Blue Cypress Solar Energy Center
9799 4th Street, Vero Beach, FL 32966Plant Summary Information
Blue Cypress Solar Energy Center is ranked #55 out of 171 solar farms in Florida in terms of total annual net electricity generation.
Blue Cypress Solar Energy Center generated 31.4 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Blue Cypress Solar Energy Center |
---|---|
Utility Name | Florida Power & Light Co |
Location | Indian River County, FL |
Initial Operation Date | March 2018 |
Last Update | Sep 2024 |
Annual Generation | 138.1 GWh |
Annual Consumption | 510.4 k MMBtu |
Ranked #2,778 out of 11,852 Power Plants Nationwide | |
Ranked #446 out of 5,655 Solar Power Plants Nationwide | |
Ranked #126 out of 279 Florida Power Plants | |
Ranked #55 out of 171 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Blue Cypress Solar Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blue Cypress Solar Energy Center.
Monthly Net Generation for Blue Cypress Solar Energy Center
Blue Cypress Solar Energy Center Details
Summary Information | |
---|---|
Plant Name | Blue Cypress Solar Energy Center (61029) |
Plant Address | 9799 4th Street, Vero Beach, FL 32966 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 27.60946, -80.53719 |
Generation Dates on File | Jan 2018 to Sep 2024 |
Initial Operation Date | March 2018 |
Annual Generation | 138.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating March 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.5 MW |
Summer Capacity | 74.5 MW |
Winter Capacity | 74.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 195 |
Tilt Angle | 20 |
DC Net Capacity | 113.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Blue Cypress Solar Energy Center Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#436 | Bay Trail Solar Power Plant | Crystal River, FL | 139.5 GWh |
#437 | Golden Fields Solar I, LLC | Rosamond, CA | 139.5 GWh |
#438 | Gray Hawk Solar | Kingman, AZ | 139.5 GWh |
#439 | Route 66 Energy Center, LLC | San Fidel, NM | 139.4 GWh |
#440 | Crooked Run | Willard, NC | 139.3 GWh |
#441 | Babcock Preserve | Punta Gorda, FL | 138.8 GWh |
#442 | Cattle Ranch | Arcadia, FL | 138.6 GWh |
#443 | Sawgrass Solar Energy Center | Clewiston, FL | 138.4 GWh |
#444 | Hammock Solar | Labelle, FL | 138.4 GWh |
#445 | OE_MS6 | St.Artesia, MS | 136.1 GWh |
#447 | Great Bay Solar 1 | Princess Anne, MD | 138.1 GWh |
#448 | NMRD Data Center III, LLC | Rio Ranchero, NM | 138.0 GWh |
#449 | Lakeside Solar Center | Okeechobee, FL | 138.0 GWh |
#450 | Interstate Solar Energy Center | Ft. Pierce, FL | 137.5 GWh |
#451 | Citrus Solar Energy Center Hybrid | Arcadia, FL | 136.9 GWh |
#452 | Magnolia Solar | Mulberry, FL | 137.0 GWh |
#453 | Barefoot Bay Solar Energy Center | Sebastian, FL | 136.6 GWh |
#454 | Gulf Power Blue Indigo Energy | Cottondale, FL | 136.5 GWh |
#455 | Trenton Solar Power Plant | Trenton, FL | 136.3 GWh |
#456 | Sage Solar I-III | Randolph, UT | 136.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blue Cypress Solar Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barefoot Bay Solar Energy Center | Sebastian, FL | 136.6 GWh | 17.7 mi |
Bluefield Preserve Solar | Okeechobee, FL | 149.0 GWh | 26.6 mi |
Fort Drum Energy Center | Vero Beach, FL | 116.6 GWh | 13.5 mi |
FPL Cavendish Solar Energy Center | Okeechobee, FL | 132.6 GWh | 16.4 mi |
Grove | Vero Beach, FL | 146.7 GWh | 7.3 mi |
Ibis | Palm Bay, FL | 112.9 GWh | 19.1 mi |
Indian River Solar Center | Vero Beach, FL | 143.7 GWh | 3.5 mi |
Interstate Solar Energy Center | Ft. Pierce, FL | 137.5 GWh | 9.6 mi |
Loggerhead Solar Energy Center | Port St. Lucie, FL | 133.7 GWh | 25.7 mi |
Okeechobee Clean Energy Center | Okeechobee, FL | 11.3 TWh | 15.6 mi |
Okeechobee Solar | Vero Beach, FL | 154.0 GWh | 15.8 mi |
Orange Blossom Solar Center | Vero Beach, FL | 149.4 GWh | 2.2 mi |
Palm Bay Solar | Palm Bay, FL | 142.0 GWh | 17.1 mi |
Pelican Solar Center | Ft. Pierce, FL | 152.3 GWh | 6.1 mi |
Pineapple | Port St Lucie, FL | 124.3 GWh | 24.6 mi |
Pink Trial Solar Energy Center | Port St. Lucie, FL | 150.3 GWh | 21.5 mi |
St Lucie | Jensen Beach, FL | 15.0 TWh | 25.3 mi |
Sundew | Port St Lucie, FL | 147.7 GWh | 23.9 mi |
Treasure Coast Energy Center | Ft. Pierce, FL | 1.9 TWh | 18.4 mi |
Turnpike | Vero Beach, FL | 132.5 GWh | 7.2 mi |