Bonneville
ATTN: Project Office, Cascade Locks, OR 97014Plant Summary Information
Bonneville is ranked #11 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Bonneville is comprised of 20 generators and generated 638.9 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Bonneville |
---|---|
Utility Name | USACE Northwestern Division |
Location | Multnomah County, OR |
Initial Operation Date | July 1938 |
Last Update | Sep 2024 |
Annual Generation | 3.5 TWh |
Annual Consumption | 12.8 M MMBtu |
Ranked #328 out of 11,852 Power Plants Nationwide | |
Ranked #11 out of 1,371 Water Power Plants Nationwide | |
Ranked #6 out of 255 Oregon Power Plants | |
Ranked #4 out of 60 Oregon Water Power Plants | |
Fuel Types | Water |
Map of Bonneville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bonneville.
Monthly Net Generation for Bonneville
Bonneville Details
Summary Information | |
---|---|
Plant Name | Bonneville (3075) |
Plant Address | ATTN: Project Office, Cascade Locks, OR 97014 |
Utility | USACE Northwestern Division (19400) |
Latitude, Longitude | 45.6441, -121.94101 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | July 1938 |
Annual Generation | 3.5 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 230.00 kV / 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating July 1938
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 53.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1938 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 2 Details Operating August 1938
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 53.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1938 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 3 Details OA January 1941
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 62.1 MW |
Winter Capacity | 62.1 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | January 1941 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 5 Details Operating October 1941
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 62.1 MW |
Winter Capacity | 62.1 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1941 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 4 Details OA February 1941
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 62.1 MW |
Winter Capacity | 62.1 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | February 1941 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 6 Details Operating June 1942
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 62.1 MW |
Winter Capacity | 62.1 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1942 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 9 Details Operating October 1943
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 62.1 MW |
Winter Capacity | 62.1 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1943 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 7 Details Operating April 1943
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 62.1 MW |
Winter Capacity | 62.1 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1943 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 8 Details Operating July 1943
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 62.1 MW |
Winter Capacity | 62.1 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1943 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 10 Details Operating January 1944
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54 MW |
Winter Capacity | 54 MW |
Minimum Load | 13.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1944 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator F2 Details OA November 1981
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 13.1 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 13.1 MW |
Winter Capacity | 13.1 MW |
Minimum Load | 13.1 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | November 1981 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 16 Details Operating December 1981
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 66.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66.5 MW |
Winter Capacity | 66.5 MW |
Minimum Load | 23.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1981 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 18 Details Operating May 1981
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 66.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66.5 MW |
Winter Capacity | 66.5 MW |
Minimum Load | 23.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1981 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 17 Details Operating September 1981
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 66.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66.5 MW |
Winter Capacity | 66.5 MW |
Minimum Load | 23.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1981 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator F1 Details Operating January 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 13.1 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 13.1 MW |
Winter Capacity | 13.1 MW |
Minimum Load | 13.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1982 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 11 Details Operating October 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 66.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66.5 MW |
Winter Capacity | 66.5 MW |
Minimum Load | 23.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1982 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 12 Details Operating October 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 66.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66.5 MW |
Winter Capacity | 66.5 MW |
Minimum Load | 23.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1982 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 13 Details Operating October 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 66.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66.5 MW |
Winter Capacity | 66.5 MW |
Minimum Load | 23.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1982 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 15 Details Operating March 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 66.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66.5 MW |
Winter Capacity | 66.5 MW |
Minimum Load | 23.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1982 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 14 Details Operating June 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 66.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66.5 MW |
Winter Capacity | 66.5 MW |
Minimum Load | 23.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1982 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Bonneville Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#2 | Grand Coulee | Grand Coulee, WA | 15.0 TWh |
#3 | Chief Joseph | Bridgeport, WA | 9.0 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.5 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#8 | Wanapum | Beverly, WA | 4.0 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.8 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#21 | Conowingo | Darlington, MD | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bonneville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boring Solar LLC | Sandy, OR | 3.8 GWh | 22.2 mi |
Brightwood Solar, LLC | Sandy, OR | 15.8 GWh | 19.2 mi |
Copper Dam Plant | Hood River, OR | 15.6 GWh | 20.2 mi |
Dunn Road Solar | Sandy, OR | 3.1 GWh | 22.3 mi |
Duus Solar, LLC | Estacada, OR | 19.2 GWh | 29.4 mi |
Firwood Solar, LLC | Sandy, OR | 19.6 GWh | 25.2 mi |
Middle Fork Irrigation District | Parkdale, OR | 20.2 GWh | 20 mi |
NSE Astoria - Skyward | Boring, OR | 3.8 GWh | 22.6 mi |
Peters Drive Plant | Hood River, OR | 6.3 GWh | 19 mi |
PHP 1 | Sandy, OR | 40.2 GWh | 13.2 mi |
PHP 2 | Sandy, OR | 30.2 GWh | 16.9 mi |
River Mill | Estacada, OR | 83.8 GWh | 31 mi |
Sandy River Solar (CSG) | Sandy, OR | 2.9 GWh | 22.6 mi |
SSD Clackamas 1, LLC | Boring, OR | 6.5 GWh | 24.5 mi |
SulusSolar17 | Oregon City, OR | 4.2 GWh | 31.4 mi |
SulusSolar29 | Boring, OR | 3.8 GWh | 21.1 mi |
Swift 1 | Cougar, WA | 567.6 GWh | 31.4 mi |
Tickle Creek Solar | Sandy, OR | 3.1 GWh | 24.3 mi |
Timothy Lake Powerhouse | Estacada, OR | 946.0 MWh | 20.9 mi |
Yale | Amboy, WA | 516.9 GWh | 29.1 mi |