Bethlehem Power Plant
2254 Applebutter Road, Bethlehem, PA 18015Plant Summary Information
Bethlehem Power Plant is ranked #14 out of 231 power plants in Pennsylvania in terms of total annual net electricity generation.
Bethlehem Power Plant is comprised of 8 generators and generated 1.7 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Bethlehem Power Plant |
---|---|
Utility Name | Calpine Bethlehem LLC |
Location | Northampton County, PA |
Initial Operation Date | December 2002 |
Last Update | Sep 2024 |
Annual Generation | 6.1 TWh |
Annual Consumption | 54.2 M MMBtu |
Ranked #156 out of 11,852 Power Plants Nationwide | |
Ranked #67 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #14 out of 231 Pennsylvania Power Plants | |
Ranked #10 out of 78 Pennsylvania Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Bethlehem Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bethlehem Power Plant.
Monthly Net Generation for Bethlehem Power Plant
Bethlehem Power Plant Details
Summary Information | |
---|---|
Plant Name | Bethlehem Power Plant (55690) |
Plant Address | 2254 Applebutter Road, Bethlehem, PA 18015 |
Utility | Calpine Bethlehem LLC (56607) |
Latitude, Longitude | 40.6175, -75.3147 |
Generation Dates on File | Mar 2003 to Sep 2024 |
Initial Operation Date | December 2002 |
Annual Generation | 6.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 02-163-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Lehigh River |
Ash Impoundment | No |
Transmission / Distribution Owner | PPL Electric Utilities Corp (14715) PA |
Grid Voltage | 500.00 kV / 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | UGI UTILITIES |
Natural Gas Storage | No |
Generator CTG1 Details Operating December 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1234 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | 5021694 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021694 |
Nameplate Capacity | 127 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 118 MW |
Net Winter Capacity With Natural Gas | 118 MW |
Net Summer Capacity With Oil | 118 MW |
Net Winter Capacity With Oil | 118 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CTG2 Details Operating December 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1234 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | 5021695 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021695 |
Nameplate Capacity | 127 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 127 MW |
Net Winter Capacity With Natural Gas | 127 MW |
Net Summer Capacity With Oil | 127 MW |
Net Winter Capacity With Oil | 127 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CTG3 Details Operating December 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1234 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | 5021696 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021696 |
Nameplate Capacity | 127 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 127 MW |
Net Winter Capacity With Natural Gas | 127 MW |
Net Summer Capacity With Oil | 127 MW |
Net Winter Capacity With Oil | 127 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CTG5 Details Operating January 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 5678 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | 5021698 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021698 |
Nameplate Capacity | 127 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 118 MW |
Net Winter Capacity With Natural Gas | 118 MW |
Net Summer Capacity With Oil | 118 MW |
Net Winter Capacity With Oil | 118 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator STG8 Details Operating December 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 5678 |
Ownership | Single Owner |
Duct Burners | No |
RTO ISO LMP Node Designation | 32947159 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 32947159 |
Nameplate Capacity | 195.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 193 MW |
Winter Capacity | 193 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 195 MW |
Net Winter Capacity With Natural Gas | 195 MW |
Net Summer Capacity With Oil | 195 MW |
