Boiling Springs Wind Farm
34127 South County Road 208, Woodward, OK 73801Plant Summary Information
Boiling Springs Wind Farm is ranked #42 out of 126 power plants in Oklahoma in terms of total annual net electricity generation.
Boiling Springs Wind Farm generated 140.8 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Boiling Springs Wind Farm |
---|---|
Utility Name | RWE Renewables Americas, LLC |
Location | Woodward County, OK |
Initial Operation Date | December 2020 |
Last Update | Oct 2024 |
Annual Generation | 614.1 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,078 out of 11,866 Power Plants Nationwide | |
Ranked #243 out of 1,345 Wind Power Plants Nationwide | |
Ranked #42 out of 126 Oklahoma Power Plants | |
Ranked #25 out of 67 Oklahoma Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
E ON Climate Renewables N America LLC (2018 to 2018) RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) |
Map of Boiling Springs Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Boiling Springs Wind Farm.
Monthly Net Generation for Boiling Springs Wind Farm
Boiling Springs Wind Farm Details
Summary Information | |
---|---|
Plant Name | Boiling Springs Wind Farm (62871) |
Plant Address | 34127 South County Road 208, Woodward, OK 73801 |
Utility | RWE Renewables Americas, LLC (56215) |
Latitude, Longitude | 36.54655, -99.3576 |
Generation Dates on File | Dec 2020 to Oct 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 614.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Western Farmers Elec Coop, Inc (20447) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator BGSPS Details Operating December 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 148.4 MW |
Summer Capacity | 148.4 MW |
Winter Capacity | 148.4 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 60 |
Turbine Details | |
Number Of Turbines | 60 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 18.9 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 295.2 |
Boiling Springs Wind Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#233 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 628.7 GWh |
#234 | Glacier Sands Wind Power, LLC | Mason City, IL | 624.6 GWh |
#235 | Headwaters Wind Farm LLC | Winchester, IN | 622.9 GWh |
#236 | Maple Ridge Wind Farm | Lowville, NY | 620.7 GWh |
#237 | Wild Horse | Ellensburg, WA | 620.8 GWh |
#238 | NaturEner Rim Rock Energy | Kevin, MT | 617.3 GWh |
#239 | Caddo Wind | Apache, OK | 617.1 GWh |
#240 | Brady Wind Energy Center | Dickinson, ND | 615.5 GWh |
#241 | Route 66 Wind Plant | Panhandle, TX | 614.8 GWh |
#242 | Clearwater Wind East | Miles City, MT | 614.7 GWh |
#244 | Clear Creek Wind | Maryville, MO | 612.9 GWh |
#245 | Solano Wind | Rio Vista, CA | 612.1 GWh |
#246 | Frontier Windpower II | Blackwell, OK | 610.8 GWh |
#247 | South Plains Wind Phase I | Floydada, TX | 610.2 GWh |
#248 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 609.5 GWh |
#249 | Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh |
#250 | Sweetwater Wind 4 LLC | Roscoe, TX | 606.1 GWh |
#251 | Golden Hill Wind | Wasco, OR | 604.1 GWh |
#252 | Tatanka Ridge | Toronto, SD | 603.3 GWh |
#253 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 602.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Boiling Springs Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
25 Mile Creek | Gage, OK | 1.1 TWh | 21.6 mi |
Ashland | Ashland, KS | 27.0 MWh | 50 mi |
Buffalo Bear LLC | Woodward, OK | 21.8 GWh | 22.1 mi |
Centennial Wind Farm | Fort Supply, OK | 164.2 GWh | 14.9 mi |
Cimarron Bend Wind Project II, LLC | Minneola, KS | 825.2 GWh | 65.9 mi |
Crossroads Wind Farm | Canton, OK | 331.6 GWh | 50 mi |
Great Western Wind Energy, LLC | Arnett, OK | 937.1 GWh | 29.4 mi |
Keenan II Renewable Energy Co LLC | Woodward, OK | 252.8 GWh | 20.1 mi |
Laverne Diesel Generating Plant | Laverne, OK | 283.0 MWh | 31.7 mi |
Mammoth Plains | Oakwood, OK | 739.8 GWh | 53.3 mi |
Mooreland | Mooreland, OK | 86.8 GWh | 10.5 mi |
Oklahoma Wind Energy Center | Woodward, OK | 153.0 GWh | 4.1 mi |
OU Spirit Wind Farm | Woodward, OK | 141.4 GWh | 16.2 mi |
Persimmon Creek Wind Farm 1, LLC | Vici, OK | 875.1 GWh | 25.7 mi |
Seiling Wind I | Seiling, OK | 720.3 GWh | 35.7 mi |
Seiling Wind II | Seiling, OK | 353.5 GWh | 35.7 mi |
Sleeping Bear LLC | Woodward, OK | 75.4 GWh | 10.2 mi |
Sundance Wind Project, LLC | Alva, OK | 630.8 GWh | 33.8 mi |
Taloga Wind LLC | Putnam, OK | 205.6 GWh | 52.4 mi |
Waynoka Gas Processing Plant | Alva, OK | 17.2 GWh | 33.6 mi |