauk Rapids, MN | 2.0 GWh | 52.3 mi |
USS Reindeer Solar LLC CSG | Sauk Rapids, MN | 2.1 GWh | 51 mi |