Bluebell Solar II
1460 Mendenhall Ln, Sterling, TX 76951Plant Summary Information
Bluebell Solar II is ranked #63 out of 181 solar farms in Texas in terms of total annual net electricity generation.
Bluebell Solar II generated 46.7 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Bluebell Solar II |
---|---|
Utility Name | Bluebell Solar II, LLC |
Location | Sterling County, TX |
Initial Operation Date | December 2020 |
Last Update | Jan 2025 |
Annual Generation | 266.1 GWh |
Annual Consumption | 958.8 k MMBtu |
Ranked #2,015 out of 11,979 Power Plants Nationwide | |
Ranked #213 out of 5,765 Solar Power Plants Nationwide | |
Ranked #366 out of 774 Texas Power Plants | |
Ranked #63 out of 181 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Bluebell Solar II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bluebell Solar II.
Monthly Net Generation for Bluebell Solar II
Bluebell Solar II Details
Summary Information | |
---|---|
Plant Name | Bluebell Solar II (63351) |
Plant Address | 1460 Mendenhall Ln, Sterling, TX 76951 |
Utility | Bluebell Solar II, LLC (63116) |
Latitude, Longitude | 31.888, -100.825 |
Generation Dates on File | Nov 2020 to Jan 2025 |
Initial Operation Date | December 2020 |
Annual Generation | 266.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator BBS2 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 115 MW |
Summer Capacity | 115 MW |
Winter Capacity | 115 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 150 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Bluebell Solar II Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#203 | ANSON Solar Center, LLC | Anson, TX | 276.2 GWh |
#204 | Wood County | Nekoosa, WI | 276.1 GWh |
#205 | Boulder Solar Power, LLC | Boulder City, NV | 273.7 GWh |
#206 | Central Line Solar, LLC | Coolidge, AZ | 273.3 GWh |
#207 | Saint Solar | Coolidge, AZ | 271.5 GWh |
#208 | Bellflower Solar 1 | Lewisville, IN | 271.3 GWh |
#209 | Oberon IA | Odessa, TX | 271.0 GWh |
#210 | Hunter Solar LLC (UT) | Clawson, UT | 270.8 GWh |
#211 | East Blackland Solar Project 1 | Manor, TX | 267.2 GWh |
#212 | Yellow Pine II | Enterprise, NV | 257.4 GWh |
#214 | Orion III Solar Project | Buckholts, TX | 265.7 GWh |
#215 | Dougherty County Solar, LLC | Albany, GA | 263.5 GWh |
#216 | Elm Branch Solar 1 | Bardwell, TX | 263.2 GWh |
#217 | Ivanpah 2 | Nipton, CA | 275.1 GWh |
#218 | Ivanpah 3 | Nipton, CA | 274.7 GWh |
#219 | Sunshine Valley Solar | Armagosa, NV | 262.8 GWh |
#220 | Catalina Solar LLC | Rosamond, CA | 262.7 GWh |
#221 | South Cheyenne Solar | South Greeley, WY | 259.9 GWh |
#222 | Jackpot Solar, LLC | Twin Falls, ID | 259.2 GWh |
#223 | Rabbitbrush Solar, LLC | Rosamond, CA | 256.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bluebell Solar II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angelo Solar | TX | 32.1 GWh | 29.8 mi |
Aviator Wind | Robert Lee, TX | 1.8 TWh | 10 mi |
Bluebell Solar | Sterling City, TX | 66.1 GWh | 1.3 mi |
Capricorn Ridge Wind LLC | Sterling City, TX | 2.0 TWh | 12.2 mi |
Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh | 36.7 mi |
Elbow Creek Wind Project LLC | Forsan, TX | 390.7 GWh | 37.9 mi |
Forest Creek Wind Farm LLC | Big Springs, TX | 225.4 GWh | 25.4 mi |
Goat Wind LP | Sterling City, TX | 245.7 GWh | 4.8 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 13.7 mi |
Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh | 29.9 mi |
Maryneal Windpower | Maryneal, TX | 568.0 GWh | 29 mi |
Morgan Creek | Colorado City, TX | 73.6 GWh | 31.4 mi |
Ocotillo Windpower | Forsan, TX | 18.4 GWh | 36.6 mi |
Panther Creek Wind Farm II | Big Spring, TX | 391.1 GWh | 28 mi |
Panther Creek Wind Farm Three | Big Spring, TX | 699.7 GWh | 18.6 mi |
Rambler | San Angelo, TX | 440.9 GWh | 28.8 mi |
Sand Bluff Wind Farm | Big Spring, TX | 313.3 GWh | 28.9 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 36.5 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 627.6 GWh | 34 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 31.3 mi |