Blackburn Landfill Co-Generation
4017 Rockyford Road, Newton, NC 28658Plant Summary Information
Blackburn Landfill Co-Generation is ranked #16 out of 18 landfill gas power plants in North Carolina in terms of total annual net electricity generation.
Blackburn Landfill Co-Generation is comprised of 3 generators and generated 1.8 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Blackburn Landfill Co-Generation |
---|---|
Utility Name | Catawba County |
Location | Catawba County, NC |
Initial Operation Date | September 1999 |
Last Update | Dec 2022 |
Annual Generation | 6.7 GWh |
Annual Consumption | 126.0 k MMBtu |
Ranked #6,925 out of 11,249 Power Plants Nationwide | |
Ranked #258 out of 297 Landfill Gas Power Plants Nationwide | |
Ranked #623 out of 858 North Carolina Power Plants | |
Ranked #16 out of 18 North Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Blackburn Landfill Co-Generation
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blackburn Landfill Co-Generation.
Monthly Net Generation for Blackburn Landfill Co-Generation
Blackburn Landfill Co-Generation Details
Summary Information | |
---|---|
Plant Name | Blackburn Landfill Co-Generation (55488) |
Plant Address | 4017 Rockyford Road Newton, NC 28658 |
Utility | Catawba County (3057) |
Latitude, Longitude | 35.6067, -81.3006 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | September 1999 |
Annual Generation | 6.7 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 99-112-001; '02-112-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator BB2 Details Operating December 1999
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ISO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ISO |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1999 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BB1 Details Operating September 1999
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ISO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ISO |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1999 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator BB3 Details Operating March 2002
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ISO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ISO |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2002 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Blackburn Landfill Co-Generation Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#248 | MM Tulare Energy | Visalia, CA | 8.8 GWh |
#249 | Enoree Phase II Landfill Gas Recovery | Greer, SC | 8.7 GWh |
#250 | Frederick County LFGTE Facility | Winchester, VA | 8.7 GWh |
#251 | Roseburg LFG | Roseburg, OR | 8.3 GWh |
#252 | Ameresco Janesville | Janesville, WI | 8.1 GWh |
#253 | Morehead Generating Facility | Morehead, KY | 7.7 GWh |
#254 | Henrico | Glen Allen, VA | 7.9 GWh |
#255 | Grand River | Grand Ledge, MI | 7.4 GWh |
#256 | Waste Management Northern Oaks LFGTE | Harrison, MI | 7.0 GWh |
#257 | Moretown | Waterbury, VT | 6.8 GWh |
#259 | COC Surry LFG, LLC | Mount Airy, NC | 6.3 GWh |
#260 | New Milford Gas Recovery | New Milford, CT | 6.2 GWh |
#261 | Morgantown | Morgantown, PA | 6.2 GWh |
#262 | Horry Land Fill Gas Site | Conway, SC | 6.0 GWh |
#263 | Bristol Plant | Bristol, VA | 6.1 GWh |
#264 | GRS CMS | Concord, NC | 5.4 GWh |
#265 | SECCRA Community Landfill | West Grove, PA | 5.3 GWh |
#266 | POET Biorefining - Chancellor | Chancellor, SD | 34.5 GWh |
#267 | MCLB Landfill Gas to Energy | Albany, GA | 5.7 GWh |
#268 | North City - Landfill Gas Engine North | San Diego, CA | 4.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blackburn Landfill Co-Generation.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angel Solar | Newton, NC | 8.9 GWh | 6 mi |
Apple Data Center - PV2 | Conover, NC | 41.5 GWh | 10.5 mi |
Apple Data Center PV | Maiden, NC | 41.6 GWh | 3 mi |
Apple Data Center PV3 | Conover, NC | 37.7 GWh | 11.3 mi |
Apple One | Newton, NC | 10.3 GWh | 8.2 mi |
Arndt Farm | Claremont, NC | 9.7 GWh | 13.8 mi |
Cline Solar Farm, LLC | Hildebran, NC | 8.5 GWh | 10.2 mi |
Dragstrip Farm | Hickory, NC | 9.5 GWh | 12.3 mi |
Flash Solar | Conover, NC | 8.9 GWh | 11.2 mi |
Granite Falls Walmart | Granite Falls, NC | 21.8 MWh | 13.1 mi |
Haynes Farm | Lincolnton, NC | 8.7 GWh | 6.7 mi |
Innovative Solar 26, LLC | Hildebran, NC | 3.6 GWh | 9.5 mi |
Lincolnton High School | Lincolnton, NC | 9.4 MWh | 9.2 mi |
Maiden Community Center | Maiden, NC | 42.1 MWh | 5.6 mi |
Maiden Creek Solar Power Plant | Maiden, NC | 147.1 GWh | 7.6 mi |
Old Catawba PV 1 | Claremont, NC | 6.3 GWh | 11.8 mi |
Owen Solar | Lincolnton, NC | 7.1 GWh | 1.6 mi |
Sigmon Catawba Farm | Newton, NC | 9.4 GWh | 3.2 mi |
Sonne Two | Newton, NC | 9.9 GWh | 7.4 mi |
Two Lines Farm | Hickory, NC | 9.7 GWh | 2.1 mi |