Net Winter Capacity With Oil | 195 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CTG6 Details Operating February 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 5678 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | 5021699 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 5021699 |
Nameplate Capacity | 127 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 127 MW |
Net Winter Capacity With Natural Gas | 127 MW |
Net Summer Capacity With Oil | 127 MW |
Net Winter Capacity With Oil | 127 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CTG7 Details Operating April 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 5678 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | 32947155 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 32947155 |
Nameplate Capacity | 127 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 125 MW |
Winter Capacity | 125 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 127 MW |
Net Winter Capacity With Natural Gas | 127 MW |
Net Summer Capacity With Oil | 127 MW |
Net Winter Capacity With Oil | 127 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator STG4 Details Operating May 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 1234 |
Ownership | Single Owner |
Duct Burners | No |
RTO ISO LMP Node Designation | 32947157 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 32947157 |
Nameplate Capacity | 195.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 193 MW |
Winter Capacity | 193 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 195 MW |
Net Winter Capacity With Natural Gas | 195 MW |
Net Summer Capacity With Oil | 195 MW |
Net Winter Capacity With Oil | 195 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Bethlehem Power Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#57 | Lee Combined Cycle Plant | Goldsboro, NC | 6.6 TWh |
#58 | Oregon Clean Energy Center | Oregon, OH | 6.6 TWh |
#59 | Dania Beach 7 | Ft. Lauderdale, FL | 6.6 TWh |
#60 | Marcus Hook Energy LP | Marcus Hook, PA | 6.6 TWh |
#61 | Magnolia Power Plant | Ashland, MS | 6.5 TWh |
#62 | Clean Energy Future-Lordstown, LLC | Lordstown, OH | 6.5 TWh |
#63 | Hamilton Patriot Generation Plant | Montgomery, PA | 6.4 TWh |
#64 | Cape Canaveral | Cocoa, FL | 6.3 TWh |
#65 | Allen | Memphis, TN | 6.2 TWh |
#66 | P L Bartow | St. Petersburg, FL | 6.2 TWh |
#68 | Montgomery County | Willis, TX | 6.1 TWh |
#69 | Belews Creek | Belews Creek, NC | 8.9 TWh |
#70 | Midlothian Energy Facility | Midlothian, TX | 6.0 TWh |
#71 | Santan | Gilbert, AZ | 6.0 TWh |
#72 | Hamilton Liberty | Towanda, PA | 6.0 TWh |
#73 | Taft Cogeneration Facility | Hahnville, LA | 6.0 TWh |
#74 | Lake Charles Power | West Lake, LA | 5.9 TWh |
#75 | Lake Side Power Plant | Vineyard, UT | 5.9 TWh |
#76 | Polk | Mulberry, FL | 5.8 TWh |
#77 | Linden Cogen Plant | Linden, NJ | 5.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bethlehem Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Berry Plastics Solar | Phillipsburg, NJ | 15.8 GWh | 10.2 mi |
Crayola Solar Project | Easton, PA | 2.6 GWh | 10.7 mi |
Franklin Solar | Franklin Township, NJ | 13.3 GWh | 15.1 mi |
Frenchtown I Solar | Frenchtown, NJ | 4.1 GWh | 17.2 mi |
Frenchtown III Solar | Frenchtown, NJ | 9.6 GWh | 18.2 mi |
Gilbert | Milford, NJ | 26.8 GWh | 8.7 mi |
Green Knight Energy Center | Pen Argyl, PA | 44.0 GWh | 16.9 mi |
Harmony | Phillipsburg, NJ | 4.3 GWh | 12.1 mi |
Holland Solar | Milford, NJ | 2.9 GWh | 10.9 mi |
Holland Solar Farm | Holland Township, NJ | 9.8 GWh | 8.4 mi |
Lower Mount Bethel Energy | Bangor, PA | 4.3 TWh | 16.7 mi |
Mid-River PA, LLC (ABE4) | Easton, PA | 4.5 GWh | 8.7 mi |
Milford Solar Farm (NJ) LLC | Milford Township, NJ | 11.1 GWh | 8.3 mi |
Northampton Generating Company LP | Northampton, PA | 499.4 GWh | 10 mi |
Perkasie PA BTM | Perkasie, PA | 99.0 MWh | 16.5 mi |
Pohatcong Solar Farm | Pohatcong, NJ | 12.6 GWh | 8.9 mi |
Quakertown PA BTM | Quakertown, PA | 12.0 MWh | 11.9 mi |
TalenEnergy Martins Creek | Bangor, PA | 1.9 TWh | 16.6 mi |
Trexlertown Solar Array North and South | Allentown, PA | 1.8 GWh | 15.2 mi |
Warren County Solar | Belvidere, NJ | 2.5 GWh | 16.1 mi |