Biglow Canyon Wind Farm
96900 Herin Lane, Wasco, OR 97065Plant Summary Information
Biglow Canyon Wind Farm is ranked #15 out of 255 power plants in Oregon in terms of total annual net electricity generation.
Biglow Canyon Wind Farm generated 116.1 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Biglow Canyon Wind Farm |
---|---|
Utility Name | Portland General Electric Co |
Location | Sherman County, OR |
Initial Operation Date | December 2007 |
Last Update | Jan 2025 |
Annual Generation | 986.2 GWh |
Annual Consumption | 3.5 M MMBtu |
Ranked #743 out of 11,979 Power Plants Nationwide | |
Ranked #70 out of 1,359 Wind Power Plants Nationwide | |
Ranked #15 out of 255 Oregon Power Plants | |
Ranked #1 out of 49 Oregon Wind Power Plants | |
Fuel Types | Wind |
Map of Biglow Canyon Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Biglow Canyon Wind Farm.
Monthly Net Generation for Biglow Canyon Wind Farm
Biglow Canyon Wind Farm Details
Summary Information | |
---|---|
Plant Name | Biglow Canyon Wind Farm (56485) |
Plant Address | 96900 Herin Lane, Wasco, OR 97065 |
Utility | Portland General Electric Co (15248) |
Latitude, Longitude | 45.65375, -120.60341 |
Generation Dates on File | Dec 2007 to Jan 2025 |
Initial Operation Date | December 2007 |
Annual Generation | 986.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Portland General Electric Company (PGE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2007
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BCW1_2_GNODE1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BCW1_2_PHASE-1 |
Nameplate Capacity | 125.4 MW |
Summer Capacity | 125.4 MW |
Winter Capacity | 125.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 76 |
Turbine Details | |
Number Of Turbines | 76 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V82-1.65 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 260 |
Generator 2 Details Operating September 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BCW1_2_GNODE2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BCW1_2_PHASE-2 |
Nameplate Capacity | 163.3 MW |
Summer Capacity | 163.3 MW |
Winter Capacity | 163.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 71 |
Turbine Details | |
Number Of Turbines | 71 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-93 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Generator 3 Details Operating August 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | BCW1_2_GNODE3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | BCW1_2_PHASE-3 |
Nameplate Capacity | 161 MW |
Summer Capacity | 161 MW |
Winter Capacity | 161 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 70 |
Turbine Details | |
Number Of Turbines | 70 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-93 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Biglow Canyon Wind Farm Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#60 | Flat Ridge 2 Wind Energy LLC | Zenda, KS | 1.0 TWh |
#61 | Aurora Wind Project | Tioga, ND | 1.0 TWh |
#62 | Seven Cowboy Wind Project, LLC | Gage, OK | 1.0 TWh |
#63 | Thunder Ranch Wind Project | Marland, OK | 1.0 TWh |
#64 | Little Blue Wind Project, LLC | Blue Hill, NE | 1.0 TWh |
#65 | Nobles 2 Wind Project | Wilmont, MN | 1.0 TWh |
#66 | Triple H Wind Project | Highmore, SD | 1.0 TWh |
#67 | Rattlesnake Creek Wind Project | Dixon, NE | 990.1 GWh |
#68 | Hubbard Wind | Mt Calm, TX | 989.8 GWh |
#69 | La Joya NM | Encino, NM | 989.1 GWh |
#71 | Mohave County Wind Farm | Willow Beach, AZ | 983.6 GWh |
#72 | Chisholm View Wind Project | Hunter, OK | 983.2 GWh |
#73 | South Plains II | Lockney, TX | 982.9 GWh |
#74 | Skeleton Creek Energy Center Hybrid | Carrier, OK | 981.4 GWh |
#75 | Pomeroy Wind Farm | Fonda, IA | 979.8 GWh |
#76 | TX Jumbo Road Wind | Hereford, TX | 979.2 GWh |
#77 | Kay Wind, LLC | Newkirk, OK | 978.5 GWh |
#78 | Atchison County Wind | Westboro, MO | 977.4 GWh |
#79 | Palo Duro Wind | Perryton, TX | 976.6 GWh |
#80 | Grandview Wind Farm, LLC | Panhandle, TX | 970.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Biglow Canyon Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Golden Hill Wind | Wasco, OR | 608.0 GWh | 8.1 mi |
Goldendale Generating Station | Goldendale, WA | 2.2 TWh | 15.5 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 9.7 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 16.5 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh | 9.3 mi |
John Day | Rufus, OR | 7.1 TWh | 6.2 mi |
Klondike Wind Power | Wasco, OR | 30.9 GWh | 7.2 mi |
Klondike Windpower II | Wasco, OR | 229.2 GWh | 5.7 mi |
Klondike Windpower III | Wasco, OR | 717.7 GWh | 6.8 mi |
Leaning Juniper | Arlington, OR | 254.7 GWh | 19 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 16.6 mi |
Linden Wind Energy Project | Goldendale, WA | 116.7 GWh | 10.7 mi |
PaTu Wind Farm LLC | Wasco, OR | 25.5 GWh | 2.9 mi |
Star Point Wind Project LLC | Wasco, OR | 194.0 GWh | 11.6 mi |
Tuolumne Wind Project | Goldendale, WA | 329.8 GWh | 18.4 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 68.2 GWh | 15.8 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 13.9 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 16.9 mi |
Windy Flats Wind Project | Centerville, WA | 567.8 GWh | 12.2 mi |
WyEast Solar | Wasco, OR | 19.6 GWh | 4.8 mi |