Bosque County Peaking
PO Box 5436, Laquna Park, TX 76644Plant Summary Information
Bosque County Peaking is ranked #34 out of 769 power plants in Texas in terms of total annual net electricity generation.
Bosque County Peaking is comprised of 5 generators and generated 990.3 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Bosque County Peaking |
---|---|
Utility Name | Calpine Bosque Energy Center LLC |
Location | Bosque County, TX |
Initial Operation Date | July 2000 |
Last Update | Dec 2024 |
Annual Generation | 4.1 TWh |
Annual Consumption | 32.4 M MMBtu |
Ranked #280 out of 11,949 Power Plants Nationwide | |
Ranked #152 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #34 out of 769 Texas Power Plants | |
Ranked #23 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Bosque County Peaking
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bosque County Peaking.
Monthly Net Generation for Bosque County Peaking
Bosque County Peaking Details
Summary Information | |
---|---|
Plant Name | Bosque County Peaking (55172) |
Plant Address | PO Box 5436, Laquna Park, TX 76644 |
Utility | Calpine Bosque Energy Center LLC (55899) |
Latitude, Longitude | 31.8594, -97.3586 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | July 2000 |
Annual Generation | 4.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-235-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Brazos River |
Ash Impoundment | No |
Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
Grid Voltage | 345.00 kV / 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Other - Please explain in pipeline notes below. |
Pipeline Notes | Line owned and operated by Calpine Bosque Pipeline LLC. |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GT-1 Details Operating July 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G125 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | BOSQUESW_CC2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BOSQUESW_CC2 |
Nameplate Capacity | 154 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 158 MW |
Winter Capacity | 167 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT-2 Details Operating July 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G125 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | BOSQUESW_CC2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BOSQUESW_CC2 |
Nameplate Capacity | 154 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 158 MW |
Winter Capacity | 167 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT-3 Details Operating June 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G641 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | BOSQUESW_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BOSQUESW_CC1 |
Nameplate Capacity | 154 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 157 MW |
Winter Capacity | 166 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST-4 Details Operating June 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G641 |
Ownership | Single Owner |
Duct Burners | No |
RTO ISO LMP Node Designation | BOSQUESW_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BOSQUESW_CC1 |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 82 MW |
Winter Capacity | 84 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST-5 Details Operating January 2010
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G125 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | BOSQUESW_CC2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BOSQUESW_CC2 |
Nameplate Capacity | 250 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 208 MW |
Winter Capacity | 217 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Bosque County Peaking Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#142 | Buck | Salisbury, NC | 4.2 TWh |
#143 | ExxonMobil Beaumont Refinery | Beaumont, TX | 4.4 TWh |
#144 | Red Hawk | Arlington, AZ | 4.2 TWh |
#145 | Central Alabama Generating Station | Billingsley, AL | 4.2 TWh |
#146 | Cricket Valley Energy | Dover, NY | 4.2 TWh |
#147 | Fremont Energy Center | Fremont, OH | 4.2 TWh |
#148 | Astoria Energy | New York, NY | 4.2 TWh |
#149 | Rowan | Salisbury, NC | 4.2 TWh |
#150 | Cane Island | Intercession City, FL | 4.1 TWh |
#151 | John Sevier | Rogersville, TN | 4.1 TWh |
#153 | Dell Power Station | Dell, AR | 4.1 TWh |
#154 | Channel Energy Center LLC | Pasadena, TX | 4.5 TWh |
#155 | Sugar Creek Power | West Terre Haute, IN | 4.1 TWh |
#156 | Tracy | Sparks, NV | 4.1 TWh |
#157 | Allegheny Energy Units 3 4 & 5 | Springdale, PA | 4.0 TWh |
#158 | Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 3.9 TWh |
#159 | Pastoria Energy Facility, LLC | Lebec, CA | 4.0 TWh |
#160 | L V Sutton Combined Cycle | Wilmington, NC | 4.0 TWh |
#161 | Astoria Energy II | Astoria, NY | 4.0 TWh |
#162 | Lower Mount Bethel Energy | Bangor, PA | 4.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bosque County Peaking.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BPL Crown Solar LLC | Chilton, TX | 198.9 GWh | 39 mi |
BPL Files Solar | Itasca, TX | 280.1 GWh | 28 mi |
BPL Sol Solar LLC | Chilton, TX | 194.4 GWh | 39 mi |
Comanche Peak | Glen Rose, TX | 19.7 TWh | 39.3 mi |
Dileo Solar | Clifton, TX | 152.0 GWh | 10.4 mi |
Eddy II | Eddy, TX | 16.2 GWh | 39.7 mi |
Griffin Solar | Robinson, TX | 11.3 GWh | 29.5 mi |
Hubbard Wind | Mt Calm, TX | 983.0 GWh | 31.7 mi |
Johnson County | Cleburne, TX | 1.1 TWh | 37.4 mi |
Markum Solar Farm | Valley Mills, TX | 41.8 GWh | 11.4 mi |
Pitts Dudik Solar | Hubbard, TX | 106.5 GWh | 28.5 mi |
Prairie Hill Wind Project | Mart, TX | 194.0 GWh | 34.2 mi |
Sandy Creek Energy Station | Riesel, TX | 3.0 TWh | 35.6 mi |
Sun Valley Solar Project | Abbott, TX | 545.7 GWh | 20.2 mi |
TPE Whitney Solar, LLC | Kopperl, TX | 18.8 GWh | 13.2 mi |
Waco Solar | Mount Calm, TX | 779.1 GWh | 33.3 mi |
Walnut Springs Solar | Walnut Springs, TX | 10.9 GWh | 28.4 mi |
Whitney | Clifton, TX | 2.5 GWh | 0.8 mi |
Wolf Hollow I LP | Granbury, TX | 3.2 TWh | 39.4 mi |
Yellow Jacket | Meridian, TX | 10.5 GWh | 18.1 mi |