Borden Solar Farm

13282 Road 33, Madera, CA 9363

Plant Summary Information

Borden Solar Farm is ranked #110 out of 806 solar farms in California in terms of total annual net electricity generation.

Borden Solar Farm generated 19.5 GWh during the 3-month period between September 2024 to December 2024.

Plant NameBorden Solar Farm
Utility Name41MB 8me, LLC
LocationMadera County, CA
Initial Operation DateJune 2020
Last Update Dec 2024
Annual Generation 113.9 GWh
Annual Consumption 405.7 k MMBtu
Ranked #3,074 out of 11,949 Power Plants Nationwide
Ranked #590 out of 5,739 Solar Power Plants Nationwide
Ranked #343 out of 1,577 California Power Plants
Ranked #110 out of 806 California Solar Power Plants
Fuel Types Solar

Map of Borden Solar Farm

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Borden Solar Farm.

Create Your Account Today

Monthly Net Generation for Borden Solar Farm

20k20k16k16k12k12k8k8k4k4k00Jul '20Jul '2020212021Jul '21Jul '2120222022Jul '22Jul '2220232023Jul '23Jul '2320242024Jul '24Jul '24
Download SVG
Download PNG
Download CSV

Borden Solar Farm Details

Summary Information
Plant NameBorden Solar Farm (59531)
Plant Address13282 Road 33, Madera, CA 9363
Utility41MB 8me, LLC (59272)
Latitude, Longitude36.94111, -119.96
Generation Dates on FileMay 2020 to Dec 2024
Initial Operation DateJune 2020
Annual Generation 113.9 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket NumberEG19-49-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 69.00 kV
Energy StorageNo

Generator BRDN Details Operating June 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity50 MW
Summer Capacity50 MW
Winter Capacity50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity67.8 MW
Crystalline SiliconNo
Other MaterialsYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Borden Solar Farm Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#580CPV Stagecoach SolarAndersonville, GA116.8 GWh
#581Meherrin SolarSkippers, VA116.7 GWh
#582Northern Preserve SolarGlen St. Mary, FL116.7 GWh
#583Orion II Solar ProjectRosebud, TX116.5 GWh
#584Little Bear 5Mendota, CA116.3 GWh
#585Steel Solar LLCPlymouth, UT116.2 GWh
#586Antelope DSR 1Lancaster, CA115.6 GWh
#587Macho SpringsDeming, NM115.5 GWh
#588Hecate Energy Beacon Solar 4Cantil, CA115.5 GWh
#589SkysolMerrill, OR114.7 GWh
#591Innovative Solar 37 LLCMorven, NC113.7 GWh
#592Horizon Solar Energy CenterHawthorne, FL113.5 GWh
#593BT Cooke Solar, LLCGainsville, TX112.4 GWh
#594LA3 West Baton Rouge Solar FacilityWest Baton Rouge, LA112.1 GWh
#595Silver State Solar Power NorthPrimm, NV112.1 GWh
#596SEGS IXHinkley, CA112.0 GWh
#597Landrace Holdings, LLCConway, SC112.0 GWh
#598Ranchland Solar, LLCMoyock, NC111.8 GWh
#599Hawtree SolarWarrenton, NC111.8 GWh
#600Sandstone SolarFlorence, AZ111.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Borden Solar Farm.

Plant NamePlant LocationAnnual GenerationDistance
CA - Madera USD - Madera South HSMadera, CA462.0 MWh5 mi
City of Madera WWTPMadera, CA1.9 GWh10.9 mi
Clovis High SchoolClovis, CA1.3 GWh17.6 mi
Clovis North High SchoolFresno, CA1.4 GWh12.8 mi
CSU Fresno Solar ProjectFresno, CA1.1 GWh15.1 mi
DGS Central California Womens FacilityChowchilla, CA3.2 GWh14.7 mi
DGS Valley State PrisonChowchilla, CA4.0 GWh15.4 mi
Fresno Bullard High School HybridFresno, CA2.2 GWh11.8 mi
Fresno Hoover High School HybridFresno, CA2.1 GWh13.5 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh19.6 mi
Friant Hydro FacilityFriant, CA106.2 GWh14.7 mi
Madera 1 PVMadera, CA2.7 GWh13.9 mi
Madera Community HospitalMadera, CA1.8 GWh4.8 mi
OK Produce Fresno CarportFresno, CA3.1 GWh18.2 mi
Pacific Ethanol Madera Solar ArrayMadera, CA1.4 GWh1.8 mi
Saint Agnes Medical CenterFresno, CA25.0 GWh13 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh13.2 mi
SCCCD - Fresno Community CollegeFresno, CA3.8 GWh15 mi
Sealed Air Madera Solar ProjectMadera, CA5.6 GWh5.3 mi
Site 980 65Madera, CA6.3 GWh8.7 mi