Big Turtle Wind Farm 2
8661 Sand Beach Rd, Harbor Beach, MI 48441Plant Summary Information
Big Turtle Wind Farm 2 is ranked #33 out of 36 wind farms in Michigan in terms of total annual net electricity generation.
Big Turtle Wind Farm 2 generated 28.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Big Turtle Wind Farm 2 |
---|---|
Utility Name | DTE Electric Company |
Location | Huron County, MI |
Initial Operation Date | October 2016 |
Last Update | Dec 2023 |
Annual Generation | 62.1 GWh |
Annual Consumption | 250.8 k MMBtu |
Ranked #3,647 out of 11,835 Power Plants Nationwide | |
Ranked #935 out of 1,343 Wind Power Plants Nationwide | |
Ranked #91 out of 255 Michigan Power Plants | |
Ranked #33 out of 36 Michigan Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
Heritage Garden Wind Farm I LLC (2021 to 2021) Heritage Sustainable Energy. LLC (2022 to 2022) DTE Electric Company (2023 to 2023) |
Map of Big Turtle Wind Farm 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Turtle Wind Farm 2.
Monthly Net Generation for Big Turtle Wind Farm 2
Big Turtle Wind Farm 2 Details
Summary Information | |
---|---|
Plant Name | Big Turtle Wind Farm 2 (65143) |
Plant Address | 8661 Sand Beach Rd, Harbor Beach, MI 48441 |
Utility | DTE Electric Company (5109) |
Latitude, Longitude | 43.91956, -82.79443 |
Generation Dates on File | Jan 2021 to Dec 2023 |
Initial Operation Date | October 2016 |
Annual Generation | 62.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | International Transmission Company DBA I (56068) |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BTWF2 Details Operating October 2016
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 29.4 MW |
Summer Capacity | 29.4 MW |
Winter Capacity | 29.4 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2016 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 14 |
Turbine Details | |
Number Of Turbines | 14 |
---|---|
Predominant Turbine Manufacturer | Gamesa |
Predominant Turbine Model Number | G114-2.0 |
Design Wind Speed | 16.7 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 305 |
Big Turtle Wind Farm 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#925 | South Fork Wind | East Hampton, NY | 65.8 GWh |
#926 | Condon Windpower LLC | Condon, OR | 65.5 GWh |
#927 | Brule County Wind | Kimball, SD | 64.6 GWh |
#928 | Sheffield Wind | Sheffield, VT | 64.4 GWh |
#929 | Blue Canyon Windpower | Carnegie, OK | 64.4 GWh |
#930 | Babbitt Ranch Energy Center | Flagstaff, AZ | 64.1 GWh |
#931 | Camp Reed | Glenns Ferry, ID | 63.7 GWh |
#932 | 85 A | Tehachapi, CA | 62.9 GWh |
#933 | Red Horse 2 | Willcox, AZ | 198.7 GWh |
#934 | Big Spring Wind Power Facility | Big Spring, TX | 62.5 GWh |
#936 | New England Wind LLC | Florida, MA | 62.1 GWh |
#937 | San Gorgonio Farms Wind Farm | Whitewater, CA | 61.8 GWh |
#938 | Vansycle | Touchet, OR | 61.7 GWh |
#939 | Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh |
#940 | Yahoo Creek | Hagerman, ID | 60.9 GWh |
#941 | Lempster Wind LLC | Lempster, NH | 60.7 GWh |
#942 | Payne's Ferry | Hagerman, ID | 59.8 GWh |
#943 | Steel Winds Wind Farm | Lackawanna, NY | 59.5 GWh |
#944 | BayWa r.e Mozart LLC | Jayton, TX | 59.1 GWh |
#945 | Crosswind Energy Project | Ruthven, IA | 57.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Turtle Wind Farm 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apple Blossom Wind Farm | Pigeon, MI | 234.5 GWh | 26.9 mi |
Big Turtle Wind Farm, LLC | Harbor Beach, MI | 66.1 GWh | 4.8 mi |
Brookfield | Pigeon, MI | 231.6 GWh | 27.5 mi |
Caro | Caro, MI | 5.9 MWh | 41.1 mi |
Cross Winds Energy Park | Unionville, MI | 669.5 GWh | 40.6 mi |
Deerfield Wind Energy 2 | Port Hope, MI | 291.8 GWh | 4 mi |
Deerfield Wind Energy, LLC | Kinde, MI | 497.7 GWh | 5.4 mi |
Echo Wind Park | Elkton, MI | 444.2 GWh | 18.4 mi |
Harvest | Elkton, MI | 101.9 GWh | 21.4 mi |
Harvest 2 | Elkton, MI | 180.2 GWh | 19.1 mi |
Main Street (MI) | Sebewaing, MI | 1.0 MWh | 35.3 mi |
McKinley Wind Park | Pigeon, MI | 49.0 GWh | 22.5 mi |
Michigan Wind 1 | Ubly, MI | 131.9 GWh | 16.8 mi |
Michigan Wind 2 | Minden City, MI | 303.9 GWh | 17.9 mi |
Minden Wind Park | Minden City, MI | 107.2 GWh | 17.3 mi |
MSC Sebewaing | Sebewaing, MI | 611.6 MWh | 34.8 mi |
Pheasant Run Wind LLC | Pigeon, MI | 234.8 GWh | 27.5 mi |
Pine Street | Sebewaing, MI | 25.4 GWh | 34.9 mi |
Sigel Wind Park | Harbor Beach, MI | 236.3 GWh | 4.8 mi |
Ubly | Ubly, MI | 16.7 MWh | 15.4 mi |