Brady II Wind Energy Center
5206 109th AVE SW, Dickinson, ND 58601Plant Summary Information
Brady II Wind Energy Center is ranked #13 out of 57 power plants in North Dakota in terms of total annual net electricity generation.
Brady II Wind Energy Center generated 172.6 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Brady II Wind Energy Center |
---|---|
Utility Name | Brady Wind II, LLC |
Location | Stark County, ND |
Initial Operation Date | December 2016 |
Last Update | Dec 2024 |
Annual Generation | 632.2 GWh |
Annual Consumption | 2.4 M MMBtu |
Ranked #1,061 out of 11,949 Power Plants Nationwide | |
Ranked #238 out of 1,354 Wind Power Plants Nationwide | |
Ranked #13 out of 57 North Dakota Power Plants | |
Ranked #5 out of 40 North Dakota Wind Power Plants | |
Fuel Types | Wind |
Map of Brady II Wind Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brady II Wind Energy Center.
Monthly Net Generation for Brady II Wind Energy Center
Brady II Wind Energy Center Details
Summary Information | |
---|---|
Plant Name | Brady II Wind Energy Center (60354) |
Plant Address | 5206 109th AVE SW, Dickinson, ND 58601 |
Utility | Brady Wind II, LLC (60149) |
Latitude, Longitude | 46.61152, -102.78821 |
Generation Dates on File | Dec 2016 to Dec 2024 |
Initial Operation Date | December 2016 |
Annual Generation | 632.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Basin Electric Power Coop (1307) ND |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator BWEC2 Details Operating December 2016
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Minimum Load | 37 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 72 |
Turbine Details | |
Number Of Turbines | 72 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.0-116 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 315 |
Brady II Wind Energy Center Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#228 | High Prairie Wind Farm | Queen City, MO | 648.7 GWh |
#229 | Glacier Sands Wind Power, LLC | Mason City, IL | 646.4 GWh |
#230 | Wildorado Wind LLC | Vega, TX | 643.2 GWh |
#231 | Solano Wind | Rio Vista, CA | 640.8 GWh |
#232 | Sundance Wind Project, LLC | Alva, OK | 640.4 GWh |
#233 | Jayhawk Wind Energy Center | Hepler, KS | 638.4 GWh |
#234 | Maple Ridge Wind Farm | Lowville, NY | 636.6 GWh |
#235 | Caney River Wind Project | Howard, KS | 636.5 GWh |
#236 | Wild Horse | Ellensburg, WA | 636.8 GWh |
#237 | Coyote Wind LLC | Snyder, TX | 635.3 GWh |
#239 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 623.3 GWh |
#240 | Headwaters Wind Farm LLC | Winchester, IN | 622.9 GWh |
#241 | Sweetwater Wind 4 LLC | Roscoe, TX | 621.9 GWh |
#242 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 620.9 GWh |
#243 | Golden Hill Wind | Wasco, OR | 620.8 GWh |
#244 | Boiling Springs Wind Farm | Woodward, OK | 620.5 GWh |
#245 | South Hurlburt Wind LLC | Arlington, OR | 619.5 GWh |
#246 | North Hurlburt Wind LLC | Arlington, OR | 619.3 GWh |
#247 | Wheatridge Hybrid | Morrow, OR | 738.2 GWh |
#248 | Brady Wind Energy Center | Dickinson, ND | 615.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brady II Wind Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Valley | Beulah, ND | 5.2 TWh | 69 mi |
Bison 2 Wind Energy Center | New Salem, ND | 236.8 GWh | 63.7 mi |
Bison 3 Wind Energy Center | New Salem, ND | 242.1 GWh | 63.7 mi |
Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh | 63.7 mi |
Bison I Wind Energy Center | New Salem, ND | 181.7 GWh | 63.7 mi |
Brady Wind Energy Center | Dickinson, ND | 615.5 GWh | 2.7 mi |
Cedar Hills Wind Farm | Rhame, ND | 52.3 GWh | 53 mi |
Coyote | Beulah, ND | 2.2 TWh | 62.3 mi |
Diamond Willow Wind Facility | Baker, MT | 82.1 GWh | 70.4 mi |
FPL Energy Oliver Wind I LLC | Center, ND | 171.5 GWh | 83.9 mi |
FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh | 83.9 mi |
Garrison | Riverside, ND | 2.1 TWh | 89 mi |
Glen Ullin Energy Center | Glen Ullin, ND | 433.0 GWh | 52 mi |
Glen Ullin Station 6 | Glen Ullin, ND | 38.0 GWh | 51 mi |
Leland Olds | Stanton, ND | 3.1 TWh | 83.2 mi |
Milton R Young | Center, ND | 4.3 TWh | 80.8 mi |
Oliver Wind III, LLC | Mandan, ND | 416.9 GWh | 80.3 mi |
Oliver Wind IV | Hannover, ND | 39.7 GWh | 65.9 mi |
Sunflower Wind Project | Mandan, ND | 427.5 GWh | 37.2 mi |
Thunder Spirit Wind, LLC | Hettinger, ND | 487.7 GWh | 38.6 mi |