Bonnie Mine Solar
2200 Bonnie Mine Rd, Bartow, FL 33830Plant Summary Information
Bonnie Mine Solar is ranked #103 out of 165 solar farms in Florida in terms of total annual net electricity generation.
Bonnie Mine Solar generated 15.5 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Bonnie Mine Solar |
---|---|
Utility Name | Tampa Electric Co |
Location | Polk County, FL |
Initial Operation Date | January 2019 |
Last Update | Mar 2024 |
Annual Generation | 58.6 GWh |
Annual Consumption | 199.9 k MMBtu |
Ranked #3,631 out of 11,249 Power Plants Nationwide | |
Ranked #634 out of 5,158 Solar Power Plants Nationwide | |
Ranked #184 out of 272 Florida Power Plants | |
Ranked #103 out of 165 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Bonnie Mine Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bonnie Mine Solar.
Monthly Net Generation for Bonnie Mine Solar
Bonnie Mine Solar Details
Summary Information | |
---|---|
Plant Name | Bonnie Mine Solar (61655) |
Plant Address | 2200 Bonnie Mine Rd Bartow, FL 33830 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.89008, -81.98717 |
Generation Dates on File | Jan 2019 to Mar 2024 |
Initial Operation Date | January 2019 |
Annual Generation | 58.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator PV1 Details Operating January 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 37.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 37.5 MW |
Winter Capacity | 37.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 43.9 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Bonnie Mine Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#624 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 57.9 GWh |
#625 | Madison Fields Solar Project, LLC | Irwin, OH | 60.0 GWh |
#626 | Fort Gordon Solar Facility | Fort Gordon, GA | 59.8 GWh |
#627 | Marine Corps Logistics Base Solar | Albany, GA | 59.5 GWh |
#628 | RE Rosamond One LLC | Rosamond, CA | 59.1 GWh |
#629 | Alta Luna | Deming, NM | 59.1 GWh |
#630 | Kings Bay Solar Facility | Kings Bay, GA | 58.9 GWh |
#631 | Kingbird A Solar LLC | Rosamond, CA | 58.8 GWh |
#632 | EE Waianae Solar Project | Waianae, HI | 58.8 GWh |
#633 | Sunray 2 | Daggett, CA | 58.7 GWh |
#635 | SEPV Mojave West | Mojave, CA | 58.4 GWh |
#636 | Gulf Coast Solar Center I | Valparaiso, FL | 58.0 GWh |
#637 | Mechanicsville Solar | Mechanicsville, VA | 57.8 GWh |
#638 | Caden Energix Hickory LLC | Chesapeake, VA | 57.8 GWh |
#639 | Apache Solar 1 | Cochise, AZ | 57.6 GWh |
#640 | Solar Oasis LLC | Palmdale, CA | 57.1 GWh |
#641 | Edwards Sanborn E3 | Mojave, CA | 54.6 GWh |
#642 | Whitney Point Solar | Five Points, CA | 56.6 GWh |
#643 | Fort Benning Solar Facility | Fort Benning, GA | 56.6 GWh |
#644 | Cascade Solar | Joshua Tree, CA | 56.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bonnie Mine Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 31.8 GWh | 11.8 mi |
Bartow Solar Energy LLC | Bartow, FL | 12.6 GWh | 10.6 mi |
C D McIntosh Jr | Lakeland, FL | 1.9 TWh | 13.7 mi |
Durrance | Mulberry, FL | 116.5 GWh | 7.6 mi |
Goldfinch | Lakeland, FL | 2.8 GWh | 7.2 mi |
Hines Energy Complex | Bartow, FL | 11.5 TWh | 10 mi |
Jamison Solar (FL) | Mulberry, FL | 137.7 GWh | 6.1 mi |
Lake Hancock Solar | Bartow, FL | 95.9 GWh | 12.2 mi |
Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.2 GWh | 7.7 mi |
Larsen Memorial | Lakeland, FL | 211.2 GWh | 11.6 mi |
Laurel Oaks Solar | Plant City, FL | 128.5 GWh | 5.5 mi |
LKL BLBD, LLC | Lakeland, FL | 10.5 GWh | 12.3 mi |
Magnolia Solar | Mulberry, FL | 145.3 GWh | 4.2 mi |
Mosaic Co Bartow Facility | Bartow, FL | 143.1 GWh | 4.4 mi |
Mosaic New Wales Operations | Mulberry, FL | 420.0 GWh | 5.6 mi |
Mosaic South Pierce Operations | Mulberry, FL | 173.7 GWh | 9.1 mi |
Mulberry Cogeneration Facility | Bartow, FL | 398.9 GWh | 7.3 mi |
Orange Cogeneration Facility | Bartow, FL | 405.9 GWh | 10 mi |
Peace Creek Solar | Bartow, FL | 100.3 GWh | 10.9 mi |
Polk | Mulberry, FL | 6.3 TWh | 11.2 mi |