Borden Solar Farm
13282 Road 33, Madera, CA 9363Plant Summary Information
Borden Solar Farm is ranked #110 out of 806 solar farms in California in terms of total annual net electricity generation.
Borden Solar Farm generated 19.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Borden Solar Farm |
---|---|
Utility Name | 41MB 8me, LLC |
Location | Madera County, CA |
Initial Operation Date | June 2020 |
Last Update | Dec 2024 |
Annual Generation | 113.9 GWh |
Annual Consumption | 405.7 k MMBtu |
Ranked #3,074 out of 11,949 Power Plants Nationwide | |
Ranked #590 out of 5,739 Solar Power Plants Nationwide | |
Ranked #343 out of 1,577 California Power Plants | |
Ranked #110 out of 806 California Solar Power Plants | |
Fuel Types | Solar |
Map of Borden Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Borden Solar Farm.
Monthly Net Generation for Borden Solar Farm
Borden Solar Farm Details
Summary Information | |
---|---|
Plant Name | Borden Solar Farm (59531) |
Plant Address | 13282 Road 33, Madera, CA 9363 |
Utility | 41MB 8me, LLC (59272) |
Latitude, Longitude | 36.94111, -119.96 |
Generation Dates on File | May 2020 to Dec 2024 |
Initial Operation Date | June 2020 |
Annual Generation | 113.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG19-49-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator BRDN Details Operating June 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 67.8 MW |
Crystalline Silicon | No |
Other Materials | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Borden Solar Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#580 | CPV Stagecoach Solar | Andersonville, GA | 116.8 GWh |
#581 | Meherrin Solar | Skippers, VA | 116.7 GWh |
#582 | Northern Preserve Solar | Glen St. Mary, FL | 116.7 GWh |
#583 | Orion II Solar Project | Rosebud, TX | 116.5 GWh |
#584 | Little Bear 5 | Mendota, CA | 116.3 GWh |
#585 | Steel Solar LLC | Plymouth, UT | 116.2 GWh |
#586 | Antelope DSR 1 | Lancaster, CA | 115.6 GWh |
#587 | Macho Springs | Deming, NM | 115.5 GWh |
#588 | Hecate Energy Beacon Solar 4 | Cantil, CA | 115.5 GWh |
#589 | Skysol | Merrill, OR | 114.7 GWh |
#591 | Innovative Solar 37 LLC | Morven, NC | 113.7 GWh |
#592 | Horizon Solar Energy Center | Hawthorne, FL | 113.5 GWh |
#593 | BT Cooke Solar, LLC | Gainsville, TX | 112.4 GWh |
#594 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 112.1 GWh |
#595 | Silver State Solar Power North | Primm, NV | 112.1 GWh |
#596 | SEGS IX | Hinkley, CA | 112.0 GWh |
#597 | Landrace Holdings, LLC | Conway, SC | 112.0 GWh |
#598 | Ranchland Solar, LLC | Moyock, NC | 111.8 GWh |
#599 | Hawtree Solar | Warrenton, NC | 111.8 GWh |
#600 | Sandstone Solar | Florence, AZ | 111.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Borden Solar Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CA - Madera USD - Madera South HS | Madera, CA | 462.0 MWh | 5 mi |
City of Madera WWTP | Madera, CA | 1.9 GWh | 10.9 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 17.6 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 12.8 mi |
CSU Fresno Solar Project | Fresno, CA | 1.1 GWh | 15.1 mi |
DGS Central California Womens Facility | Chowchilla, CA | 3.2 GWh | 14.7 mi |
DGS Valley State Prison | Chowchilla, CA | 4.0 GWh | 15.4 mi |
Fresno Bullard High School Hybrid | Fresno, CA | 2.2 GWh | 11.8 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.1 GWh | 13.5 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh | 19.6 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 14.7 mi |
Madera 1 PV | Madera, CA | 2.7 GWh | 13.9 mi |
Madera Community Hospital | Madera, CA | 1.8 GWh | 4.8 mi |
OK Produce Fresno Carport | Fresno, CA | 3.1 GWh | 18.2 mi |
Pacific Ethanol Madera Solar Array | Madera, CA | 1.4 GWh | 1.8 mi |
Saint Agnes Medical Center | Fresno, CA | 25.0 GWh | 13 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 13.2 mi |
SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh | 15 mi |
Sealed Air Madera Solar Project | Madera, CA | 5.6 GWh | 5.3 mi |
Site 980 65 | Madera, CA | 6.3 GWh | 8.7 mi |