Blythe Mesa Solar II
16489 Mesa Drive, Blythe, CA 92225Plant Summary Information
Blythe Mesa Solar II is ranked #48 out of 5,778 solar farms nationwide in terms of total annual net electricity generation.
Blythe Mesa Solar II generated 99.6 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Blythe Mesa Solar II |
---|---|
Utility Name | Blythe Mesa Solar II, LLC |
Location | Riverside County, CA |
Initial Operation Date | December 2022 |
Last Update | Feb 2025 |
Annual Generation | 563.5 GWh |
Annual Consumption | 2.1 M MMBtu |
Ranked #1,185 out of 11,993 Power Plants Nationwide | |
Ranked #48 out of 5,778 Solar Power Plants Nationwide | |
Ranked #68 out of 1,579 California Power Plants | |
Ranked #19 out of 808 California Solar Power Plants | |
Fuel Types | Solar |
Map of Blythe Mesa Solar II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Mesa Solar II.
Monthly Net Generation for Blythe Mesa Solar II
Blythe Mesa Solar II Details
Summary Information | |
---|---|
Plant Name | Blythe Mesa Solar II (65053) |
Plant Address | 16489 Mesa Drive, Blythe, CA 92225 |
Utility | Blythe Mesa Solar II, LLC (64459) |
Latitude, Longitude | 33.64081, -114.68026 |
Generation Dates on File | Dec 2022 to Feb 2025 |
Initial Operation Date | December 2022 |
Annual Generation | 563.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 21-164-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | Yes |
Generator BMSES Details Operating December 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CENTPD_2_BMSX2-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CENTPD_2_BMSX2 |
Nameplate Capacity | 112 MW |
Summer Capacity | 112 MW |
Winter Capacity | 112 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 448 |
---|---|
Maximum Charge Rate | 112 MW |
Maximum Discharge Rate | 112 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 36.8 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Co Located Renewable Firming | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 65053 |
Direct Support Gen Id | IPBMS |
Support T D Asset | No |
Generator IPBMS Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CENTPD_2_BMSSX2-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CENTPD_2_BMSSX2 |
Nameplate Capacity | 223.6 MW |
Summer Capacity | 223.6 MW |
Winter Capacity | 223.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 309.7 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Blythe Mesa Solar II Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#38 | Agua Caliente Solar Project | Dateland, AZ | 626.0 GWh |
#39 | Copper Mountain Solar 3 | Boulder City, NV | 624.0 GWh |
#40 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#41 | Stateline Solar | Nipton, CA | 618.5 GWh |
#42 | Mount Signal Solar Farm V | Calexico, CA | 617.9 GWh |
#43 | McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh |
#44 | Oberon II Solar Project | Desert Center, CA | 585.5 GWh |
#45 | Titan Solar Project | Van Horn, TX | 600.5 GWh |
#46 | Bighorn Solar 1 | Pueblo, CO | 595.2 GWh |
#47 | Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh |
#49 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 561.2 GWh |
#50 | RE Maplewood | McCamey, TX | 577.1 GWh |
#51 | AV Solar Ranch One | Lancaster, CA | 573.5 GWh |
#52 | Oberon Solar Project | Desert Center, CA | 547.1 GWh |
#53 | Dodge Flat | Reno, NV | 556.8 GWh |
#54 | Victory Pass | Desert Center, CA | 554.6 GWh |
#55 | Texas Solar Nova 2 | Spur, TX | 558.6 GWh |
#56 | Eiffel Solar Project | Paris, TX | 558.1 GWh |
#57 | Daggett 2 | Daggett, CA | 539.0 GWh |
#58 | Golden Field Solar III, LLC | Rosamond, CA | 538.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Mesa Solar II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 641.8 GWh | 36.8 mi |
Arlington Energy Center II | Blythe, CA | 640.7 GWh | 6.5 mi |
Arlington Energy Center III | Blythe, CA | 283.8 GWh | 6.5 mi |
Blythe Energy Inc | Blythe, CA | 581.0 GWh | 1.8 mi |
Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh | 4.5 mi |
Blythe Solar II, LLC | Blythe, CA | 336.7 GWh | 3.9 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 349.0 GWh | 3.7 mi |
Blythe Solar IV, LLC | Blythe, CA | 304.4 GWh | 5.8 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 14.6 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 13.9 mi |
Desert Quartzite | Blythe, CA | 175.1 GWh | 6.7 mi |
Genesis Solar Energy Project | Blythe, CA | 645.4 GWh | 18.4 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 14.7 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh | 5.1 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 2.2 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 1.8 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 5 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 14.6 mi |
Venable Solar 1 | Blythe, CA | 3.4 GWh | 6.9 mi |
Venable Solar 2 | Blythe, CA | 3.4 GWh | 6.9 mi |