Big Creek 3
47369 Lower Redinger Road, Auberry, CA 93602Plant Summary Information
Big Creek 3 is ranked #50 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Big Creek 3 is comprised of 5 generators and generated 211.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Big Creek 3 |
---|---|
Utility Name | Southern California Edison Co |
Location | Fresno County, CA |
Initial Operation Date | September 1923 |
Last Update | Aug 2024 |
Annual Generation | 783.0 GWh |
Annual Consumption | 3.0 M MMBtu |
Ranked #895 out of 11,835 Power Plants Nationwide | |
Ranked #50 out of 1,371 Water Power Plants Nationwide | |
Ranked #44 out of 1,569 California Power Plants | |
Ranked #5 out of 222 California Water Power Plants | |
Fuel Types | Water |
Map of Big Creek 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Creek 3.
Monthly Net Generation for Big Creek 3
Big Creek 3 Details
Summary Information | |
---|---|
Plant Name | Big Creek 3 (319) |
Plant Address | 47369 Lower Redinger Road, Auberry, CA 93602 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 37.14852, -119.38662 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | September 1923 |
Annual Generation | 783.0 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | San Joaquin River |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator 1 Details Operating October 1923
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 34 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 34 MW |
Winter Capacity | 34 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1923 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating October 1923
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 34 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 33 MW |
Winter Capacity | 33 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1923 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details OA September 1923
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 34 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 34 MW |
Winter Capacity | 34 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | OA |
First Operation Date | September 1923 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating April 1948
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 36 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 36 MW |
Winter Capacity | 36 MW |
Minimum Load | 3.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1948 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 5 Details Operating February 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 36.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 36.5 MW |
Winter Capacity | 36.5 MW |
Minimum Load | 3.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Big Creek 3 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#40 | Devil Canyon | San Bernardino, CA | 925.8 GWh |
#41 | Davis Dam | Kingman, AZ | 908.9 GWh |
#42 | Oxbow (OR) | Oxbow, OR | 900.1 GWh |
#43 | Yellowtail | Hardin, MT | 846.0 GWh |
#44 | Mossyrock | Silver Creek, WA | 844.5 GWh |
#45 | Keokuk | Keokuk, IA | 834.9 GWh |
#46 | Cabinet Gorge | Clark Fork, ID | 815.7 GWh |
#47 | Fontana Dam | Fontana Dam, NC | 813.6 GWh |
#48 | Watts Bar Hydro | Spring City, TN | 812.4 GWh |
#49 | Selis Ksanka Qlispe | Polson, MT | 804.8 GWh |
#51 | Round Butte | Madras, OR | 780.2 GWh |
#52 | Big Bend Dam | Chamberlain, SD | 770.5 GWh |
#53 | Bull Shoals | Mountain Home, AR | 750.5 GWh |
#54 | Great Lakes Hydro America - ME | Millinocket, ME | 737.2 GWh |
#55 | Gavins Point | Crofton, NE | 715.3 GWh |
#56 | Sidney A Murray Jr Hydroelectric | Vidalia, LA | 707.5 GWh |
#57 | Fort Peck | Fort Peck, MT | 701.2 GWh |
#58 | Fort Loudoun | Lenoir City, TN | 676.5 GWh |
#59 | Gorge | Rockport, WA | 676.4 GWh |
#60 | Chickamauga | Chattanooga, TN | 657.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Creek 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A G Wishon | North Fork, CA | 16.1 GWh | 6.5 mi |
Balch 1 | Balch Camp, CA | 184.4 GWh | 23.4 mi |
Balch 2 | Balch Camp, CA | 489.7 GWh | 23.4 mi |
Big Creek 1 | Big Creek, CA | 393.8 GWh | 9 mi |
Big Creek 2 | Auberry, CA | 296.2 GWh | 5.6 mi |
Big Creek 2A | Auberry, CA | 537.5 GWh | 5.7 mi |
Big Creek 4 | North Fork, CA | 452.9 GWh | 5.7 mi |
Big Creek 8 | Auberry, CA | 152.9 GWh | 5.3 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 26.3 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 20.3 mi |
Haas | Balch Camp, CA | 543.6 GWh | 25.3 mi |
J S Eastwood | Shaver Lake, CA | 3.8 GWh | 7.2 mi |
Kerckhoff 2 | Auberry, CA | 357.0 GWh | 10.8 mi |
Kings River PH | Balch Camp, CA | 206.7 GWh | 21.9 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 26.7 mi |
Mammoth Pool | North Fork, CA | 561.8 GWh | 5.6 mi |
Pine Flat | Piedra, CA | 561.7 GWh | 22.1 mi |
Portal | Lakeshore, CA | 21.2 GWh | 14.6 mi |
San Joaquin 2 | North Fork, CA | 1.5 GWh | 7.2 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 26.3 mi |