Berlin Gorham
972 Main Street, Berlin, NH 3570Plant Summary Information
Berlin Gorham is ranked #8 out of 55 power plants in New Hampshire in terms of total annual net electricity generation.
Berlin Gorham is comprised of 21 generators and generated 41.2 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Berlin Gorham |
---|---|
Utility Name | Great Lakes Hydro America LLC |
Location | Coos County, NH |
Initial Operation Date | January 1914 |
Last Update | Dec 2022 |
Annual Generation | 148.8 GWh |
Annual Consumption | 570.2 k MMBtu |
Ranked #2,690 out of 11,249 Power Plants Nationwide | |
Ranked #268 out of 1,354 Water Power Plants Nationwide | |
Ranked #8 out of 55 New Hampshire Power Plants | |
Ranked #3 out of 32 New Hampshire Water Power Plants | |
Fuel Types | Water |
Map of Berlin Gorham
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Berlin Gorham.
Monthly Net Generation for Berlin Gorham
Berlin Gorham Details
Summary Information | |
---|---|
Plant Name | Berlin Gorham (54639) |
Plant Address | 972 Main Street Berlin, NH 3570 |
Utility | Great Lakes Hydro America LLC (7595) |
Latitude, Longitude | 44.3889, -71.1645 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | January 1914 |
Annual Generation | 148.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 02-137-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Androscoggin River |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of NH (15472) NH |
Grid Voltage | 22.00 kV |
Energy Storage | No |
Generator CAS1 Details Operating January 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1914 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CAS2 Details Operating January 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1916 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SH2 Details Operating January 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1916 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SHL1 Details Operating January 1916
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1916 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CAS3 Details Operating January 1918
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3.1 MW |
Winter Capacity | 3.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1918 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GOR1 Details Operating January 1920
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1920 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GOR2 Details Operating January 1920
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1920 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GOR3 Details Operating January 1920
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1920 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GOR4 Details Operating January 1920
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1920 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator RS1 Details Operating January 1920
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3.8 MW |
Winter Capacity | 3.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1920 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator RS3 Details Operating January 1920
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 4.1 MW |
Winter Capacity | 4.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1920 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator XP1 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator XP2 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator XP3 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator XP4 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator XP5 Details Operating January 1924
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1924 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SHL3 Details Operating January 1929
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1929 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SM1 Details Operating October 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1980 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SM2 Details Operating October 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1980 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SM3 Details Operating October 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1980 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SM4 Details Operating October 1980
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1980 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Berlin Gorham Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#258 | Dale Hollow | Celina, TN | 157.3 GWh |
#259 | Wilder | Hartford, VT | 157.2 GWh |
#260 | Trenton Falls | Barneveld, NY | 155.5 GWh |
#261 | Cowans Ford | Stanley, NC | 155.5 GWh |
#262 | Vernon Dam | Vernon, VT | 155.2 GWh |
#263 | South Holston | Bristol, TN | 152.7 GWh |
#264 | Colton | Pierrepont, NY | 152.4 GWh |
#265 | Webbers Falls | Webbers Falls, OK | 150.7 GWh |
#266 | Fishing Creek | Great Falls, SC | 150.1 GWh |
#267 | Prairie Du Sac | Prairie du Sac, WI | 149.6 GWh |
#269 | Terror Lake Microgrid | Kodiak, AK | 148.6 GWh |
#270 | Melton Hill | Lenoir City, TN | 146.3 GWh |
#271 | Charles E Monty | Lewiston, ME | 144.6 GWh |
#272 | Snoqualmie 2 | Snoqualmie, WA | 144.2 GWh |
#273 | Glen Park Hydroelectric Project | Watertown, NY | 142.8 GWh |
#274 | Cedar Creek | Great Falls, SC | 141.6 GWh |
#275 | Jim Falls | Jim Falls, WI | 137.0 GWh |
#276 | Gulf Island | Lewiston, ME | 136.8 GWh |
#277 | North Highlands | Columbus, GA | 136.2 GWh |
#278 | Wissota | Chippewa Falls, WI | 135.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Berlin Gorham.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aziscohos Hydroelectric Project | Wilson Mills, ME | 28.5 GWh | 39.2 mi |
Burgess BioPower | Berlin, NH | 588.4 GWh | 5.8 mi |
Errol Hydroelectric Project | Errol, NH | 14.6 GWh | 27.6 mi |
Gilman Mill | Gilman, VT | 24.9 GWh | 27.6 mi |
Golden Solar | St. Johnsbury, VT | 3.9 GWh | 39.9 mi |
Gorham | Gorham, NH | 11.2 GWh | 2 mi |
Granite Reliable Power | Dummer, NH | 211.7 GWh | 22.7 mi |
GSPP Gilman, LLC | Lunenburg, VT | 3.5 GWh | 27.2 mi |
Jericho Power | Berlin, NH | 17.7 GWh | 6.2 mi |
Lost Nation | Groveton, NH | 403.2 MWh | 21.6 mi |
Oxford PV - BD Solar Oxford LLC | Oxford, ME | 16.4 GWh | 37.8 mi |
Pontook Hydro Facility | Dummer, NH | 46.5 GWh | 17.3 mi |
Record Hill Wind | Roxbury, ME | 138.8 GWh | 31.4 mi |
RoxWind | Roxbury, ME | 45.6 GWh | 31.1 mi |
Rumford Cogeneration | Rumford, ME | 455.8 GWh | 32.7 mi |
Rumford Falls Hydro Facility | Rumford, ME | 267.0 GWh | 28.6 mi |
S C Moore | Littleton, NH | 265.7 GWh | 35.3 mi |
Smith (NH) | Berlin, NH | 103.1 GWh | 5.6 mi |
Spruce Mountain WInd | Bryant Pond, ME | 66.5 GWh | 29.9 mi |
White Lake | Tamworth, NH | 1.9 GWh | 37.4 mi |