Blythe Mesa Solar II
16489 Mesa Drive, Blythe, CA 92225Plant Summary Information
Blythe Mesa Solar II is ranked #43 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
Blythe Mesa Solar II generated 205.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Blythe Mesa Solar II |
---|---|
Utility Name | Blythe Mesa Solar II, LLC |
Location | Riverside County, CA |
Initial Operation Date | December 2022 |
Last Update | Aug 2024 |
Annual Generation | 541.3 GWh |
Annual Consumption | 2.1 M MMBtu |
Ranked #1,205 out of 11,835 Power Plants Nationwide | |
Ranked #43 out of 5,643 Solar Power Plants Nationwide | |
Ranked #71 out of 1,569 California Power Plants | |
Ranked #18 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Blythe Mesa Solar II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Mesa Solar II.
Monthly Net Generation for Blythe Mesa Solar II
Blythe Mesa Solar II Details
Summary Information | |
---|---|
Plant Name | Blythe Mesa Solar II (65053) |
Plant Address | 16489 Mesa Drive, Blythe, CA 92225 |
Utility | Blythe Mesa Solar II, LLC (64459) |
Latitude, Longitude | 33.64081, -114.68026 |
Generation Dates on File | Dec 2022 to Aug 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 541.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 21-164-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | Yes |
Generator BMSES Details Operating December 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CENTPD_2_BMSX2-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CENTPD_2_BMSX2 |
Nameplate Capacity | 112 MW |
Summer Capacity | 112 MW |
Winter Capacity | 112 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 448 |
---|---|
Maximum Charge Rate | 112 MW |
Maximum Discharge Rate | 112 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 36.8 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Co Located Renewable Firming | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 65053 |
Direct Support Gen Id | IPBMS |
Support T D Asset | No |
Generator IPBMS Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CENTPD_2_BMSSX2-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CENTPD_2_BMSSX2 |
Nameplate Capacity | 223.6 MW |
Summer Capacity | 223.6 MW |
Winter Capacity | 223.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 309.7 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Blythe Mesa Solar II Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#33 | Mount Signal Solar Farm V | Calexico, CA | 608.6 GWh |
#34 | Moapa Southern Paiute | Moapa, NV | 604.0 GWh |
#35 | Bighorn Solar 1 | Pueblo, CO | 600.1 GWh |
#36 | Titan Solar Project | Van Horn, TX | 597.8 GWh |
#37 | Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh |
#38 | Athos Solar Project | Desert Center, CA | 593.4 GWh |
#39 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 567.6 GWh |
#40 | Noble Solar | Krum, TX | 575.6 GWh |
#41 | AV Solar Ranch One | Lancaster, CA | 576.3 GWh |
#42 | Oberon II Solar Project | Desert Center, CA | 549.7 GWh |
#44 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 555.3 GWh |
#45 | Oberon Solar Project | Desert Center, CA | 534.1 GWh |
#46 | Dodge Flat | Reno, NV | 540.8 GWh |
#47 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#48 | Five Wells Solar Center - Hybrid | Rogers, TX | 537.3 GWh |
#49 | Sun Valley Solar Project | Abbott, TX | 534.9 GWh |
#50 | ENGIE Long Draw Solar LLC | Gail, TX | 526.1 GWh |
#51 | Phoebe Solar | Kermit, TX | 518.7 GWh |
#52 | Techren Solar II LLC | Boulder, NV | 515.8 GWh |
#53 | Golden Field Solar III, LLC | Rosamond, CA | 509.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Mesa Solar II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 387.7 GWh | 36.8 mi |
Arlington Energy Center II | Blythe, CA | 596.9 GWh | 6.5 mi |
Arlington Energy Center III | Blythe, CA | 263.6 GWh | 6.5 mi |
Blythe Energy Inc | Blythe, CA | 1.1 TWh | 1.8 mi |
Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh | 4.5 mi |
Blythe Solar II, LLC | Blythe, CA | 329.3 GWh | 3.9 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 340.1 GWh | 3.7 mi |
Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh | 5.8 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 14.6 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 13.9 mi |
Genesis Solar Energy Project | Blythe, CA | 609.1 GWh | 18.4 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 14.7 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh | 5.1 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 2.2 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 1.8 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 5 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 14.6 mi |
Venable Solar 1 | Blythe, CA | 3.4 GWh | 6.9 mi |
Venable Solar 2 | Blythe, CA | 3.4 GWh | 6.9 mi |
Victory Pass | Desert Center, CA | 296.2 GWh | 36.8 mi |