Bluebell Solar II
1460 Mendenhall Ln, Sterling, TX 76951Plant Summary Information
Bluebell Solar II is ranked #61 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Bluebell Solar II generated 89.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Bluebell Solar II |
---|---|
Utility Name | Bluebell Solar II, LLC |
Location | Sterling County, TX |
Initial Operation Date | December 2020 |
Last Update | Aug 2024 |
Annual Generation | 267.0 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #1,967 out of 11,835 Power Plants Nationwide | |
Ranked #192 out of 5,643 Solar Power Plants Nationwide | |
Ranked #360 out of 749 Texas Power Plants | |
Ranked #61 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Bluebell Solar II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bluebell Solar II.
Monthly Net Generation for Bluebell Solar II
Bluebell Solar II Details
Summary Information | |
---|---|
Plant Name | Bluebell Solar II (63351) |
Plant Address | 1460 Mendenhall Ln, Sterling, TX 76951 |
Utility | Bluebell Solar II, LLC (63116) |
Latitude, Longitude | 31.888, -100.825 |
Generation Dates on File | Nov 2020 to Aug 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 267.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator BBS2 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 115 MW |
Summer Capacity | 115 MW |
Winter Capacity | 115 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 150 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Bluebell Solar II Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#182 | Oberon IA | Odessa, TX | 276.9 GWh |
#183 | Battle Mountain Solar Project | Battle Mountain, NV | 274.5 GWh |
#184 | Madison Fields Solar Project, LLC | Irwin, OH | 274.4 GWh |
#185 | Sparta Solar | Pawnee, TX | 273.5 GWh |
#186 | Maverick Solar 6, LLC | Desert Center, CA | 268.2 GWh |
#187 | Dougherty County Solar, LLC | Albany, GA | 270.3 GWh |
#188 | Edwards Sanborn E4 | Mojave, CA | 263.0 GWh |
#189 | Hunter Solar LLC (UT) | Clawson, UT | 268.9 GWh |
#190 | Boulder Solar Power, LLC | Boulder City, NV | 268.2 GWh |
#191 | Jackpot Solar, LLC | Twin Falls, ID | 267.1 GWh |
#193 | West Line Solar, LLC | City of Eloy, AZ | 266.5 GWh |
#194 | San Pablo Raceway | Lancaster, CA | 266.3 GWh |
#195 | Catalina Solar LLC | Rosamond, CA | 262.7 GWh |
#196 | Ivanpah 3 | Nipton, CA | 270.0 GWh |
#197 | Wood County | Nekoosa, WI | 261.0 GWh |
#198 | Milford Solar 1 | Milford, UT | 260.4 GWh |
#199 | East Pecos Solar | McCamey, TX | 259.2 GWh |
#200 | Rabbitbrush Solar, LLC | Rosamond, CA | 256.6 GWh |
#201 | Bellflower Solar 1 | Lewisville, IN | 258.9 GWh |
#202 | Ivanpah 2 | Nipton, CA | 268.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bluebell Solar II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aviator Wind | Robert Lee, TX | 1.8 TWh | 10 mi |
Bluebell Solar | Sterling City, TX | 72.0 GWh | 1.3 mi |
Capricorn Ridge Wind LLC | Sterling City, TX | 2.0 TWh | 12.2 mi |
Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh | 36.7 mi |
Elbow Creek Wind Project LLC | Forsan, TX | 390.7 GWh | 37.9 mi |
Forest Creek Wind Farm LLC | Big Springs, TX | 225.4 GWh | 25.4 mi |
Goat Wind LP | Sterling City, TX | 245.7 GWh | 4.8 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 13.7 mi |
Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh | 29.9 mi |
Loraine Windpark Project LLC | Loraine, TX | 329.5 GWh | 38.3 mi |
Maryneal Windpower | Maryneal, TX | 556.5 GWh | 29 mi |
Morgan Creek | Colorado City, TX | 73.6 GWh | 31.4 mi |
Ocotillo Windpower | Forsan, TX | 18.4 GWh | 36.6 mi |
Panther Creek Wind Farm II | Big Spring, TX | 391.1 GWh | 28 mi |
Panther Creek Wind Farm Three | Big Spring, TX | 699.7 GWh | 18.6 mi |
Rambler | San Angelo, TX | 441.1 GWh | 28.8 mi |
Sand Bluff Wind Farm | Big Spring, TX | 313.3 GWh | 28.9 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 36.5 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 609.9 GWh | 34 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 31.3 mi |