Blythe Solar III, LLC Hybrid
4000 Dracker Drive, Blythe, CA 92225Plant Summary Information
Blythe Solar III, LLC Hybrid is ranked #38 out of 747 solar farms in California in terms of total annual net electricity generation.
Blythe Solar III, LLC Hybrid generated 83.5 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Blythe Solar III, LLC Hybrid |
---|---|
Utility Name | Blythe Solar III, LLC |
Location | Riverside County, CA |
Initial Operation Date | May 2020 |
Last Update | Mar 2024 |
Annual Generation | 334.9 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,774 out of 11,249 Power Plants Nationwide | |
Ranked #115 out of 5,158 Solar Power Plants Nationwide | |
Ranked #146 out of 1,501 California Power Plants | |
Ranked #38 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Blythe Solar III, LLC Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Solar III, LLC Hybrid.
Monthly Net Generation for Blythe Solar III, LLC Hybrid
Blythe Solar III, LLC Hybrid Details
Summary Information | |
---|---|
Plant Name | Blythe Solar III, LLC Hybrid (60094) |
Plant Address | 4000 Dracker Drive Blythe, CA 92225 |
Utility | Blythe Solar III, LLC (59844) |
Latitude, Longitude | 33.656, -114.742 |
Generation Dates on File | May 2020 to Mar 2024 |
Initial Operation Date | May 2020 |
Annual Generation | 334.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | Yes |
Generator BLSL3 Details Operating May 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 136.8 MW |
Summer Capacity | 136.8 MW |
Winter Capacity | 136.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 154 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLST3 Details Operating May 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 115 MW |
Summer Capacity | 115 MW |
Winter Capacity | 115 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 538.6 |
---|---|
Maximum Charge Rate | 115 MW |
Maximum Discharge Rate | 115 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 126.9 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Frequency Regulation | Yes |
Ramping Spinning Reserve | Yes |
Load Management | Yes |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | Yes |
Blythe Solar III, LLC Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#105 | Edwards Sanborn E1B | Mojave, CA | 355.0 GWh |
#106 | Maverick Solar 7, LLC | Desert Center, CA | 361.1 GWh |
#107 | Lily Solar Hybrid | Scurry, TX | 358.4 GWh |
#108 | Concho Valley Solar, LLC | San Angelo, TX | 359.0 GWh |
#109 | Oberon IA | Odessa, TX | 356.2 GWh |
#110 | Imperial Valley Solar, LLC | Calexico, CA | 354.8 GWh |
#111 | Blythe Solar II, LLC | Blythe, CA | 344.9 GWh |
#112 | Cove Mountain Solar 2 | Beryl, UT | 351.0 GWh |
#113 | Taygete II Energy Project | Coyanosa, TX | 350.3 GWh |
#114 | Calhoun Solar | Battle Creek, MI | 350.1 GWh |
#116 | Fort Powhatan Solar | Disputanta, VA | 345.2 GWh |
#117 | Edwards Sanborn E1A | Mojave, CA | 322.3 GWh |
#118 | Corazon Energy LLC | Rachito Las Lomas, TX | 338.7 GWh |
#119 | Maverick Solar, LLC | Desert Center, CA | 336.9 GWh |
#120 | Blue Jay Solar I, LLC | Iola, TX | 331.0 GWh |
#121 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 331.9 GWh |
#122 | Sonoran Solar Energy | Buckeye, AZ | 309.8 GWh |
#123 | CA Flats Solar 150, LLC | Shandon, CA | 328.9 GWh |
#124 | SR DeSoto I, LLC | DeSoto, GA | 326.6 GWh |
#125 | Edwards Sanborn E2 | Mojave, CA | 306.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Solar III, LLC Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 43.2 GWh | 33.2 mi |
Arlington Energy Center II | Blythe, CA | 426.7 GWh | 3.1 mi |
Arlington Energy Center III | Blythe, CA | 290.3 GWh | 3.1 mi |
Blythe Energy Inc | Blythe, CA | 1.4 TWh | 4.2 mi |
Blythe Mesa Solar II | Blythe, CA | 604.9 GWh | 3.7 mi |
Blythe Solar 110, LLC | Blythe, CA | 287.2 GWh | 1.7 mi |
Blythe Solar II, LLC | Blythe, CA | 344.9 GWh | 1.8 mi |
Blythe Solar IV, LLC | Blythe, CA | 303.1 GWh | 2.3 mi |
Chuckawalla Solar | Blythe, CA | 8.3 GWh | 11.8 mi |
Chuckawalla Valley State Prison | Blythe, CA | 544.1 MWh | 11.2 mi |
Genesis Solar Energy Project | Blythe, CA | 653.5 GWh | 14.7 mi |
Ironwood Solar LLC | Blythe, CA | 9.5 GWh | 11.9 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 669.5 GWh | 2.7 mi |
Palo Verde College | Blythe, CA | 2.1 GWh | 5.2 mi |
Solar Blythe 2 | Blythe, CA | 47.5 GWh | 3.7 mi |
Solar Blythe LLC | Blythe, CA | 43.7 GWh | 4.4 mi |
SunEdison Ironwood State Prison | Blythe, CA | 494.5 MWh | 11.8 mi |
Venable Solar 1 | Blythe, CA | 1.7 GWh | 10.6 mi |
Venable Solar 2 | Blythe, CA | 1.7 GWh | 10.6 mi |
Victory Pass | Desert Center, CA | 28.1 GWh | 33.2 mi |