Blue Sky Green Field Wind Project
Highway W and Johnsburg Road, Fond du Lac, WI 54935Plant Summary Information
Blue Sky Green Field Wind Project is ranked #21 out of 216 power plants in Wisconsin in terms of total annual net electricity generation.
Blue Sky Green Field Wind Project generated 45.9 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Blue Sky Green Field Wind Project |
---|---|
Utility Name | Wisconsin Electric Power Co |
Location | Fond du Lac County, WI |
Initial Operation Date | May 2008 |
Last Update | Aug 2024 |
Annual Generation | 319.3 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,762 out of 11,835 Power Plants Nationwide | |
Ranked #529 out of 1,343 Wind Power Plants Nationwide | |
Ranked #21 out of 216 Wisconsin Power Plants | |
Ranked #3 out of 13 Wisconsin Wind Power Plants | |
Fuel Types | Wind |
Map of Blue Sky Green Field Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blue Sky Green Field Wind Project.
Monthly Net Generation for Blue Sky Green Field Wind Project
Blue Sky Green Field Wind Project Details
Summary Information | |
---|---|
Plant Name | Blue Sky Green Field Wind Project (56391) |
Plant Address | Highway W and Johnsburg Road, Fond du Lac, WI 54935 |
Utility | Wisconsin Electric Power Co (20847) |
Latitude, Longitude | 43.8794, -88.2708 |
Generation Dates on File | May 2008 to Aug 2024 |
Initial Operation Date | May 2008 |
Annual Generation | 319.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | American Transmission Co (659) WI |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating May 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.BLUSKYGF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.BLUSKYGF |
Nameplate Capacity | 145.2 MW |
Summer Capacity | 145.2 MW |
Winter Capacity | 145.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 88 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 88 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V82-1.65 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 213.2 |
Blue Sky Green Field Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#519 | Duran Mesa LLC | Duran, NM | 328.5 GWh |
#520 | Prairie Winds ND1 | Minot, ND | 328.2 GWh |
#521 | Benton County Wind Farm | Earl Park, IN | 327.5 GWh |
#522 | Grand Meadow | Dexter, MN | 325.9 GWh |
#523 | Palmas Wind, LLC | Rio Hondo, TX | 324.6 GWh |
#524 | Baffin Wind | Sarita, TX | 323.5 GWh |
#525 | Macksburg Wind Project | Macksburg, IA | 322.3 GWh |
#526 | Settlers Trail Wind Farm LLC | Sheldon, IL | 321.4 GWh |
#527 | Penascal Wind Power LLC | Sarita, TX | 320.3 GWh |
#528 | Bennington Wind | Minonk, IL | 319.5 GWh |
#530 | Campbell County Wind Farm | Pollock, SD | 318.8 GWh |
#531 | Shady Oaks Wind Farm | Compton, IL | 318.8 GWh |
#532 | Goshen Phase II | Idaho Falls, ID | 316.8 GWh |
#533 | Stoneray Power Partners, LLC | Woodstock, MN | 316.6 GWh |
#534 | Oakfield Wind Project | City of Oakfield, ME | 316.5 GWh |
#535 | Anacacho Wind Farm, LLC | Brackettville, TX | 316.4 GWh |
#536 | Black Rock Wind | Elk Garden, WV | 316.2 GWh |
#537 | Mower County Wind Energy Center | Grand Meadow, MN | 316.0 GWh |
#538 | Glenrock | Glenrock, WY | 314.1 GWh |
#539 | Sand Bluff Wind Farm | Big Spring, TX | 313.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blue Sky Green Field Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alliant Energy Neenah | Neenah, WI | 610.1 GWh | 24.7 mi |
Appleton | Appleton, WI | 5.5 GWh | 26.8 mi |
Cedar Ridge | Eden, WI | 161.3 GWh | 13.2 mi |
Combined Locks | Combined Locks, WI | 39.0 GWh | 27.3 mi |
Combined Locks Energy Center | Combined Locks, WI | 376.3 GWh | 27.1 mi |
ENGIE 2020 ProjectCo-WI1 LLC | Fond Du Lac, WI | 3.4 GWh | 14.2 mi |
Forward Wind Energy Center | Brownsville, WI | 141.3 GWh | 21.4 mi |
Island Street Peaking Plant | Kaukauna, WI | 8.0 GWh | 27.4 mi |
Kaukauna City Hydro | Kaukauna, WI | 28.3 GWh | 27.4 mi |
Kaukauna Gas Turbine | Kaukauna, WI | 741.0 MWh | 27.4 mi |
Kaukauna Paper Mill | Kaukauna, WI | 122.8 GWh | 27.9 mi |
Kimberly Mill | Appleton, WI | 12.3 GWh | 27.6 mi |
Kohler Solar | Kohler, WI | 3.0 GWh | 26.8 mi |
Little Chute | Combined Locks, WI | 20.4 GWh | 27.7 mi |
New Badger | Kaukauna, WI | 46.0 GWh | 27.5 mi |
Onion River | Sheboygan Cedar Grove, WI | 147.5 GWh | 26.9 mi |
Sheboygan Falls | Sheboygan, WI | 546.5 GWh | 21.5 mi |
South Fond Du Lac | Fond du Lac, WI | 14.5 GWh | 15 mi |
Springfield Solar (WI) | Lomira, WI | 138.8 GWh | 20.9 mi |
Winnebago County Landfill Gas | Oshkosh, WI | 11.4 GWh | 19.5 mi |