Big Horn Wind Project
300 Big Horn Road, Bickelton, WA 99322Plant Summary Information
Big Horn Wind Project is ranked #36 out of 135 power plants in Washington in terms of total annual net electricity generation.
Big Horn Wind Project generated 86.0 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Big Horn Wind Project |
---|---|
Utility Name | Avangrid Renewables LLC |
Location | Klickitat County, WA |
Initial Operation Date | October 2006 |
Last Update | Jan 2025 |
Annual Generation | 483.8 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,337 out of 11,979 Power Plants Nationwide | |
Ranked #369 out of 1,359 Wind Power Plants Nationwide | |
Ranked #36 out of 135 Washington Power Plants | |
Ranked #6 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) |
Map of Big Horn Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Horn Wind Project.
Monthly Net Generation for Big Horn Wind Project
Big Horn Wind Project Details
Summary Information | |
---|---|
Plant Name | Big Horn Wind Project (56361) |
Plant Address | 300 Big Horn Road, Bickelton, WA 99322 |
Utility | Avangrid Renewables LLC (15399) |
Latitude, Longitude | 45.8877, -120.2896 |
Generation Dates on File | Nov 2006 to Jan 2025 |
Initial Operation Date | October 2006 |
Annual Generation | 483.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 06-4-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Avangrid Renewables LLC (AVRN) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating October 2006
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 199 MW |
Summer Capacity | 199 MW |
Winter Capacity | 199 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 133 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 133 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 12.5 MPH |
Wind Quality Class | 4 - Very Low Wind |
Turbine Hub Height Feet | 262 |
Big Horn Wind Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#359 | Elk City LLC | Sweetwater, OK | 503.3 GWh |
#360 | Meridian Wind Park | Merrill, MI | 498.1 GWh |
#361 | Voyager Wind II | Mojave, CA | 496.9 GWh |
#362 | Ranchland Wind Project II | Cisco, TX | 496.1 GWh |
#363 | Blue Summit Wind LLC | Vernon, TX | 492.6 GWh |
#364 | Walleye Wind | Beaver Creek, MN | 491.6 GWh |
#365 | Goldthwaite Wind Energy Facility | Goldthwaite, TX | 490.1 GWh |
#366 | Roadrunner Wind Farm | Cisco, TX | 488.9 GWh |
#367 | Ford County Wind Farm LLC | Ford County, IL | 488.6 GWh |
#368 | Thunder Spirit Wind, LLC | Hettinger, ND | 487.7 GWh |
#370 | Ensign Wind LLC | Montezuma, KS | 483.0 GWh |
#371 | Bingham Wind | Bingham, ME | 475.6 GWh |
#372 | Los Vientos Windpower III | Rio Grande City, TX | 475.5 GWh |
#373 | Cimarron Windpower II | Cimarron, KS | 475.5 GWh |
#374 | Otter Creek Wind Farm LLC | Ransom, IL | 474.6 GWh |
#375 | Shannon Wind | Windhorst, TX | 474.2 GWh |
#376 | Buffalo Ridge Wind | Lake Benton, MN | 470.1 GWh |
#377 | Mesteno | Rio Grande City, TX | 468.8 GWh |
#378 | Manzana Wind LLC | Rosamond, CA | 468.5 GWh |
#379 | White Rock East Wind Project | Anadarko, OK | 467.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Horn Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Wind Power Project | Arlington, OR | 177.8 GWh | 12.6 mi |
Big Horn Wind II | Bickleton, WA | 108.5 GWh | 2.3 mi |
Biglow Canyon Wind Farm | Wasco, OR | 986.2 GWh | 22.1 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 13.3 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 5.9 mi |
John Day | Rufus, OR | 7.1 TWh | 22.8 mi |
Juniper Canyon I Wind Project | Bickleton, WA | 262.8 GWh | 3.5 mi |
Leaning Juniper | Arlington, OR | 254.7 GWh | 16.7 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 16.4 mi |
Lund Hill Solar | Bickleton, WA | 359.3 GWh | 3.1 mi |
Montague Wind Power Facility LLC | Arlington, OR | 510.5 GWh | 23 mi |
North Hurlburt Wind LLC | Arlington, OR | 594.8 GWh | 14.7 mi |
Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh | 14.5 mi |
South Hurlburt Wind LLC | Arlington, OR | 599.6 GWh | 16.1 mi |
Threemile Canyon | Boardman, OR | 19.5 GWh | 22.4 mi |
Threemile Digester | Boardman, OR | 37.6 GWh | 22.4 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 68.2 GWh | 21.7 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 14.7 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 5.6 mi |
Willow Creek Energy Center | Lone, OR | 140.0 GWh | 21.7 mi |