Blue Lake
1200 70th St, Shakopee, MN 55379Plant Summary Information
Blue Lake is ranked #15 out of 52 natural gas power plants in Minnesota in terms of total annual net electricity generation.
Blue Lake is comprised of 6 generators and generated 15.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Blue Lake |
---|---|
Utility Name | Northern States Power Co - Minnesota |
Location | Scott County, MN |
Initial Operation Date | March 1974 |
Last Update | Dec 2023 |
Annual Generation | 63.1 GWh |
Annual Consumption | 849.0 k MMBtu |
Ranked #3,634 out of 11,835 Power Plants Nationwide | |
Ranked #1,024 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #73 out of 736 Minnesota Power Plants | |
Ranked #15 out of 52 Minnesota Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Blue Lake
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blue Lake.
Monthly Net Generation for Blue Lake
Blue Lake Details
Summary Information | |
---|---|
Plant Name | Blue Lake (8027) |
Plant Address | 1200 70th St, Shakopee, MN 55379 |
Utility | Northern States Power Co - Minnesota (13781) |
Latitude, Longitude | 44.7855, -93.4315 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | March 1974 |
Annual Generation | 63.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | NORTHERN STATES PWR CO |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 1 Details Operating March 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP BLUE_LK BLUE_L_1_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP BLUE_LK BLUE_L_1_UNIT |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 36 MW |
Winter Capacity | 46 MW |
Minimum Load | 19 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1974 |
---|---|
Planned Retirement | December 2025 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating March 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP BLUE_LK BLUE_L_2_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP BLUE_LK BLUE_L_2_UNIT |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 36 MW |
Winter Capacity | 46 MW |
Minimum Load | 19 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1974 |
---|---|
Planned Retirement | December 2025 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating March 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP BLUE_LK BLUE_L_3_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP BLUE_LK BLUE_L_3_UNIT |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 36 MW |
Winter Capacity | 46 MW |
Minimum Load | 19 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1974 |
---|---|
Planned Retirement | December 2025 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating April 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP BLUE_LK BLUE_L_4_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP BLUE_LK BLUE_L_4_UNIT |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 39 MW |
Winter Capacity | 54 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1974 |
---|---|
Planned Retirement | December 2025 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating June 2005
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP BLUE_LK BLUE_L_7_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP BLUE_LK BLUE_L_7_UNIT |
Nameplate Capacity | 166.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 174 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating June 2005
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP BLUE_LK BLUE_L_8_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP BLUE_LK BLUE_L_8_UNIT |
Nameplate Capacity | 166.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 177 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Blue Lake Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1014 | The Andersons Albion Ethanol LLC | Albion, MI | 65.7 GWh |
#1015 | Cumberland (NJ) | Millville, NJ | 65.6 GWh |
#1016 | 491 E 48th Street | Holland, MI | 65.3 GWh |
#1017 | International Paper Pensacola | Cantonment, FL | 336.2 GWh |
#1018 | Sikorsky Aircraft CHP | Stratford, CT | 64.3 GWh |
#1019 | Boulder Park | Spokane, WA | 63.9 GWh |
#1020 | CityCenter Central Plant Cogen Units | Las Vegas, NV | 63.8 GWh |
#1021 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 181.3 GWh |
#1022 | Gallatin (TN) | Gallatin, TN | 3.6 TWh |
#1023 | Four Corners | Fruitland, NM | 8.0 TWh |
#1025 | Bayswater Peaking Facility LLC | Far Rockaway, NY | 62.9 GWh |
#1026 | Tilton | Tilton, IL | 62.7 GWh |
#1027 | Phelps Dodge Refining | El Paso, TX | 62.5 GWh |
#1028 | Oxbow Creek | Factoryville, PA | 62.4 GWh |
#1029 | Gillette SBMC | Boston, MA | 61.0 GWh |
#1030 | General Chemical | Green River, WY | 220.4 GWh |
#1031 | Powerlane Plant | Greenville, TX | 62.4 GWh |
#1032 | Roundtop | Meshoppen, PA | 60.3 GWh |
#1033 | Doyle Energy Facility | Monroe, GA | 60.1 GWh |
#1034 | Worthington Generation LLC | Worthington, IN | 58.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blue Lake.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Black Dog | Burnsville, MN | 1.8 TWh | 9.1 mi |
Blue Lake Solar | Shakopee, MN | 4.4 GWh | 0.8 mi |
Covanta Hennepin Energy | Minneapolis, MN | 201.8 GWh | 15.5 mi |
Hennepin Island | Minneapolis, MN | 43.4 GWh | 16.1 mi |
Koda Biomass Plant | Shakopee, MN | 43.2 GWh | 5.3 mi |
Minnesota River | Chaska, MN | 7.4 GWh | 7.4 mi |
MSC-Empire01, LLC | Farmington, MN | 235.8 MWh | 17.3 mi |
MSC-Scott01 LLC | Jordan, MN | 2.0 GWh | 8.8 mi |
SAF Hydroelectric LLC | Minneapolis, MN | 28.7 GWh | 16.1 mi |
Schultz CSG | Webster, MN | 3.0 GWh | 16 mi |
Shakopee Energy Park | Shakopee, MN | 25.2 GWh | 2.4 mi |
Shakopee Met Council WTP | Shakopee, MN | 2.0 GWh | 0.8 mi |
St. Paul Intl Airport Red & Blue Parking | St. Paul, MN | 2.9 GWh | 12.7 mi |
Thomson Reuters Campus Bldg A-D | Eagan, MN | 99.0 MWh | 15.7 mi |
Thomson Reuters Data Center Bldg ES101 | Eagan, MN | 9.0 MWh | 15.8 mi |
Thomson Reuters Data Center Bldg H | Eagan, MN | 65.0 MWh | 15.7 mi |
Twin Cities Hydro LLC | St. Paul, MN | 71.6 GWh | 14.5 mi |
Univ Minnesota CHP Plant | Minneapolis, MN | 173.9 GWh | 16.3 mi |
West Group Data Center | Eagan, MN | 71.0 MWh | 15.8 mi |
West Group Data Center F | Eagan, MN | 61.0 MWh | 15.7 mi |