Bishop Creek 3
Hwy168 Inyo National Forest, Bishop, CA 93514Plant Summary Information
Bishop Creek 3 is ranked #112 out of 214 hydroelectric power plants in California in terms of total annual net electricity generation.
Bishop Creek 3 is comprised of 3 generators and generated 4.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Bishop Creek 3 |
---|---|
Utility Name | Southern California Edison Co |
Location | Inyo County, CA |
Initial Operation Date | June 1913 |
Last Update | Dec 2022 |
Annual Generation | 18.1 GWh |
Annual Consumption | 67.8 k MMBtu |
Ranked #5,075 out of 11,249 Power Plants Nationwide | |
Ranked #763 out of 1,354 Water Power Plants Nationwide | |
Ranked #713 out of 1,501 California Power Plants | |
Ranked #112 out of 214 California Water Power Plants | |
Fuel Types | Water |
Map of Bishop Creek 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bishop Creek 3.
Monthly Net Generation for Bishop Creek 3
Bishop Creek 3 Details
Summary Information | |
---|---|
Plant Name | Bishop Creek 3 (324) |
Plant Address | Hwy168 Inyo National Forest Bishop, CA 93514 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 37.30196, -118.53196 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | June 1913 |
Annual Generation | 18.1 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Bishop Creek |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1913 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating June 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1913 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating June 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1913 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Bishop Creek 3 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#753 | West End Dam Hydroelectric Project | Carthage, NY | 19.2 GWh |
#754 | Loud | Oscoda, MI | 19.2 GWh |
#755 | Rapide Croche | Kaukana, WI | 19.1 GWh |
#756 | Moline | Moline, IL | 19.4 GWh |
#757 | Manitou Springs | Manitou Spring, CO | 19.0 GWh |
#758 | Hat Creek 1 | Burney, CA | 18.9 GWh |
#759 | Lower No 1 | Idaho Falls, ID | 18.9 GWh |
#760 | Point A | Andalusia, AL | 18.6 GWh |
#761 | PEC Headworks | Moses Lake, WA | 18.4 GWh |
#762 | Mill C | Town of Plattsburgh, NY | 18.3 GWh |
#764 | South Edwards | Fine, NY | 18.1 GWh |
#765 | South | Manton, CA | 17.9 GWh |
#766 | Falls Creek | Cascadia, OR | 17.9 GWh |
#767 | Brainerd Public Utilities | Brainerd, MN | 17.9 GWh |
#768 | Granite Shoals | Marble Falls, TX | 17.9 GWh |
#769 | Glen Ferris Hydro | Gauley Bridge, WV | 17.8 GWh |
#770 | Nacoochee | Lakemont, GA | 17.8 GWh |
#771 | Bishop Creek 2 | Bishop, CA | 17.8 GWh |
#772 | S D Warren Westbrook | Westbrook, ME | 17.8 GWh |
#773 | Muck Valley Hydroelectric | NA, CA | 17.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bishop Creek 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Balch 1 | Balch Camp, CA | 66.5 GWh | 40.9 mi |
Balch 2 | Balch Camp, CA | 233.6 GWh | 40.9 mi |
Big Creek 1 | Big Creek, CA | 229.8 GWh | 39.5 mi |
Big Creek 2A | Auberry, CA | 591.8 GWh | 43.2 mi |
Big Pine Creek | Big Pine, CA | 12.0 GWh | 15.9 mi |
Bishop Creek 2 | Bishop, CA | 17.8 GWh | 3 mi |
Bishop Creek 4 | Bishop, CA | 27.2 GWh | 2.2 mi |
Bishop Creek 5 | Bishop, CA | 7.6 GWh | 3.6 mi |
Bishop Creek 6 | Bishop, CA | 1.4 GWh | 5 mi |
CD4 | Mammoth Lakes, CA | 132.5 GWh | 31.8 mi |
Control Gorge | Bishop, CA | 27.0 GWh | 9.5 mi |
Haas | Balch Camp, CA | 551.4 GWh | 37.3 mi |
J S Eastwood | Shaver Lake, CA | 82.5 GWh | 41.3 mi |
Mammoth G1 | Mammoth lakes, CA | 50.7 GWh | 31.6 mi |
Mammoth G2 | Mammoth Lakes, CA | 58.3 GWh | 31.5 mi |
Mammoth G3 | Mammoth Lakes, CA | 102.3 GWh | 31.5 mi |
Middle Gorge | Bishop, CA | 27.6 GWh | 14.5 mi |
Pleasant Valley Hydro | Bishop, CA | 2.0 GWh | 7.8 mi |
Portal | Lakeshore, CA | 20.0 GWh | 34.6 mi |
Upper Gorge | Bishop, CA | 28.7 GWh | 17.2 mi |