Blythe Solar 110, LLC
4000 Dracker Drive, Blythe, CA 92225Plant Summary Information
Blythe Solar 110, LLC is ranked #37 out of 5,655 solar farms nationwide in terms of total annual net electricity generation.
Blythe Solar 110, LLC generated 109.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Blythe Solar 110, LLC |
---|---|
Utility Name | Blythe Solar 110, LLC |
Location | Riverside County, CA |
Initial Operation Date | March 2016 |
Last Update | Dec 2023 |
Annual Generation | 584.2 GWh |
Annual Consumption | 2.1 M MMBtu |
Ranked #1,122 out of 11,852 Power Plants Nationwide | |
Ranked #37 out of 5,655 Solar Power Plants Nationwide | |
Ranked #62 out of 1,570 California Power Plants | |
Ranked #14 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Blythe Solar 110, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Solar 110, LLC.
Monthly Net Generation for Blythe Solar 110, LLC
Blythe Solar 110, LLC Details
Summary Information | |
---|---|
Plant Name | Blythe Solar 110, LLC (60093) |
Plant Address | 4000 Dracker Drive, Blythe, CA 92225 |
Utility | Blythe Solar 110, LLC (59842) |
Latitude, Longitude | 33.68, -114.742 |
Generation Dates on File | Mar 2016 to Dec 2023 |
Initial Operation Date | March 2016 |
Annual Generation | 584.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | Yes |
Generator BLCK1 Details Operating March 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 38.7 MW |
Summer Capacity | 38.7 MW |
Winter Capacity | 38.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 54 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLCK2 Details Operating April 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 36.3 MW |
Summer Capacity | 36.3 MW |
Winter Capacity | 36.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 51 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLCK3 Details Operating April 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 34.8 MW |
Summer Capacity | 34.8 MW |
Winter Capacity | 34.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 49 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BES1 Details Operating June 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 63 MW |
Summer Capacity | 63 MW |
Winter Capacity | 63 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 301.2 |
---|---|
Maximum Charge Rate | 63 MW |
Maximum Discharge Rate | 63 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 68.6 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Frequency Regulation | P |
Ramping Spinning Reserve | Yes |
Load Management | Yes |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Blythe Solar 110, LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#27 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#28 | Stateline Solar | Nipton, CA | 618.5 GWh |
#29 | Arrow Canyon Solar Hybrid | Moapa, NV | 607.5 GWh |
#30 | Copper Mountain Solar 3 | Boulder City, NV | 615.4 GWh |
#31 | Moapa Southern Paiute | Moapa, NV | 615.1 GWh |
#32 | Genesis Solar Energy Project | Blythe, CA | 613.8 GWh |
#33 | Mount Signal Solar Farm V | Calexico, CA | 610.3 GWh |
#34 | McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh |
#35 | Five Wells Solar Center - Hybrid | Rogers, TX | 603.3 GWh |
#36 | Bighorn Solar 1 | Pueblo, CO | 598.5 GWh |
#38 | Athos Solar Project | Desert Center, CA | 593.2 GWh |
#39 | Titan Solar Project | Van Horn, TX | 591.6 GWh |
#40 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 569.1 GWh |
#41 | Waco Solar | Mount Calm, TX | 580.3 GWh |
#42 | Noble Solar | Krum, TX | 575.6 GWh |
#43 | Oberon II Solar Project | Desert Center, CA | 558.0 GWh |
#44 | Lumina Solar Project | Snyder, TX | 573.9 GWh |
#45 | AV Solar Ranch One | Lancaster, CA | 571.8 GWh |
#46 | Blythe Mesa Solar II | Blythe, CA | 544.2 GWh |
#47 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 555.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Solar 110, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 461.5 GWh | 33 mi |
Arlington Energy Center II | Blythe, CA | 628.1 GWh | 2 mi |
Arlington Energy Center III | Blythe, CA | 266.5 GWh | 2 mi |
Blythe Energy Inc | Blythe, CA | 1.0 TWh | 5.5 mi |
Blythe Mesa Solar II | Blythe, CA | 544.2 GWh | 4.5 mi |
Blythe Solar II, LLC | Blythe, CA | 331.9 GWh | 0.7 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 346.5 GWh | 1.7 mi |
Blythe Solar IV, LLC | Blythe, CA | 302.6 GWh | 1.5 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 12.7 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 12.2 mi |
Genesis Solar Energy Project | Blythe, CA | 613.8 GWh | 14.8 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 12.9 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh | 1 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 5.3 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 5 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 6.1 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 12.8 mi |
Venable Solar 1 | Blythe, CA | 3.4 GWh | 11.3 mi |
Venable Solar 2 | Blythe, CA | 3.4 GWh | 11.3 mi |
Victory Pass | Desert Center, CA | 352.9 GWh | 33 mi |