Biltmore Solar Fields
1 Approach Rd., Asheville, NC 28803Plant Summary Information
Biltmore Solar Fields is ranked #745 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Biltmore Solar Fields generated 69.4 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Biltmore Solar Fields |
---|---|
Utility Name | The Biltmore Company |
Location | Buncombe County, NC |
Initial Operation Date | January 2012 |
Last Update | Dec 2022 |
Annual Generation | 385.0 MWh |
Annual Consumption | 2.0 k MMBtu |
Ranked #11,102 out of 11,835 Power Plants Nationwide | |
Ranked #5,546 out of 5,643 Solar Power Plants Nationwide | |
Ranked #840 out of 862 North Carolina Power Plants | |
Ranked #745 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Biltmore Solar Fields
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Biltmore Solar Fields.
Monthly Net Generation for Biltmore Solar Fields
Biltmore Solar Fields Details
Summary Information | |
---|---|
Plant Name | Biltmore Solar Fields (61271) |
Plant Address | 1 Approach Rd., Asheville, NC 28803 |
Utility | The Biltmore Company (60880) |
Latitude, Longitude | 35.56116, -82.58844 |
Generation Dates on File | Jan 2018 to Dec 2022 |
Initial Operation Date | January 2012 |
Annual Generation | 385.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | SP-1365 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress West (CPLW) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 18950 Details Operating January 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 1.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Biltmore Solar Fields Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Biltmore Natural Resources, LLC | 1 N. Pack Square, Asheville, NC 28801 | 60.00% |
Biltmore Energy Company, LLC | 1 N. Pack Square, Asheville, NC 28801 | 40.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5536 | Oswego | Oswego, NY | 457.0 MWh |
#5537 | Solar Photovoltaic Project #03 | Rialto, CA | 452.8 MWh |
#5538 | NY Lancaster Gunnville Rd Site 1 Solar CSG | Lancaster, NY | 451.0 MWh |
#5539 | SV CSG Baileyville 2 LLC | Baileyville, IL | 450.0 MWh |
#5540 | SV CSG South Dekalb 1 LLC | Dekalb, IL | 447.0 MWh |
#5541 | Manteca Land PV | Manteca, CA | 444.0 MWh |
#5542 | Blue Elk III Solar, LLC | Eaton Rapids, MI | 433.0 MWh |
#5543 | SV CSG South Dekalb 2 LLC | Dekalb, IL | 432.0 MWh |
#5544 | Mercer Mall | Lawrenceville, NJ | 405.0 MWh |
#5545 | UASTP I | Tucson, AZ | 403.0 MWh |
#5547 | Bowie State Solar | Bowie, MD | 362.0 MWh |
#5548 | Amazon MDW7 Solar Project | Monee, IL | 361.0 MWh |
#5549 | Double J Dairy Array | Visalia, CA | 354.0 MWh |
#5550 | Old Bridge Global Landfill CSG | Old Bridge, NJ | 353.0 MWh |
#5551 | POM Juice Solar | Fresno, CA | 352.0 MWh |
#5552 | Corkwood Solar (CSG) | Howland, ME | 344.0 MWh |
#5553 | Redwood Coast Airport Microgrid | McKinleyville, CA | 27.0 MWh |
#5554 | Solar Photovoltaic Project #22 | Redlands, CA | 329.9 MWh |
#5555 | SolarClub 03 | Starbuck, MN | 327.0 MWh |
#5556 | Solops 371 Hoes LLC | Piscataway, NJ | 322.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Biltmore Solar Fields.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amethyst Solar | Forest City, NC | 5.9 GWh | 40.9 mi |
Asheville | Arden, NC | 4.0 TWh | 6.6 mi |
Bridgewater | Morganton, NC | 40.3 GWh | 44 mi |
Canton North Carolina | Canton, NC | 281.5 GWh | 14.3 mi |
Cedar Cliff | Tuckasegee, NC | 9.9 GWh | 35.7 mi |
Hot Springs Energy Storage & Microgrid | Hot Springs, NC | 1.9 GWh | 26.4 mi |
Innovative Solar 10 | Canton, NC | 2.6 GWh | 18 mi |
Innovative Solar 14, LLC | Hendersonville, NC | 3.2 GWh | 18.6 mi |
Innovative Solar 16 | Hendersonville, NC | 3.3 GWh | 19.1 mi |
Innovative Solar 6 | Leicester, NC | 6.5 GWh | 9.5 mi |
Lake Lure | Lake Lure, NC | 3.2 GWh | 24.6 mi |
Metropolitan Sewerage District | Asheville, NC | 6.7 GWh | 6.1 mi |
Sawtell Solar | Hendersonville, NC | 5.9 GWh | 17.3 mi |
SR Greenville II | Greeneville, TN | 10.2 GWh | 44.3 mi |
Tennessee Creek | Tuckasegee, NC | 24.8 GWh | 33.5 mi |
Thorpe | Tuckasegee, NC | 55.4 GWh | 37.8 mi |
Tuckasegee | Tuckasegee, NC | 4.8 GWh | 37.3 mi |
Turner Shoals | Mill Springs, NC | 10.8 GWh | 27.5 mi |
Tuxedo | Flat Rock, NC | 16.8 GWh | 24.6 mi |
Walters | Waterville, NC | 321.0 GWh | 27.5 mi |