55325 Cascada Road, Big Creek, CA 93605Plant Summary Information
Big Creek 1 is ranked #24 out of 222 hydroelectric power plants in California in terms of total annual net electricity generation.
Big Creek 1 is comprised of 4 generators and generated 81.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Big Creek 1 |
---|---|
Utility Name | Southern California Edison Co |
Location | Fresno County, CA |
Initial Operation Date | November 1913 |
Last Update | Dec 2023 |
Annual Generation | 393.8 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,527 out of 11,852 Power Plants Nationwide | |
Ranked #118 out of 1,371 Water Power Plants Nationwide | |
Ranked #109 out of 1,570 California Power Plants | |
Ranked #24 out of 222 California Water Power Plants | |
Fuel Types | Water |
Map of Big Creek 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Creek 1.
Monthly Net Generation for Big Creek 1
Big Creek 1 Details
Summary Information | |
---|---|
Plant Name | Big Creek 1 (317) |
Plant Address | 55325 Cascada Road, Big Creek, CA 93605 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 37.2042, -119.2396 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | November 1913 |
Annual Generation | 393.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | San Joaquin River |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator 1 Details Operating November 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 19.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 19.8 MW |
Winter Capacity | 19.8 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1913 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating November 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 15.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.8 MW |
Winter Capacity | 15.8 MW |
Minimum Load | 1.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1913 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating July 1923
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 21.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 21.6 MW |
Winter Capacity | 21.6 MW |
Minimum Load | 2.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1923 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating June 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 31.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 31.2 MW |
Winter Capacity | 31.2 MW |
Minimum Load | 3.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1925 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Big Creek 1 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#108 | Long Lake | Ford, WA | 413.0 GWh |
#109 | Mitchell Dam | Verbena, AL | 409.4 GWh |
#110 | Ross | Rockport, WA | 407.9 GWh |
#111 | Comerford | Monroe, NH | 405.1 GWh |
#112 | Bartletts Ferry | Salem, AL | 397.0 GWh |
#113 | Thompson Falls | Thompson Falls, MT | 396.3 GWh |
#114 | Bradley Lake | Homer, AK | 395.1 GWh |
#115 | Rainbow (MT) | Great Falls, MT | 394.9 GWh |
#116 | Markland | Florence, IN | 394.7 GWh |
#117 | Cabot | Montague, MA | 394.4 GWh |
#119 | Curtis Palmer Hydroelectric | Corinth, NY | 393.2 GWh |
#120 | Kerckhoff 2 | Auberry, CA | 389.8 GWh |
#121 | Box Canyon | Ione, WA | 383.5 GWh |
#122 | Hartwell Lake | Hartwell, GA | 378.9 GWh |
#123 | Parker Dam | Parker, CA | 378.4 GWh |
#124 | Keswick | Redding, CA | 377.6 GWh |
#125 | C J Strike | Bruneau, ID | 377.1 GWh |
#126 | James B Black | Big Bend, CA | 376.5 GWh |
#127 | Trinity | Weaverville, CA | 370.5 GWh |
#128 | Old Hickory | Hendersonville, TN | 368.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Creek 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A G Wishon | North Fork, CA | 16.1 GWh | 15.1 mi |
Balch 1 | Balch Camp, CA | 184.4 GWh | 22 mi |
Balch 2 | Balch Camp, CA | 489.7 GWh | 22.1 mi |
Big Creek 2 | Auberry, CA | 296.2 GWh | 3.7 mi |
Big Creek 2A | Auberry, CA | 536.5 GWh | 3.7 mi |
Big Creek 3 | Auberry, CA | 745.8 GWh | 9 mi |
Big Creek 4 | North Fork, CA | 428.0 GWh | 14.5 mi |
Big Creek 8 | Auberry, CA | 152.9 GWh | 4.9 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 35 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 29.3 mi |
Haas | Balch Camp, CA | 541.0 GWh | 22.6 mi |
J S Eastwood | Shaver Lake, CA | 22.1 GWh | 4 mi |
Kerckhoff 2 | Auberry, CA | 389.8 GWh | 19.8 mi |
Kings River PH | Balch Camp, CA | 206.7 GWh | 22.3 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 32.4 mi |
Mammoth Pool | North Fork, CA | 520.8 GWh | 5.5 mi |
Pine Flat | Piedra, CA | 485.0 GWh | 26.1 mi |
Portal | Lakeshore, CA | 21.2 GWh | 5.7 mi |
San Joaquin 2 | North Fork, CA | 1.5 GWh | 14.2 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 35 mi |