Braes Bayou Plant
2929 Lockwood Gubble Road, Richmond, TX 77469Plant Summary Information
Braes Bayou Plant is ranked #105 out of 288 natural gas power plants in Texas in terms of total annual net electricity generation.
Braes Bayou Plant is comprised of 8 generators and generated 71.7 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Braes Bayou Plant |
---|---|
Utility Name | ProEnergy Services |
Location | Fort Bend County, TX |
Initial Operation Date | February 2022 |
Last Update | Mar 2024 |
Annual Generation | 330.9 GWh |
Annual Consumption | 3.4 M MMBtu |
Ranked #1,787 out of 11,249 Power Plants Nationwide | |
Ranked #628 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #317 out of 721 Texas Power Plants | |
Ranked #105 out of 288 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Braes Bayou Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Braes Bayou Plant.
Monthly Net Generation for Braes Bayou Plant
Braes Bayou Plant Details
Summary Information | |
---|---|
Plant Name | Braes Bayou Plant (64383) |
Plant Address | 2929 Lockwood Gubble Road Richmond, TX 77469 |
Utility | ProEnergy Services (63082) |
Latitude, Longitude | 29.48028, -95.62028 |
Generation Dates on File | Jun 2022 to Mar 2024 |
Initial Operation Date | February 2022 |
Annual Generation | 330.9 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KINDER MORGAN TEJAS PIPELINE LLC |
Natural Gas Storage | No |
Generator CTG-6 Details Operating February 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | RABSMR01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-3 Details Operating May 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | RABSMR01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-4 Details Operating May 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | RABSMR01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-5 Details Operating May 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | RABSMR01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-7 Details Operating May 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | RABSMR01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-8 Details Operating May 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | RABSMR01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-2 Details Operating June 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | RABSMR01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-1 Details Operating August 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | RABSMR01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Braes Bayou Plant Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Braes Bayou Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-1 | 100.00% |
Braes Bayou Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-2 | 100.00% |
Braes Bayou Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-3 | 100.00% |
Braes Bayou Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-4 | 100.00% |
Braes Bayou Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-5 | 100.00% |
Braes Bayou Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-6 | 100.00% |
Braes Bayou Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-7 | 100.00% |
Braes Bayou Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#618 | ArcelorMittal Burns Harbor | Burns Harbor, IN | 1.1 TWh |
#619 | Roseville Energy Park | Roseville, CA | 348.8 GWh |
#620 | THUMS | Long Beach, CA | 344.7 GWh |
#621 | US Borax | Boron, CA | 344.2 GWh |
#622 | Formosa Plastics | Baton Rouge, LA | 339.7 GWh |
#623 | Selkirk Cogen | Selkirk, NY | 339.2 GWh |
#624 | Manchief Electric Generating Station | Brush, CO | 333.9 GWh |
#625 | Darby Power, LLC | Mt Sterling, OH | 350.6 GWh |
#626 | Edge Moor | Wilmington, DE | 354.0 GWh |
#627 | Dahlberg | Nicholson, GA | 334.0 GWh |
#629 | Malburg | Vernon, CA | 329.0 GWh |
#630 | Red Gate Power Plant | Edinburg, TX | 328.4 GWh |
#631 | Carlsbad Energy Center | Carlsbad, CA | 326.8 GWh |
#632 | Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh |
#633 | Marsh Run Generation Facility | Remington, VA | 345.7 GWh |
#634 | West Point (PA) | West Point, PA | 319.1 GWh |
#635 | RED-Rochester, LLC | Rochester, NY | 319.0 GWh |
#636 | Broad River Energy Center | Gaffney, SC | 315.0 GWh |
#637 | Spindle Hill Energy Center | Fort Lupton, CO | 316.8 GWh |
#638 | Denton Energy Center | Denton, TX | 312.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Braes Bayou Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brotman Power Station | Rosharon, TX | 311.9 GWh | 13.7 mi |
Cutlass Solar 1 LLC | Richmond, TX | 230.9 GWh | 8.4 mi |
Fighting Jays Solar Project | Needville, TX | 516.7 GWh | 11.3 mi |
Friendswood Energy | Houston, TX | 73.8 GWh | 15.4 mi |
FTBLID2 | Sugarland, TX | 1.1 GWh | 6.6 mi |
HEB00063 | Pearland, TX | 390.0 MWh | 14.9 mi |
HEB00110 | Missouri City, TX | 269.7 MWh | 6.4 mi |
HO Clarke Generating | Houston, TX | 444.7 GWh | 15.3 mi |
Jack Fusco Energy Center | Thompsons, TX | 3.3 TWh | 0.6 mi |
Mckeever | Fresno, TX | 503.0 MWh | 8.7 mi |
Southwick | Houston, TX | 486.0 MWh | 17.3 mi |
W A Parish | Thompsons, TX | 11.7 TWh | 0.7 mi |
Wagyu | Damon, TX | 207.8 GWh | 16.6 mi |
WAL2993 | Sugar Land, TX | 273.0 MWh | 9.3 mi |
WAL3302 | Houston, TX | 327.0 MWh | 14.2 mi |
WAL3572 | Pearland, TX | 196.2 MWh | 15.2 mi |
WAL3827 | Richmond, TX | 264.3 MWh | 17.2 mi |
WAL546 | Richmond, TX | 236.7 MWh | 10 mi |
WAL772 | Houston, TX | 303.0 MWh | 16.7 mi |
Westhollow Technology Center | Houston, TX | 21.9 GWh | 17 mi |