Big Horn Wind Project
300 Big Horn Road, Bickelton, WA 99322Plant Summary Information
Big Horn Wind Project is ranked #37 out of 134 power plants in Washington in terms of total annual net electricity generation.
Big Horn Wind Project generated 129.9 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Big Horn Wind Project |
---|---|
Utility Name | Avangrid Renewables LLC |
Location | Klickitat County, WA |
Initial Operation Date | October 2006 |
Last Update | Aug 2024 |
Annual Generation | 477.7 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,332 out of 11,835 Power Plants Nationwide | |
Ranked #361 out of 1,343 Wind Power Plants Nationwide | |
Ranked #37 out of 134 Washington Power Plants | |
Ranked #6 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) |
Map of Big Horn Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Horn Wind Project.
Monthly Net Generation for Big Horn Wind Project
Big Horn Wind Project Details
Summary Information | |
---|---|
Plant Name | Big Horn Wind Project (56361) |
Plant Address | 300 Big Horn Road, Bickelton, WA 99322 |
Utility | Avangrid Renewables LLC (15399) |
Latitude, Longitude | 45.8877, -120.2896 |
Generation Dates on File | Nov 2006 to Aug 2024 |
Initial Operation Date | October 2006 |
Annual Generation | 477.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 06-4-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Avangrid Renewables LLC (AVRN) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating October 2006
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 199 MW |
Summer Capacity | 199 MW |
Winter Capacity | 199 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 133 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 133 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 12.5 MPH |
Wind Quality Class | 4 - Very Low Wind |
Turbine Hub Height Feet | 262 |
Big Horn Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#351 | Deerfield Wind Energy, LLC | Kinde, MI | 497.7 GWh |
#352 | Los Vientos Windpower IV | Rio Grande City, TX | 495.6 GWh |
#353 | Desert Wind Farm, LLC | Hertford, NC | 493.3 GWh |
#354 | Blue Summit Wind LLC | Vernon, TX | 492.6 GWh |
#355 | Goldthwaite Wind Energy Facility | Goldthwaite, TX | 490.1 GWh |
#356 | Thunder Spirit Wind, LLC | Hettinger, ND | 487.7 GWh |
#357 | Clearwater Wind East | Miles City, MT | 486.8 GWh |
#358 | Montague Wind Power Facility LLC | Arlington, OR | 485.7 GWh |
#359 | Ensign Wind LLC | Montezuma, KS | 483.0 GWh |
#360 | Cimarron Wind Energy LLC | Cimmaron, KS | 479.4 GWh |
#362 | Dakota Range III Wind Project | Summit, SD | 476.5 GWh |
#363 | Cimarron Windpower II | Cimarron, KS | 475.5 GWh |
#364 | Ford County Wind Farm LLC | Ford County, IL | 475.2 GWh |
#365 | Voyager Wind II | Mojave, CA | 473.5 GWh |
#366 | Otter Creek Wind Farm LLC | Ransom, IL | 468.9 GWh |
#367 | Manzana Wind LLC | Rosamond, CA | 468.5 GWh |
#368 | Rocksprings | Del Rio, TX | 467.8 GWh |
#369 | Los Vientos Windpower III | Rio Grande City, TX | 465.2 GWh |
#370 | Walleye Wind | Beaver Creek, MN | 464.0 GWh |
#371 | Seven Mile Hill | Medicine Bow, WY | 463.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Horn Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Wind Power Project | Arlington, OR | 177.8 GWh | 12.6 mi |
Big Horn Wind II | Bickleton, WA | 111.0 GWh | 2.3 mi |
Biglow Canyon Wind Farm | Wasco, OR | 926.4 GWh | 22.1 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 13.3 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 5.9 mi |
John Day | Rufus, OR | 6.9 TWh | 22.8 mi |
Juniper Canyon I Wind Project | Bickleton, WA | 263.0 GWh | 3.5 mi |
Leaning Juniper | Arlington, OR | 254.7 GWh | 16.7 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 16.4 mi |
Lund Hill Solar | Bickleton, WA | 342.2 GWh | 3.1 mi |
Montague Wind Power Facility LLC | Arlington, OR | 485.7 GWh | 23 mi |
North Hurlburt Wind LLC | Arlington, OR | 574.5 GWh | 14.7 mi |
Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh | 14.5 mi |
South Hurlburt Wind LLC | Arlington, OR | 583.7 GWh | 16.1 mi |
Threemile Canyon | Boardman, OR | 19.5 GWh | 22.4 mi |
Threemile Digester | Boardman, OR | 37.6 GWh | 22.4 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 81.0 GWh | 21.7 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 14.7 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 5.6 mi |
Willow Creek Energy Center | Lone, OR | 140.0 GWh | 21.7 mi |