Berry Placerita Cogen is ranked #118 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Berry Placerita Cogen is comprised of 2 generators and generated 24.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Berry Placerita Cogen |
---|---|
Utility Name | Shadow Wolf Energy |
Location | Los Angeles County, CA |
Initial Operation Date | March 1990 |
Last Update | Aug 2024 |
Annual Generation | 35.3 GWh |
Annual Consumption | 523.6 k MMBtu |
Ranked #4,322 out of 11,835 Power Plants Nationwide | |
Ranked #1,231 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #574 out of 1,569 California Power Plants | |
Ranked #118 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Berry Petroleum Co (2013 to 2021) Shadow Wolf Energy (2022 to 2023) |
Map of Berry Placerita Cogen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Berry Placerita Cogen.
Monthly Net Generation for Berry Placerita Cogen
Berry Placerita Cogen Details
Summary Information | |
---|---|
Plant Name | Berry Placerita Cogen (52096) |
Plant Address | 25121 N Sierra Hwy, Santa Clarita, CA 91321 |
Utility | Shadow Wolf Energy (65145) |
Latitude, Longitude | 34.38407, -118.49488 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | March 1990 |
Annual Generation | 35.3 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 86-703-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Petroleum and Coal Products Manufacturing (324) |
Sector | Industrial CHP (7) |
Water Source | well |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GEN1 Details Operating March 1990
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SP15 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SP15 |
Nameplate Capacity | 21.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 20 MW |
Winter Capacity | 20.7 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1990 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating May 1990
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SP15 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SP15 |
Nameplate Capacity | 21.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 20 MW |
Winter Capacity | 20.7 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1990 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Berry Placerita Cogen Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1221 | North Chicago Energy Center | North Chicago, IL | 36.0 GWh |
#1222 | Equinix Caspian Dr. Fuel Cell | Sunnyvale, CA | 35.9 GWh |
#1223 | Agnews Power Plant | San Jose, CA | 35.7 GWh |
#1224 | High Sierra Cogeneration Plant | Susanville, CA | 35.7 GWh |
#1225 | Bluegrass Generating Station | LaGrange, KY | 36.5 GWh |
#1226 | Antelope Valley | Beulah, ND | 5.0 TWh |
#1227 | Brentwood | Long Island, NY | 35.5 GWh |
#1228 | Grayson | Glendale, CA | 35.5 GWh |
#1229 | Androscoggin Mill | Jay, ME | 69.3 GWh |
#1230 | Solomon Generating Facility | St. George, UT | 35.3 GWh |
#1232 | Greenleaf 2 Power Plant | Yuba City, CA | 35.1 GWh |
#1233 | Carson Cogeneration | Carson, CA | 34.8 GWh |
#1234 | Domtar Paper Co LLC Plymouth NC | Plymouth, NC | 344.1 GWh |
#1235 | University of Tennessee Steam Plant | Knoxville, TN | 34.6 GWh |
#1236 | Kern Oil & Refining Co | Bakersfield, CA | 34.6 GWh |
#1237 | Dartmouth Power Associates LP | Dartmouth, MA | 34.8 GWh |
#1238 | Gerald Gentleman | Sutherland, NE | 6.7 TWh |
#1239 | Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh |
#1240 | Total Energy Facilities | Carson, CA | 168.8 GWh |
#1241 | Keysight - Santa Rosa | Santa Rosa, CA | 34.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Berry Placerita Cogen.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
20701 Plummer PV, LLC | Chatsworth, CA | 2.4 GWh | 11 mi |
8500 Balboa PV, LLC | Northridge, CA | 5.4 GWh | 11.1 mi |
Ameresco Chiquita Canyon | Castaic, CA | 32.6 GWh | 9.1 mi |
Castaic Lake Phase II | Santa Clara, CA | 7.8 GWh | 3.5 mi |
CFW Solar X LLC - Vaughn | San Fernando, CA | 1.0 GWh | 8.3 mi |
CSU Northridge Plant | Northridge, CA | 819.0 MWh | 9.9 mi |
East Portal Generator | Chatsworth, CA | 4.0 GWh | 11.2 mi |
Foothill | Sylmar, CA | 32.2 GWh | 4.5 mi |
Foothill Feeder | Castaic, CA | 19.6 GWh | 11.1 mi |
Maclay Solar Project | Sylmar, CA | 901.5 MWh | 5.8 mi |
MM Lopez Energy | Lake View Terrace, CA | 26.4 GWh | 8.7 mi |
Nordhoff Place | Chatsworth, CA | 1.3 GWh | 11 mi |
Olive View Medical Center | Sylmar, CA | 11.4 GWh | 4.9 mi |
Prairie | Chatsworth, CA | 2.9 GWh | 11.2 mi |
San Fernando | Sylmar, CA | 17.8 GWh | 4.9 mi |
San Francisquito 2 | Saugus, CA | 69.0 GWh | 10.5 mi |
Sunshine Gas Producers | Sylmar, CA | 115.9 GWh | 3.6 mi |
VA Sepulveda Ambulatory Care Center | North Hills, CA | 4.7 GWh | 9.4 mi |
Valley (CA) | Sun Valley, CA | 1.5 TWh | 11.3 mi |
Xebec 1 | Sun Valley, CA | 2.7 GWh | 12.5 mi |