Bio-Rad
2000 Alfred Nobel Dr, Hercules, CA 94547Plant Summary Information
Bio-Rad is ranked #446 out of 747 solar farms in California in terms of total annual net electricity generation.
Bio-Rad generated 1.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Bio-Rad |
---|---|
Utility Name | Vista Solar, Inc. |
Location | Contra Costa County, CA |
Initial Operation Date | October 2021 |
Last Update | Dec 2022 |
Annual Generation | 4.0 GWh |
Annual Consumption | 14.4 k MMBtu |
Ranked #7,974 out of 11,249 Power Plants Nationwide | |
Ranked #3,007 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,113 out of 1,501 California Power Plants | |
Ranked #446 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Bio-Rad
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bio-Rad.
Monthly Net Generation for Bio-Rad
Bio-Rad Details
Summary Information | |
---|---|
Plant Name | Bio-Rad (63189) |
Plant Address | 2000 Alfred Nobel Dr Hercules, CA 94547 |
Utility | Vista Solar, Inc. (62701) |
Latitude, Longitude | 38.02249, -122.27366 |
Generation Dates on File | Oct 2021 to Dec 2022 |
Initial Operation Date | October 2021 |
Annual Generation | 4.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 208.00 kV / 120.00 kV |
Energy Storage | No |
Generator BIORD Details Operating October 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 2.5 MW |
Summer Capacity | 2.4 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 15 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.5 MW |
Virtual Net Metering Agreement | No |
Bio-Rad Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Bio-Rad USA | 1000 Alfred Nobel Drive, Hercules, CA 94547 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2997 | Camp Solar Plant | Woodbury, GA | 4.0 GWh |
#2998 | Merrimack Solar Farm, LLC | Merrimack, NH | 4.0 GWh |
#2999 | Gibbons CSG | Snow Hill, MD | 4.0 GWh |
#3000 | Ellsworth I CSG | Mechanicville, NY | 4.0 GWh |
#3001 | Sol Phoenix | Capitol Heights, MD | 4.0 GWh |
#3002 | Rodeo Solar C2 | Lancaster, CA | 4.0 GWh |
#3003 | 233 Randolph 74 Solar I, LLC | Shelby, NC | 4.0 GWh |
#3004 | Rockford Solar Farm | Rockford, IL | 4.0 GWh |
#3005 | Vickers | Chapel Hill, NC | 4.0 GWh |
#3006 | Plainfield Pike | Johnston, RI | 4.0 GWh |
#3008 | SCCCD - Fresno Community College | Fresno, CA | 4.0 GWh |
#3009 | Crawfordsville Solar Park 4 | Crawfordsville, IN | 4.0 GWh |
#3010 | Phillips Route 82 Solar LLC | East Fishkill, NY | 4.0 GWh |
#3011 | Scenic Hill Solar IV, LLC | Clarksville, AR | 4.0 GWh |
#3012 | Black Cap Solar Plant | Lakeview, OR | 4.0 GWh |
#3013 | Pine Road Solar, LLC CSG | Sandwich, IL | 4.0 GWh |
#3014 | Edwardsville Solar II | Edwardsville, IL | 4.0 GWh |
#3015 | Target Woodland Solar Project | Woodland, CA | 4.0 GWh |
#3016 | EMWD - Sun City RWRF | Menifee, CA | 4.0 GWh |
#3017 | Captain Solar, LLC | Mt. Morris, MI | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bio-Rad.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
American Canyon Solar | American Canyon, CA | 7.3 GWh | 10.1 mi |
C&H Sugar Plant | Crockett, CA | 42.3 GWh | 3.8 mi |
CA Dept of Public Health at Richmond | Richmond, CA | 4.5 GWh | 8.1 mi |
CCCSD Wastewater Treatment Plnt | Martinez, CA | 23.7 GWh | 11.2 mi |
Crockett Cogen Project | Crockett, CA | 1.6 TWh | 3.9 mi |
Lake Herman | Benicia, CA | 9.1 GWh | 8.8 mi |
Marathon Bay Area Cogen | Martinez, CA | 705.9 GWh | 11.7 mi |
Marin Clean Energy Solar One | Richmond, CA | 23.4 GWh | 7.8 mi |
Martinez Refining | Martinez, CA | 760.1 GWh | 8.8 mi |
Martinez Sulfuric Acid Regeneration Plt | Martinez, CA | 18.1 GWh | 8.7 mi |
Nove Power Plant | Richmond, CA | 172.4 MWh | 7 mi |
PE Berkeley | Berkeley, CA | 194.1 GWh | 10.5 mi |
Phillips 66 Carbon Plant | Rodeo, CA | 57.5 GWh | 2.2 mi |
Phillips 66 Rodeo Refinery | Rodeo, CA | 363.2 GWh | 1.6 mi |
Pixar - Emeryville | Emeryville, CA | 7.4 GWh | 13.1 mi |
Power Generation Station (PGS) 2 | Oakland, CA | 22.6 GWh | 13.6 mi |
Richmond Cogen | Richmond, CA | 822.3 GWh | 8.5 mi |
SFDK Solar | Vallejo, CA | 10.9 GWh | 7.9 mi |
Valero Refinery Cogeneration Unit 1 | Benicia, CA | 250.7 GWh | 8 mi |
WWTP Power Generation Station | Oakland, CA | 26.4 GWh | 13.6 mi |