Bison 4 Wind Energy Center
5198 30th St., New Salem, ND 58563Plant Summary Information
Bison 4 Wind Energy Center is ranked #16 out of 56 power plants in North Dakota in terms of total annual net electricity generation.
Bison 4 Wind Energy Center generated 176.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Bison 4 Wind Energy Center |
---|---|
Utility Name | ALLETE, Inc. |
Location | Morton County, ND |
Initial Operation Date | January 2015 |
Last Update | Dec 2023 |
Annual Generation | 608.4 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,084 out of 11,852 Power Plants Nationwide | |
Ranked #246 out of 1,345 Wind Power Plants Nationwide | |
Ranked #16 out of 56 North Dakota Power Plants | |
Ranked #8 out of 39 North Dakota Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Minnesota Power Inc (2013 to 2013) ALLETE, Inc. (2014 to 2023) |
Map of Bison 4 Wind Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bison 4 Wind Energy Center.
Monthly Net Generation for Bison 4 Wind Energy Center
Bison 4 Wind Energy Center Details
Summary Information | |
---|---|
Plant Name | Bison 4 Wind Energy Center (58872) |
Plant Address | 5198 30th St., New Salem, ND 58563 |
Utility | ALLETE, Inc. (12647) |
Latitude, Longitude | 46.98, -101.55472 |
Generation Dates on File | Jan 2015 to Dec 2023 |
Initial Operation Date | January 2015 |
Annual Generation | 608.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | ALLETE, Inc. (12647) MN |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator BISO4 Details Operating January 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MP.BISON1 MP.BISON5 |
Nameplate Capacity | 205 MW |
Summer Capacity | 201.8 MW |
Winter Capacity | 201.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2015 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 63 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 63 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-3.2-113 |
Design Wind Speed | 20.1 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 303.5 |
Bison 4 Wind Energy Center Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#236 | Brady Wind Energy Center | Dickinson, ND | 615.5 GWh |
#237 | Route 66 Wind Plant | Panhandle, TX | 614.8 GWh |
#238 | Gopher Creek Wind Farm | Fluvanna, TX | 613.9 GWh |
#239 | Logans Gap Wind LLC | Comanche, TX | 613.6 GWh |
#240 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 613.0 GWh |
#241 | Maple Ridge Wind Farm | Lowville, NY | 612.7 GWh |
#242 | Raymond Wind Farm, LLC | Lyford, TX | 611.8 GWh |
#243 | Boiling Springs Wind Farm | Woodward, OK | 610.5 GWh |
#244 | Coyote Wind LLC | Snyder, TX | 609.9 GWh |
#245 | Foxtail Wind, LLC | Forbes, ND | 608.9 GWh |
#247 | South Plains Wind Phase I | Floydada, TX | 601.3 GWh |
#248 | Cedar Creek II | New Raymer, CO | 600.9 GWh |
#249 | Sweetwater Wind 4 LLC | Roscoe, TX | 600.7 GWh |
#250 | Tatanka Ridge | Toronto, SD | 599.5 GWh |
#251 | NaturEner Rim Rock Energy | Kevin, MT | 595.6 GWh |
#252 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#253 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#254 | Astra Wind Farm | Happy, TX | 594.3 GWh |
#255 | Limestone Wind Project | Coolidge, TX | 594.3 GWh |
#256 | Solano Wind | Rio Vista, CA | 592.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bison 4 Wind Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Valley | Beulah, ND | 5.1 TWh | 30 mi |
Baldwin Wind LLC | Wilton, ND | 360.4 GWh | 40.9 mi |
Bison 2 Wind Energy Center | New Salem, ND | 236.8 GWh | 0 mi |
Bison 3 Wind Energy Center | New Salem, ND | 242.1 GWh | 0 mi |
Bison I Wind Energy Center | New Salem, ND | 181.7 GWh | 0 mi |
Coal Creek | Underwood, ND | 7.8 TWh | 33.2 mi |
Coyote | Beulah, ND | 2.3 TWh | 20.7 mi |
FPL Energy Burleigh County Wind | Wilton, ND | 175.4 GWh | 39.8 mi |
FPL Energy Oliver Wind I LLC | Center, ND | 171.5 GWh | 20.6 mi |
FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh | 20.6 mi |
Garrison | Riverside, ND | 2.1 TWh | 36.2 mi |
Glen Ullin Energy Center | Glen Ullin, ND | 443.0 GWh | 12.4 mi |
Glen Ullin Station 6 | Glen Ullin, ND | 38.0 GWh | 14.5 mi |
Leland Olds | Stanton, ND | 3.2 TWh | 23.5 mi |
Milton R Young | Center, ND | 4.4 TWh | 17.1 mi |
Oliver Wind III, LLC | Mandan, ND | 428.9 GWh | 18.3 mi |
R M Heskett | Mandan, ND | 29.5 GWh | 32.6 mi |
Sunflower Wind Project | Mandan, ND | 433.2 GWh | 26.4 mi |
Tesoro Mandan Cogeneration Plant | Mandan, ND | 36.8 GWh | 33.1 mi |
Wilton Wind II LLC | Wilton, ND | 187.0 GWh | 41.6 mi |