Berkshire Wind Power Project
108 Brodie Mountain Rd, Lanesboro, MA 1224Plant Summary Information
Berkshire Wind Power Project is ranked #45 out of 598 power plants in Massachusetts in terms of total annual net electricity generation.
Berkshire Wind Power Project generated 3.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Berkshire Wind Power Project |
---|---|
Utility Name | Massachusetts Mun Wholes Electric Co |
Location | Berkshire County, MA |
Initial Operation Date | May 2011 |
Last Update | Sep 2024 |
Annual Generation | 29.7 GWh |
Annual Consumption | 111.3 k MMBtu |
Ranked #4,566 out of 11,852 Power Plants Nationwide | |
Ranked #1,022 out of 1,345 Wind Power Plants Nationwide | |
Ranked #45 out of 598 Massachusetts Power Plants | |
Ranked #2 out of 20 Massachusetts Wind Power Plants | |
Fuel Types | Wind |
Map of Berkshire Wind Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Berkshire Wind Power Project.
Monthly Net Generation for Berkshire Wind Power Project
Berkshire Wind Power Project Details
Summary Information | |
---|---|
Plant Name | Berkshire Wind Power Project (57721) |
Plant Address | 108 Brodie Mountain Rd, Lanesboro, MA 1224 |
Utility | Massachusetts Mun Wholes Electric Co (11806) |
Latitude, Longitude | 42.58667, -73.275 |
Generation Dates on File | May 2011 to Sep 2024 |
Initial Operation Date | May 2011 |
Annual Generation | 29.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Western Massachusetts Electric Company (20455) MA |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator BWP Details Operating May 2011
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | UN.PARTRIDG23 BRKW |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 15 MW |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 10 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 10 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 16 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Generator HN-8 Details Operating September 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 7604 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 16 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Generator HN-9 Details Operating September 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 7604 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | .Z.WCMASS |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 0.1 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 16 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Berkshire Wind Power Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Berkshire Wind Power Cooperative Corp | 125 High Street, Boston, MA 2110 | Generator BWP | 100.00% |
Berkshire Wind Power Cooperative Corp | 125 High Street, Boston, MA 2110 | Generator HN-8 | 100.00% |
Berkshire Wind Power Cooperative Corp | 125 High Street, Boston, MA 2110 | Generator HN-9 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1012 | Thousand Springs Wind Park | Hagerman, ID | 32.2 GWh |
#1013 | Lakota Wind Wind Farm | Lakota, IA | 32.2 GWh |
#1014 | Meyersdale Windpower, LLC | Meyersdale, PA | 32.0 GWh |
#1015 | Pleasant Hill Wind Energy Project | Lorenzo, TX | 32.0 GWh |
#1016 | Coram Energy LLC (ECT) | Tehachapi, CA | 32.0 GWh |
#1017 | Pilgrim Stage Wind Park | Hagerman, ID | 31.8 GWh |
#1018 | Eva Creek Wind | Healy, AK | 31.1 GWh |
#1019 | Ridgetop Energy LLC | Mojave, CA | 31.1 GWh |
#1020 | Tuana Springs | Hagerman, ID | 31.0 GWh |
#1021 | Klondike Wind Power | Wasco, OR | 30.9 GWh |
#1023 | Horseshoe Bend Wind Park | Great Falls, MT | 29.4 GWh |
#1024 | Adams Wind Farm | Adams, MN | 29.3 GWh |
#1025 | Clearwater Wind III | Miles City, MT | 29.2 GWh |
#1026 | Karen Avenue Wind Farm | North Palm Springs, CA | 29.2 GWh |
#1027 | Willow Spring Windfarm (Burnt River) | Huntington, OR | 29.0 GWh |
#1028 | Tuana Gulch Wind Park | Hagerman, ID | 28.8 GWh |
#1029 | Golden Valley Wind Park LLC | Burley, ID | 27.8 GWh |
#1030 | Benson Creek Windfarm (Burnt River) | Huntington, OR | 26.8 GWh |
#1031 | CED Mason City Wind | Mason City, IA | 26.5 GWh |
#1032 | Creston Ridge Wind Farm | Creston, NE | 26.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Berkshire Wind Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Deerfield 5 | Florida, MA | 63.1 GWh | 17.7 mi |
East Acres Solar NG, LLC | Pittsfield, MA | 4.8 GWh | 7.1 mi |
Fife Brook | Florida, MA | 33.4 GWh | 16.6 mi |
Harbor Road Solar 1 | Cheshire, MA | 2.8 GWh | 7.4 mi |
Hinsdale Solar PV | Hinsdale, MA | 2.9 GWh | 13.2 mi |
Jiminy Peak Wind QF | Hancock, MA | 1.0 MWh | 3.1 mi |
New England Wind LLC | Florida, MA | 59.5 GWh | 16.2 mi |
Nexamp Peak CSG | Hancock, MA | 2.1 GWh | 1.8 mi |
North Adams Landfill | North Adams, MA | 3.4 GWh | 10.9 mi |
Pittsfield 44 - M&W PV | Pittsfield, MA | 1.5 GWh | 7.5 mi |
Pittsfield Generating LP | Pittsfield, MA | 33.7 GWh | 9.5 mi |
Savoy Solar PV | Savoy, MA | 3.1 GWh | 11.6 mi |
Silver Lake Solar Photovoltaic Facility | Pittsfield, MA | 1.4 GWh | 9.4 mi |
SVEP Solar Project Company | Pownal, VT | 1.9 GWh | 11.8 mi |
Syncarpha Hancock I CSG | Hancock, MA | 2.9 GWh | 11.1 mi |
Syncarpha Hancock II CSG | Hancock, MA | 3.1 GWh | 11.6 mi |
Syncarpha Hancock III CSG | Pittsfield, MA | 1.5 GWh | 11.3 mi |
Truck Stop | West Stockridge, MA | 3.2 GWh | 18.1 mi |
Waste Water Treatment Plant | Pittsfield, MA | 763.0 MWh | 12.3 mi |
Williams College - Campus CHP | Williamstown, MA | 2.0 GWh | 9.3 mi |