Boulder Solar II, LLC
17445 South US HWY 95, Boulder City, NV 89005Plant Summary Information
Boulder Solar II, LLC is ranked #25 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
Boulder Solar II, LLC generated 41.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Boulder Solar II, LLC |
---|---|
Utility Name | Invenergy Services LLC |
Location | Clark County, NV |
Initial Operation Date | January 2017 |
Last Update | Aug 2024 |
Annual Generation | 124.4 GWh |
Annual Consumption | 465.3 k MMBtu |
Ranked #2,900 out of 11,835 Power Plants Nationwide | |
Ranked #492 out of 5,643 Solar Power Plants Nationwide | |
Ranked #51 out of 109 Nevada Power Plants | |
Ranked #25 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
AEP Renewables (2016 to 2022) Invenergy Services LLC (2023 to 2023) |
Map of Boulder Solar II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Boulder Solar II, LLC.
Monthly Net Generation for Boulder Solar II, LLC
Boulder Solar II, LLC Details
Summary Information | |
---|---|
Plant Name | Boulder Solar II, LLC (60885) |
Plant Address | 17445 South US HWY 95, Boulder City, NV 89005 |
Utility | Invenergy Services LLC (49893) |
Latitude, Longitude | 35.85, -114.944 |
Generation Dates on File | Jan 2017 to Aug 2024 |
Initial Operation Date | January 2017 |
Annual Generation | 124.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator BSII Details Operating January 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 62.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Boulder Solar II, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#482 | Hecate Energy Beacon Solar 1 | Cantil, CA | 129.0 GWh |
#483 | Prairie Creek FL | TBD, FL | 128.9 GWh |
#484 | Anhinga Solar Energy Center | Green Cove Springs, FL | 128.1 GWh |
#485 | Granite Mountain Solar West, LLC | Cedar City, UT | 127.8 GWh |
#486 | Luciana | Richgrove, CA | 127.6 GWh |
#487 | Hopkins Energy LLC | Dike, TX | 126.6 GWh |
#488 | Farmington Solar | Farmington, ME | 126.3 GWh |
#489 | BT Cooke Solar, LLC | Gainsville, TX | 126.0 GWh |
#490 | Scarlet Solar (CA) | Fresno, CA | 125.4 GWh |
#491 | Lithia Solar | Lithia, FL | 124.5 GWh |
#493 | TWE Bowman Solar Project | Bowman, SC | 124.4 GWh |
#494 | Solar Star Oregon II | Prineville, OR | 124.4 GWh |
#495 | Twin Lakes | Interlachen, FL | 123.6 GWh |
#496 | Midway Solar Farm 1 | Calipatria, CA | 123.1 GWh |
#497 | Oxbow Solar 1 | New Roads, LA | 122.7 GWh |
#498 | Appaloosa Solar I | Cedar City, UT | 122.6 GWh |
#499 | Horizon Solar Energy Center | Hawthorne, FL | 122.2 GWh |
#500 | Ellis Solar LLC | Midlothian, TX | 122.1 GWh |
#501 | Lamesa II | Lamesa, TX | 121.7 GWh |
#502 | Payne Creek Solar | Bowling Green, FL | 121.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Boulder Solar II, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CM10 | Boulder City, NV | 19.2 GWh | 5.1 mi |
CM48 | Boulder City, NV | 93.3 GWh | 5.5 mi |
Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh | 4.5 mi |
Copper Mountain Solar 3 | Boulder City, NV | 610.5 GWh | 2.8 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh | 5 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 685.2 GWh | 5.4 mi |
Desert Star Energy Center | Boulder City, NV | 1.2 TWh | 5.1 mi |
Dignity - Siena Campus | Henderson, NV | 2.9 GWh | 14.3 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.5 TWh | 16.2 mi |
Hoover Dam (NV) | Boulder City, NV | 1.4 TWh | 16.2 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 14 mi |
Nevada Solar One | Boulder City, NV | 94.1 GWh | 4.1 mi |
River Mountains Solar | Henderson, NV | 28.9 GWh | 12.6 mi |
Saguaro Power | Henderson, NV | 210.4 GWh | 13.8 mi |
Techren Solar I LLC | Boulder, NV | 196.8 GWh | 1.7 mi |
Techren Solar II LLC | Boulder, NV | 515.8 GWh | 1.4 mi |
Techren Solar III LLC | Boulder, NV | 59.4 GWh | 1.6 mi |
Techren Solar IV LLC | Boulder, NV | 58.5 GWh | 3 mi |
Techren Solar V | Boulder, NV | 118.5 GWh | 3.6 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 444.2 GWh | 6.9 mi |