Big Level Wind
259 South String Trail, Hector Township, PA 16943Plant Summary Information
Big Level Wind is ranked #3 out of 27 wind farms in Pennsylvania in terms of total annual net electricity generation.
Big Level Wind generated 40.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Big Level Wind |
---|---|
Utility Name | Big Level Wind LLC |
Location | Potter County, PA |
Initial Operation Date | December 2019 |
Last Update | Aug 2024 |
Annual Generation | 257.7 GWh |
Annual Consumption | 935.7 k MMBtu |
Ranked #2,007 out of 11,835 Power Plants Nationwide | |
Ranked #607 out of 1,343 Wind Power Plants Nationwide | |
Ranked #55 out of 231 Pennsylvania Power Plants | |
Ranked #3 out of 27 Pennsylvania Wind Power Plants | |
Fuel Types | Wind |
Map of Big Level Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Level Wind.
Monthly Net Generation for Big Level Wind
Big Level Wind Details
Summary Information | |
---|---|
Plant Name | Big Level Wind (60551) |
Plant Address | 259 South String Trail, Hector Township, PA 16943 |
Utility | Big Level Wind LLC (60328) |
Latitude, Longitude | 41.86933, -77.66594 |
Generation Dates on File | Dec 2019 to Aug 2024 |
Initial Operation Date | December 2019 |
Annual Generation | 257.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pennsylvania Electric Co (14711) PA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator BLW01 Details Operating December 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 90 MW |
Summer Capacity | 90 MW |
Winter Capacity | 90 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 25 |
Turbine Details | |
Number Of Turbines | 25 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 3.6 SL |
Design Wind Speed | 16.3 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 430 |
Big Level Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#597 | Juniper Canyon I Wind Project | Bickleton, WA | 263.0 GWh |
#598 | White Rock West Wind Project | Anadarko, OK | 262.2 GWh |
#599 | Rising Tree Wind Farm III | Mojave, CA | 261.7 GWh |
#600 | Hancock County Wind Energy Center | Garner, IA | 261.0 GWh |
#601 | Lost Lakes Wind Farm LLC | Lake Park, IA | 260.8 GWh |
#602 | Roundhouse Renewable Energy II | Granite, WY | 260.8 GWh |
#603 | White Rock East Wind Project | Anadarko, OK | 260.4 GWh |
#604 | Prairie Star Wind Farm | Grand Meadow, MN | 259.1 GWh |
#605 | NaturEner Glacier Wind Energy 2 | Ethridge, MT | 258.6 GWh |
#606 | Charles City Wind Farm | Charles City, IA | 258.3 GWh |
#608 | Red Barn Energy | Montfort, WI | 256.9 GWh |
#609 | Rail Splitter Wind Farm | Hopedale, IL | 255.9 GWh |
#610 | Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh |
#611 | Leaning Juniper | Arlington, OR | 254.7 GWh |
#612 | Number Three Wind Project | Lowville, NY | 254.6 GWh |
#613 | Keenan II Renewable Energy Co LLC | Woodward, OK | 252.8 GWh |
#614 | Caprock Wind Farm | San Jon, NM | 251.5 GWh |
#615 | Elm Creek Wind II LLC | Trimont, MN | 251.1 GWh |
#616 | South Peak Wind | Geyser, MT | 250.2 GWh |
#617 | Hatchet Ridge Wind Project | Burney, CA | 248.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Level Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angelica Solar Site 1 | Angelica, NY | 7.9 GWh | 36.6 mi |
Angelica Solar Site 2 | Belfast, NY | 7.9 GWh | 36.7 mi |
Angelica Solar Site 3 | Belfast, NY | 7.9 GWh | 36.5 mi |
Angelica Solar Site 4 | Angelica, NY | 7.9 GWh | 36.5 mi |
Baron Winds Farm | Cohocton, NY | 336.4 GWh | 35.1 mi |
Blossburg | Blossburg, PA | 136.0 MWh | 32.1 mi |
Bright Field Solar LLC(CSG) | Burns, NY | 5.7 GWh | 41 mi |
Bright Hill Solar LLC(CSG) | Dansville, NY | 7.8 GWh | 41.4 mi |
Cohocton Wind Project | Cohocton, NY | 185.4 GWh | 40.8 mi |
County Route 84 Solar | Troupsburg, NY | 8.7 GWh | 11.7 mi |
Eight Point Wind | Rexville, NY | 269.9 GWh | 16.2 mi |
Howard Wind Farm | Hornell, NY | 107.6 GWh | 31.5 mi |
Hyland LFGTE Facility | Angelica, NY | 34.1 GWh | 33.6 mi |
Jordan Energy-DFA Middlebury Center Plan | Middlebury Center, PA | 1.6 GWh | 20.2 mi |
Laurel Hill Wind | Roaring Branch, PA | 134.6 GWh | 40.2 mi |
Marsh Hill Wind Farm | Jasper, NY | 38.1 GWh | 21.5 mi |
Rowe (CSG) | Olean, NY | 8.1 GWh | 39 mi |
Time Warner Cable - Knowles | Bath, NY | 3.0 GWh | 35.6 mi |
Troupsburg | Troupsburg, NY | 8.2 GWh | 17.9 mi |
Wildflower Way Solar | Bath, NY | 7.7 GWh | 38.5 mi |