17445 South US HWY 95, Boulder City, NV 89005Plant Summary Information
Boulder Solar II, LLC is ranked #26 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
Boulder Solar II, LLC generated 16.5 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Boulder Solar II, LLC |
---|---|
Utility Name | Invenergy Services LLC |
Location | Clark County, NV |
Initial Operation Date | January 2017 |
Last Update | Jan 2025 |
Annual Generation | 121.6 GWh |
Annual Consumption | 435.2 k MMBtu |
Ranked #3,001 out of 11,979 Power Plants Nationwide | |
Ranked #569 out of 5,765 Solar Power Plants Nationwide | |
Ranked #53 out of 109 Nevada Power Plants | |
Ranked #26 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
AEP Renewables (2016 to 2022) Invenergy Services LLC (2023 to 2023) |
Map of Boulder Solar II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Boulder Solar II, LLC.
Monthly Net Generation for Boulder Solar II, LLC
Boulder Solar II, LLC Details
Summary Information | |
---|---|
Plant Name | Boulder Solar II, LLC (60885) |
Plant Address | 17445 South US HWY 95, Boulder City, NV 89005 |
Utility | Invenergy Services LLC (49893) |
Latitude, Longitude | 35.85, -114.944 |
Generation Dates on File | Jan 2017 to Jan 2025 |
Initial Operation Date | January 2017 |
Annual Generation | 121.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator BSII Details Operating January 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 62.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Boulder Solar II, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#559 | Innovative Solar 42 | Fayetteville, NC | 124.4 GWh |
#560 | Elizabeth Solar Plant | Pitkin, LA | 123.9 GWh |
#561 | Lamesa II | Lamesa, TX | 123.5 GWh |
#562 | Caden Energix Axton LLC | Axton, VA | 123.4 GWh |
#563 | TWE Bowman Solar Project | Bowman, SC | 123.4 GWh |
#564 | Paddock Solar | Beloit, WI | 123.1 GWh |
#565 | Twin Lakes | Interlachen, FL | 122.6 GWh |
#566 | Desper Solar | Louisa, VA | 122.5 GWh |
#567 | Laurel Oaks Solar | Plant City, FL | 121.9 GWh |
#568 | Bedford Solar | Chesapeake, VA | 121.7 GWh |
#570 | Midway Solar Farm 1 | Calipatria, CA | 121.4 GWh |
#571 | Payne Creek Solar | Bowling Green, FL | 121.2 GWh |
#572 | Sweetbay Solar Center | North of Indiantown, FL | 120.5 GWh |
#573 | Warsaw Farm | Warsaw, NC | 120.3 GWh |
#574 | Alafia Solar | Mulberry, FL | 119.9 GWh |
#575 | Meridian III | Meridian, MS | 119.6 GWh |
#576 | Palmetto Plains | Bowman, SC | 119.4 GWh |
#577 | Little Bear 5 | Mendota, CA | 119.2 GWh |
#578 | Meherrin Solar | Skippers, VA | 119.2 GWh |
#579 | SolaireHolman Solar Project | Alpine, TX | 118.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Boulder Solar II, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CM10 | Boulder City, NV | 19.2 GWh | 5.1 mi |
CM48 | Boulder City, NV | 93.3 GWh | 5.5 mi |
Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh | 4.5 mi |
Copper Mountain Solar 3 | Boulder City, NV | 617.2 GWh | 2.8 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh | 5 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 682.9 GWh | 5.4 mi |
Desert Star Energy Center | Boulder City, NV | 811.4 GWh | 5.1 mi |
Dignity - Siena Campus | Henderson, NV | 2.9 GWh | 14.3 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.4 TWh | 16.2 mi |
Hoover Dam (NV) | Boulder City, NV | 1.6 TWh | 16.2 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 14 mi |
Nevada Solar One | Boulder City, NV | 92.6 GWh | 4.1 mi |
River Mountains Solar | Henderson, NV | 28.9 GWh | 12.6 mi |
Saguaro Power | Henderson, NV | 213.3 GWh | 13.8 mi |
Techren Solar I LLC | Boulder, NV | 200.4 GWh | 1.7 mi |
Techren Solar II LLC | Boulder, NV | 498.4 GWh | 1.4 mi |
Techren Solar III LLC | Boulder, NV | 60.3 GWh | 1.6 mi |
Techren Solar IV LLC | Boulder, NV | 58.2 GWh | 3 mi |
Techren Solar V | Boulder, NV | 117.3 GWh | 3.6 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 450.6 GWh | 6.9 mi |