Blythe Solar IV, LLC
4000 Dracker Drive, Blythe, CA 92225Plant Summary Information
Blythe Solar IV, LLC is ranked #46 out of 747 solar farms in California in terms of total annual net electricity generation.
Blythe Solar IV, LLC generated 55.0 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Blythe Solar IV, LLC |
---|---|
Utility Name | Blythe Solar IV, LLC |
Location | Riverside County, CA |
Initial Operation Date | November 2020 |
Last Update | Mar 2024 |
Annual Generation | 303.1 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,877 out of 11,249 Power Plants Nationwide | |
Ranked #139 out of 5,158 Solar Power Plants Nationwide | |
Ranked #166 out of 1,501 California Power Plants | |
Ranked #46 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Blythe Solar IV, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Solar IV, LLC.
Monthly Net Generation for Blythe Solar IV, LLC
Blythe Solar IV, LLC Details
Summary Information | |
---|---|
Plant Name | Blythe Solar IV, LLC (60095) |
Plant Address | 4000 Dracker Drive Blythe, CA 92225 |
Utility | Blythe Solar IV, LLC (59845) |
Latitude, Longitude | 33.682, -114.768 |
Generation Dates on File | Jul 2020 to Mar 2024 |
Initial Operation Date | November 2020 |
Annual Generation | 303.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator BLS4A Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 68.7 MW |
Summer Capacity | 68.7 MW |
Winter Capacity | 68.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 77 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLS4B Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 68.7 MW |
Summer Capacity | 68.7 MW |
Winter Capacity | 68.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 77 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Blythe Solar IV, LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#129 | Drew Solar LLC | Calexico, CA | 320.2 GWh |
#130 | Midway Solar - TX | Fort Stockton, TX | 320.1 GWh |
#131 | Springbok Solar Farm 1 | Cantil, CA | 319.0 GWh |
#132 | Panoche Valley Solar Farm | Paicines, CA | 315.9 GWh |
#133 | Upton County Solar | McCamey, TX | 314.5 GWh |
#134 | Lund Hill Solar | Bickleton, WA | 312.8 GWh |
#135 | Elara Solar | Pearsall, TX | 312.7 GWh |
#136 | Harry Allen Solar Energy LLC | Apex, NV | 312.4 GWh |
#137 | Bluebell Solar II | Sterling, TX | 311.7 GWh |
#138 | Emerald Grove | Crane, TX | 311.3 GWh |
#140 | Hudson - High Desert Hybrid | Victorville, CA | 303.4 GWh |
#141 | Buena Vista Energy Center | Chaparral, NM | 304.0 GWh |
#142 | Blythe Solar 110, LLC | Blythe, CA | 287.2 GWh |
#143 | Arlington Energy Center III | Blythe, CA | 290.3 GWh |
#144 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 293.3 GWh |
#145 | Hardin Solar Energy LLC | Alger, OH | 306.8 GWh |
#146 | Imperial Solar Energy Center South | Calexico, CA | 302.7 GWh |
#147 | American Kings Solar, LLC | Lemoore, CA | 300.2 GWh |
#148 | Nebula Solar | La Feria, TX | 299.3 GWh |
#149 | Wistaria Ranch Solar | Calexico, CA | 297.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Solar IV, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 43.2 GWh | 31.5 mi |
Arlington Energy Center II | Blythe, CA | 426.7 GWh | 0.7 mi |
Arlington Energy Center III | Blythe, CA | 290.3 GWh | 0.7 mi |
Blythe Energy Inc | Blythe, CA | 1.4 TWh | 6.6 mi |
Blythe Mesa Solar II | Blythe, CA | 604.9 GWh | 5.8 mi |
Blythe Solar 110, LLC | Blythe, CA | 287.2 GWh | 1.5 mi |
Blythe Solar II, LLC | Blythe, CA | 344.9 GWh | 2.2 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 334.9 GWh | 2.3 mi |
Chuckawalla Solar | Blythe, CA | 8.3 GWh | 11.7 mi |
Chuckawalla Valley State Prison | Blythe, CA | 544.1 MWh | 11.2 mi |
Genesis Solar Energy Project | Blythe, CA | 653.5 GWh | 13.3 mi |
Ironwood Solar LLC | Blythe, CA | 9.5 GWh | 11.8 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 669.5 GWh | 1.8 mi |
Palo Verde College | Blythe, CA | 2.1 GWh | 6.8 mi |
Solar Blythe 2 | Blythe, CA | 47.5 GWh | 6 mi |
Solar Blythe LLC | Blythe, CA | 43.7 GWh | 6.4 mi |
SunEdison Ironwood State Prison | Blythe, CA | 494.5 MWh | 11.7 mi |
Venable Solar 1 | Blythe, CA | 1.7 GWh | 12.7 mi |
Venable Solar 2 | Blythe, CA | 1.7 GWh | 12.7 mi |
Victory Pass | Desert Center, CA | 28.1 GWh | 31.5 mi |