Big Lake Project CSG
19698 200th St. NW, Big Lake, MN 55309Plant Summary Information
Big Lake Project CSG is ranked #89 out of 482 solar farms in Minnesota in terms of total annual net electricity generation.
Big Lake Project CSG generated 1.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Big Lake Project CSG |
---|---|
Utility Name | DG Minnesota CSG, LLC |
Location | Sherburne County, MN |
Initial Operation Date | June 2018 |
Last Update | Dec 2023 |
Annual Generation | 7.0 GWh |
Annual Consumption | 24.6 k MMBtu |
Ranked #6,949 out of 11,852 Power Plants Nationwide | |
Ranked #2,303 out of 5,655 Solar Power Plants Nationwide | |
Ranked #224 out of 736 Minnesota Power Plants | |
Ranked #89 out of 482 Minnesota Solar Power Plants | |
Fuel Types | Solar |
Map of Big Lake Project CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Lake Project CSG.
Monthly Net Generation for Big Lake Project CSG
Big Lake Project CSG Details
Summary Information | |
---|---|
Plant Name | Big Lake Project CSG (61817) |
Plant Address | 19698 200th St. NW, Big Lake, MN 55309 |
Utility | DG Minnesota CSG, LLC (61187) |
Latitude, Longitude | 45.334, -93.792 |
Generation Dates on File | Jun 2018 to Dec 2023 |
Initial Operation Date | June 2018 |
Annual Generation | 7.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF18-1173-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BIGLA Details Operating June 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 6.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Big Lake Project CSG Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2293 | Breckenridge Solar | Palmer, MA | 6.9 GWh |
#2294 | 0 Hammond St CSG | Carver, MA | 7.0 GWh |
#2295 | ASD Wallum MA Solar LLC(CSG) | Douglas, MA | 7.0 GWh |
#2296 | Church Road Solar LLC | Angier, NC | 7.1 GWh |
#2297 | Hwy 14 Holdco Solar CSG | Byron, MN | 7.1 GWh |
#2298 | Cottage Grove Project CSG | Cottage Grove, MN | 7.1 GWh |
#2299 | Bellisario Solar 2 | Lapeer, NY | 7.0 GWh |
#2300 | The Lawrenceville School Solar Facility | Lawrenceville, NJ | 7.0 GWh |
#2301 | Goose Pond Solar | Southwick, MA | 7.0 GWh |
#2302 | Swansboro Solar, LLC | Maysville, NC | 7.0 GWh |
#2304 | Heedeh Solar | Delco, NC | 7.0 GWh |
#2305 | Bruce A Henry Solar Farm | Georgetown, DE | 7.0 GWh |
#2306 | Empire Solar | Farmington, MN | 7.0 GWh |
#2307 | Eagle Solar | Warrenton, NC | 7.0 GWh |
#2308 | Charlie | Julian, NC | 7.0 GWh |
#2309 | SEPV Imperial Dixieland West | Imperial, CA | 7.0 GWh |
#2310 | CES Agawam Tuckahoe Solar Hybrid | Agawam, MA | 7.0 GWh |
#2311 | Big Lake Holdco Solar CSG | Big Lake, MN | 7.0 GWh |
#2312 | Rice Lake Solar Array | Rice Lake, WI | 7.0 GWh |
#2313 | Saint Albans Solar | Georgia, VT | 7.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Lake Project CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Becker Solar 3 CSG | St. Michael, MN | 1.3 GWh | 12.2 mi |
Becker Solar CSG | St. Michael, MN | 1.6 GWh | 12.1 mi |
Big Lake Holdco Solar CSG | Big Lake, MN | 7.0 GWh | 0.8 mi |
Elk River | Elk River, MN | 47.3 GWh | 11.6 mi |
Elk River City of | Elk River, MN | 32.0 MWh | 10.5 mi |
Hammer Community (CSG) | Clear Lake, MN | 1.9 GWh | 11.8 mi |
Hammer CSG | Clear Lake, MN | 6.2 GWh | 12 mi |
Hinterland CSG, LLC | Clearlake, MN | 2.1 GWh | 12 mi |
Lake Pulaski Solar | Buffalo, MN | 14.0 GWh | 9.6 mi |
Monticello Nuclear Facility | Monticello, MN | 5.4 TWh | 2.8 mi |
Monticello Project CSG | Monticello, MN | 6.8 GWh | 4.6 mi |
Sherburne County | Becker, MN | 7.3 TWh | 5.9 mi |
SolarClub 10 LLC | Monticello, MN | 1.4 GWh | 4.6 mi |
Tatanka Wi | Buffalo, MN | 10.1 GWh | 9.6 mi |
USS Big Lake 1 Solar CSG | Big Lake, MN | 2.1 GWh | 1.8 mi |
USS Golly Gee Solar LLC | Clear Lake, MN | 713.0 MWh | 12 mi |
USS Quail Solar LLC | Monticello, MN | 2.1 GWh | 5.1 mi |
Wright Cuddyer CSG | St. Michael, MN | 6.0 GWh | 10.8 mi |
Wright Kirby 1-5 CSG | Monticello, MN | 9.1 GWh | 5.2 mi |
WrightSun CSG, LLC | St. Michael, MN | 6.7 GWh | 8.9 mi |