Bluebell Solar
533 Bird Lane, Sterling City, TX 76951Plant Summary Information
Bluebell Solar is ranked #110 out of 178 solar farms in Texas in terms of total annual net electricity generation.
Bluebell Solar generated 15.2 GWh during the 3-month period between August 2024 to November 2024.
Plant Name | Bluebell Solar |
---|---|
Utility Name | Bluebell Solar, LLC |
Location | Sterling County, TX |
Initial Operation Date | November 2018 |
Last Update | Nov 2024 |
Annual Generation | 70.3 GWh |
Annual Consumption | 254.8 k MMBtu |
Ranked #3,575 out of 11,949 Power Plants Nationwide | |
Ranked #733 out of 5,739 Solar Power Plants Nationwide | |
Ranked #487 out of 769 Texas Power Plants | |
Ranked #110 out of 178 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Bluebell Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bluebell Solar.
Monthly Net Generation for Bluebell Solar
Bluebell Solar Details
Summary Information | |
---|---|
Plant Name | Bluebell Solar (60789) |
Plant Address | 533 Bird Lane, Sterling City, TX 76951 |
Utility | Bluebell Solar, LLC (60476) |
Latitude, Longitude | 31.87, -100.828 |
Generation Dates on File | Nov 2018 to Nov 2024 |
Initial Operation Date | November 2018 |
Annual Generation | 70.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 34.00 kV |
Energy Storage | No |
Generator UNIT1 Details Operating November 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 30 MW |
Summer Capacity | 30 MW |
Winter Capacity | 30 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 35.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Bluebell Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#723 | Edwards Sanborn S4 | Mojave, CA | 72.4 GWh |
#724 | Roadrunner Solar | Santa Teresa, NM | 72.6 GWh |
#725 | SJA Solar LLC-Solterra Monastery CSG | Spencer, MA | 72.5 GWh |
#726 | Hoot Lake Solar | Fergus Falls, MN | 72.3 GWh |
#727 | San Luis Valley Solar Ranch | Mosca, CO | 71.8 GWh |
#728 | Alpaugh 50 | Alpaugh, CA | 71.7 GWh |
#729 | Eland Solar & Storage Center, Phase 1 Hybrid | Mojave, CA | 68.3 GWh |
#730 | Peony Solar | Springfield, SC | 71.1 GWh |
#731 | Lake Placid Solar Power Plant | Lake Placid, FL | 70.7 GWh |
#732 | Avalon Solar | Pima, AZ | 70.9 GWh |
#734 | SR Bell Buckle | Shelbyville, TN | 69.5 GWh |
#735 | Robin Hollow Solar | West Greenwich, RI | 68.7 GWh |
#736 | Central 40 | Newman, CA | 68.5 GWh |
#737 | Stampede Solar Hybrid | Saltillo, TX | 67.5 GWh |
#738 | Chaves County Solar II | Roswell, NM | 68.3 GWh |
#739 | New Market Solar | Sardinia, OH | 68.2 GWh |
#740 | Brittlebush Solar | Coolidge, AZ | 68.0 GWh |
#741 | Moody Air Force Base Solar | Valdosta, GA | 68.0 GWh |
#742 | Caprock Solar 1 LLC | San Jon, NM | 67.8 GWh |
#743 | High River Energy Center, LLC | Florida, NY | 67.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bluebell Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aviator Wind | Robert Lee, TX | 1.8 TWh | 9.4 mi |
Bluebell Solar II | Sterling, TX | 266.1 GWh | 1.3 mi |
Capricorn Ridge Wind LLC | Sterling City, TX | 2.0 TWh | 12.5 mi |
Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh | 38 mi |
Elbow Creek Wind Project LLC | Forsan, TX | 390.7 GWh | 38.3 mi |
Forest Creek Wind Farm LLC | Big Springs, TX | 225.4 GWh | 25.8 mi |
Goat Wind LP | Sterling City, TX | 245.7 GWh | 6.1 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 14.8 mi |
Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh | 29.3 mi |
Loraine Windpark Project LLC | Loraine, TX | 329.5 GWh | 39.5 mi |
Maryneal Windpower | Maryneal, TX | 570.1 GWh | 30.1 mi |
Morgan Creek | Colorado City, TX | 73.6 GWh | 32.6 mi |
Ocotillo Windpower | Forsan, TX | 18.4 GWh | 37 mi |
Panther Creek Wind Farm II | Big Spring, TX | 391.1 GWh | 28 mi |
Panther Creek Wind Farm Three | Big Spring, TX | 699.7 GWh | 18.9 mi |
Rambler | San Angelo, TX | 439.9 GWh | 27.8 mi |
Sand Bluff Wind Farm | Big Spring, TX | 313.3 GWh | 29.1 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 37.6 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 621.9 GWh | 35.2 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 32.4 mi |