Black Mountain Solar LLC
7025 S Yuma Road, Golden Valley, AZ 86413Plant Summary Information
Black Mountain Solar LLC is ranked #59 out of 102 solar farms in Arizona in terms of total annual net electricity generation.
Black Mountain Solar LLC generated 3.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Black Mountain Solar LLC |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Mohave County, AZ |
Initial Operation Date | December 2012 |
Last Update | Dec 2023 |
Annual Generation | 20.3 GWh |
Annual Consumption | 72.5 k MMBtu |
Ranked #5,040 out of 11,835 Power Plants Nationwide | |
Ranked #1,171 out of 5,643 Solar Power Plants Nationwide | |
Ranked #106 out of 155 Arizona Power Plants | |
Ranked #59 out of 102 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Black Mountain Solar LLC (2013 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Black Mountain Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Black Mountain Solar LLC.
Monthly Net Generation for Black Mountain Solar LLC
Black Mountain Solar LLC Details
Summary Information | |
---|---|
Plant Name | Black Mountain Solar LLC (58042) |
Plant Address | 7025 S Yuma Road, Golden Valley, AZ 86413 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 35.0227, -114.1627 |
Generation Dates on File | Dec 2012 to Dec 2023 |
Initial Operation Date | December 2012 |
Annual Generation | 20.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 13,24,000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Arizona Public Service Company (AZPS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | UNS Electric, Inc (19728) AZ |
Grid Voltage | 20.50 kV |
Energy Storage | No |
Generator 1 Details Operating December 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 9 MW |
Summer Capacity | 9 MW |
Winter Capacity | 9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 10 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Black Mountain Solar LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1161 | Leon Solar | Greenville, TX | 20.8 GWh |
#1162 | Vale Air Solar Center, LLC | Vale, OR | 20.8 GWh |
#1163 | Hertford Solar Power, LLC | Ahoskie, NC | 20.7 GWh |
#1164 | TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh |
#1165 | Suntex Solar, LLC | Riley, OR | 20.7 GWh |
#1166 | Pleasant Hill Solar | Suffolk, VA | 20.7 GWh |
#1167 | Fort Valley State University Solar | Fort Valley, GA | 20.6 GWh |
#1168 | Fort Detrick Solar PV | Frederick, MD | 20.6 GWh |
#1169 | Paynesville Solar | Paynesville, MN | 20.5 GWh |
#1170 | Duane Arnold Solar I (50 MW) | Palo, IA | 20.3 GWh |
#1172 | West Gates Solar Station | Huron, CA | 20.2 GWh |
#1173 | SR Washington I, LLC | Jonesborough, TN | 20.2 GWh |
#1174 | Whitewright Solar | Whitewright, TX | 20.2 GWh |
#1175 | Clear Spring Ranch PV Project | Fountain, CO | 20.2 GWh |
#1176 | Aspiration G | Cantua Creek, CA | 20.1 GWh |
#1177 | Gaston Solar I - SC | Gaston, SC | 20.1 GWh |
#1178 | Adams Solar Center | Madras, OR | 20.1 GWh |
#1179 | SR Camden | Camden, AR | 20.0 GWh |
#1180 | Turkey Creek PV1 | Kirby, NC | 20.0 GWh |
#1181 | Marin Clean Energy Solar One | Richmond, CA | 19.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Black Mountain Solar LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Black Mountain Generating Station | Golden Valley, AZ | 94.9 GWh | 0.9 mi |
Boulder Solar Power, LLC | Boulder City, NV | 268.2 GWh | 50.8 mi |
Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh | 69.4 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh | 69.6 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 685.2 GWh | 69.3 mi |
Davis Dam | Kingman, AZ | 908.9 GWh | 26 mi |
Gray Hawk Solar | Kingman, AZ | 138.8 GWh | 27.9 mi |
Griffith Energy LLC | Golden Valley, AZ | 3.6 TWh | 2.7 mi |
Headgate Rock | Parker, AZ | 32.3 GWh | 59.4 mi |
Jacobson 5 MW Solar | Kingman, AZ | 8.3 GWh | 21.3 mi |
Kingman 1 | Kingman, AZ | 14.5 GWh | 10.1 mi |
La Senita | Kingman, AZ | 931.0 MWh | 17.6 mi |
Mohave County Wind Farm | Willow Beach, AZ | 990.8 GWh | 56.5 mi |
Mohave Electric at Fort Mohave | Fort Mohave, AZ | 8.2 GWh | 22.4 mi |
Mohave Electric Cooperative at Joy Lane | Fort Mohave, AZ | 17.1 GWh | 22.4 mi |
Mohave Energy - Hybrid | Fort Mohave, AZ | 27.8 GWh | 21.9 mi |
Parker Dam | Parker, CA | 379.9 GWh | 50.3 mi |
RE Bagdad Solar I LLC | Bagdad, AZ | 31.7 GWh | 63.5 mi |
Searchlight Solar | Searchlight, NV | 42.6 GWh | 53.9 mi |
South Point Energy Center | Mohave Valley, AZ | 2.8 TWh | 23.5 mi |